• Title/Summary/Keyword: PDHRS

Search Result 1, Processing Time 0.015 seconds

A Comparative Study on Mitigation Alternatives in Response to an Extended SBO for APR1400 Using Systems Engineering (확장된 소내전원 상실 사고시의 대체대응활동 완화를 위한 비교 연구: 시스템 엔지니어링 관점으로)

  • Elaswakh, Islam Sabry;Oh, SJ;Lim, Hak-Kyu
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.12 no.2
    • /
    • pp.91-99
    • /
    • 2016
  • The safety of nuclear power plants has received much attention; this safety largely depends on the continuous availability of electrical energy source during all modes of nuclear power plant operation. A station blackout (SBO) describes the loss of the off-site electric power, the failure of the emergency diesel generators, and the unavailability of the alternate AC (AAC) power. Consequently, all systems that are AC powered such as the safety injection, shutdown cooling, component cooling water, and essential service water systems are unavailable. The aim of this study is to investigate the deficiencies of the existing alternatives for coping with an extended SBO for APR1400 design. The method is analyzing the existing deficiencies and proposing an optimal solution for the NPP design during the extended SBO. This study, established a new passive system, called passive decay heat removal system (PDHRS), using systems engineering approach.