• Title/Summary/Keyword: PERT Chart

Search Result 12, Processing Time 0.019 seconds

Feasibility Study on the Duration of Shiwha Techno-Valley through Simulation (시뮬레이션을 이용한 시화 테크노 벨리 공기 적정성 검토연구)

  • Kim Kyong-Ju;Kim Byeong-Soo;Chun Jin-Ku;Lee Jeong-Hun;Yun Won-Gun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.495-499
    • /
    • 2003
  • As an alternative to overcome the limitations of current popular schedule system such as Bar Chart, PERT, CPM in proving the feasibility of a given project schedule and duration, this research applies simulation to the 'Shiwha Techno-Valley project, and then reviews its usability in time management. Shiwha-Techno-Valley is a gigantic project requiring large number of equipment and resulting in traffic congestion. In particular, project site is located near the Shiwha industrial complex and Daeboo-Do tourist place. Therefore, current traffic needs should not be ignored. This research evaluates whether the project can be finished in a given time even if construction equipment increase in addition to the current traffic. Through the analysis of the simulation output, the research identifies the optimal resource input and the needs on alternative schedule for the project.

  • PDF

On Study of Setting up Plan and Utilization of Project with Project Tool (프로젝트 툴을 이용한 일정 계획의 수립 및 활용 방안)

  • Kim Gil-Choon
    • Journal of Digital Contents Society
    • /
    • v.5 no.2
    • /
    • pp.106-113
    • /
    • 2004
  • Once the objective of project is set up to alter the present situation to acertain future situation necessary measures need to be taken to accomplish it. In the past, making a plan and transformation was done in the form of handwork, but this article addresses analyzing and handing the project data by using a tool of Microsoft Office System and then by making a reasonable plan. This system also helps transform project data into Excel data and analyze it using Excel, and transform project data into xml data and construct xml database so that it makes it possible to handle and use data efficiently, and to set up automatic project system in the future which leads to efficient project management.

  • PDF