• 제목/요약/키워드: PGOMS

검색결과 2건 처리시간 0.018초

제주 Smart-Grid 대규모 실증단지 구축 현황 (A Large Scale Smart-Grid field-test in Jeju)

  • 남궁원;하복남;이성우;서인용;장문종
    • 전기학회논문지
    • /
    • 제61권1호
    • /
    • pp.1-6
    • /
    • 2012
  • Five smart grid projects was started with large scale at Jeju Island in South Korea from 2009, and smart-grid test-bed was started in Nov. 2010. The five projects are Smart Power Grid (SPG), Smart Renewable (SR), Smart Transportation (ST), Smart Place (SP) and Smart Electric Service (SES). Korea government constructed the smart grid public relations center at Nov. 2010 in Jeju Island and there will be continued the field operation and interface testing among five smart gird projects until May. 2013.

공통정보모델(CIM) 기반의 실시간 전압안정도 해석 (CIM-based System for Real-time Voltage Stability Analysis)

  • 이성우;장문종;서동완;남궁원;허성욱
    • 전기학회논문지
    • /
    • 제64권1호
    • /
    • pp.48-56
    • /
    • 2015
  • There is a wide variety of system and applications in the power system. However, they have compatibility issues because they use different data standard and communication method. With the introduction of the smart grid, power system has been grow and diversified. Therefore power system need to be compatible with each other and the interoperability between applications is increasingly important. Thus, the IEC established IEC61970 and CIM Standard data exchange model for interoperability and system integration. Server-Client system was constructed which using CIM HSDA(Part4), a standard communication model, presented in IEC 619710. Also, self-developed real-time voltage stability analysis application and contingency analysis application was used. CIM HSDA was used for data input and real-time analysis. Tolerance of result which is in the range of allowable derived by Perform real-time voltage stability and contingency analysis of Jeju power system, and then compare it's result with PSS/E result.