Experimental Studies on Bond and Splice Performance of Splice Sleeve for Connecting Rebar (철근연결용 스플라이스 슬리브의 이음 및 부착성능에 대한 실험적 연구)

  • Kang, Duk Man;Park, Yong Gul;Lee, Hyeon Gi;Moon, Do Young
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.2
    • /
    • pp.257-264
    • /
    • 2017
  • The PC (Precast Concrete) construction method is a technique where concrete members that have been produced in a plant are constructed on site. Thus, continuity and secure integration of a structure that can be obtained by connecting rebars at splicing joint for PC members are the main areas of concern for this method. To evaluate the splicing and bonding performance according to application of a splice sleeve for connecting rebar in this research study, the diameter of rebar, development length, grouting strength etc. were set as variables. The performance and stiffness of splicing according to the development length of grout strength were measured and evaluated. In addition, by conducting comparative analysis on each of the variables, the factors that affected the splice sleeve for connecting rebar were discussed. The results confirmed that the strength and stiffness of the splice sleeve for connecting rebar were significantly affected by the development length while the increase in performance according to grout strength was not as significant.

Measurement of Verticality and Joint Gaps of a Near-surface Disposal Facility Vault Through a Mock-up Test for Fill-up Stages (표층처분시설 처분고의 목업테스트를 통한 채움단계별 수직도 및 이음부 벌어짐 측정)

  • Choi, Dong-Ho;Ann, Ki-Yong;Choi, In-Yong;Lee, Hyuk-Jin
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.9 no.4
    • /
    • pp.537-544
    • /
    • 2021
  • In order to describe the fill-up stages of a near-surface disposal facility vault, a mock-up test is performed, and its behavior during the fil l -up stages is investigated. On an in-site concrete foundation with a l ength of 6600mm, a width of 6600mm and a thickness of 400mm, a reinforced concrete disposal vaul t is manufactured with 4 precast (PC) corner wal l s and 8 PC side wal l s. 36 wasted drums are pl aced on the 1st fl oor in 6 by 6, and then the empty space is fil l ed with grout fil l er. These processes are repeated up to the 5th floor, and the verticality and the joint gaps are measured for each fill-up stage. The verticality is measured using a level at 6 positions on each side wall (3 positions on the left and right sides, respectivel y), i.e. a total of 24 positions on the 4 side wal l s. The joint gaps are measured at 9 positions on each side wal l (3 positions on the left, center and right sides, respectively), I.e. a total 36 positions on the 4 side walls. To measure the joint gaps, crack tips are installed on the left and right sides of every joint gap, and vernier calipers are used. The measured verticality obtained through the mock-up test was found to be ±0.1° based on the initial stage (ST0), and the result of the joint gap was up to 0.38mm. This appears to have a negligible effect on the structure.