KSCE Journal of Civil and Environmental Engineering Research
/
v.28
no.1B
/
pp.1-9
/
2008
The impact of snow accumulation and snowmelt in rainfall-runoff modelling was analyzed for the Soyanggang dam basin by comparing the measured and simulated discharges simulated by the NWS-PC model. Sugawara's conceptual model was used to simulate the snow accumulation and snowmelt phenomena and NWS-PC model was employed to simulate rainfall-runoff. Parameters in model calibration were estimated by the Multi-step Automated Calibration Scheme and optimized using SCE-UA algorithm in each step. The results of the model calibration and verification show that the model considering snowmelt process is better than the one without consideration of snowmelt under the performance criteria such as RMSE, PBIAS, NSE, and PME. The measured discharge time series has over 60 days of persistence. Correlograms for each simulation showed that the simulated discharge with snowmelt model reproduce the persistence closely to the measured discharge's while the one without snow accumulation and snowmelt model reproduce only 20 days of persistence. The study result indicates that the inclusion of snow accumulation and snowmelt model is important for the accurate simulation of rainfall-runoff phenomena in the Soyanggang dam basin.
한국건설기술연구원 구조연구실에서는 한국전력공사 토건연구실과 공동으로 N5200기종을 이용하여 철근콘크리트로 된 건축라멘구조의 해석 및 설계를 일관작업으로 시행할 수 있는 프로그램 KARST.1을 개발하였다. 본래 OA(Office Automation)용으로 개발된 N5200 기종은 현재 많은 분야에 보급, 사용되고 있는 IBM PC호환기종 보다 그 보급대수는 적지만 국내 여러기관에서 사용되고 있으며 계속적인 기계 성능의 향상과 다양한 Utility를 제공함으로써 적용분야를 증가시킬 수 있으리라 본다. 그러나 과학기술용으로 적용하기에는 아직 불편한 점이 많아 이 기종을 사용하여 구조물해석, 설계용으로 프로그램을 개발할 때 발생된 문제점과 KARST.1의 기능 및 특징을 간단히 소개하겠다.
This study reports the properties of high early strength & durability of concrete using PC admixture. To apply these data to construction site, we did the lab tests. The target of this study is to accomplish early strength of concrete (5.0 Mpa/18 hr), and we did the durability tests such as length change test, chloride ion penetration test, fleeting and thawing test, adiabatic test, etc. And we tested the porperties of concrete by the different factors, such as the type of admixtures, curing temperature, the amount of binder, etc. Through the test of concrete using the different type of admixture, PC type was more excellent than PNS type admixture. As a result, we made a concrete of high early strength concrete, and excellent durable concrete. According to these tests, we concluded that we can apply this type of PC admixture to the civil & construction site, and we can reduce the term of works and finally we will accomplish the economical construction.
Journal of the Korean Association of Geographic Information Studies
/
v.15
no.4
/
pp.55-64
/
2012
This study developed a mobile application system for serving cadastral information needed to propel diverse cadastral works including cadastral resurvey efficiently. First, BlackPoint-Xr was selected as a spatial client engine to embody the cadastral information system based on mobile device including smart phone and tablet PC. The mobile cadastral information system contains functions such as finding location with GPS based on spatial information such as aerial photo, cadastral map, administrative map, and digital map, parcel search with address and lot number, finding land register including land address, the classification of land, and land price. Especially, this study developed functions which can analyze the measurement of distance, area, slope and cross-section elevation of land to apply construction work and land maintenance project. This system can support efficiently cadastral work and construction project by serving diverse cadastral information to users in field and can be also applied to the field of digital cadastral information.
Kim, Yong-Il;Hwang, Nak-Yeon;Jeong, Du-Seok;Cha, Jong-Hwi;Lee, Nae-Yong
Proceedings of the Korean Society for Rock Mechanics Conference
/
2006.03a
/
pp.195-203
/
2006
The crossing construction under railroad have two methods which are cut and cover and trenchless method. first, cut and cover method is an extremely limited method concerning non-running time. Whereas, trenchless method is free from restriction such as train speed and running time, and has the strong points of safe and rapid construction. Front Jacking method, one of the trenchless methods, is frequently applied recently due to its stability during construction and vantage of assuring schedule reliability. The procedure is that after minimizing interlocking friction with structure and earth pressure due to jacking the small steel tube, pulling the precast box manufactured at the field in the ground using PC strand and hydraulic Jack. This method is able to be applied regardless of section size and length of box and condition of ground. And that is also pro-environmental. This paper presents the case of Daejeon E. W. perforate Road Project applied with the Front Jacking method.
Proceedings of the Korea Water Resources Association Conference
/
2008.05a
/
pp.1784-1788
/
2008
전자파표면유속계는 여러 측정지점을 가능한 신속하게 이동하면서 홍수시 유속을 측정하는데 그 목적이 있다. 또한 홍수시 유속은 시간대 별로 급격히 변하는 속성을 가지고 있으므로 유량측정 지점의 유량을 실시간으로 획득하기 위해서는 현장 측정에서 측정한 유량데이터가 실시간으로 집계 되어야한다. 현재의 시스템은 측정 정보를 실시간으로 전송하기 위하여 현장 측정자에게 PDA가 보급되어 있으며 CDMA망을 통해서 유량 측정을 위한 각종 정보 및 측정결과를 실시간 전송하도록 되어있다. 그러나 전자파표면유속계를 비롯한 각종 유속계가 PDA와 무선으로 통신을 할 수 있게 되어있지 않기 때문에 열악한 여건의 현장에서 측정한 데이터를 야장에 수기로 기록한 후 이를 다시 PDA에 수동으로 입력시켜야하는 불편함이 있다. 전자파표면 유속계를 제외한 다른 측정 장비는 제조회사가 수자원공사와 독립적인 업체이므로 통신 접속을 하기위한 특정 인터페이스를 알아내기가 어려운 실정이다. 그러나 전자파표면유속계는 수자원공사에서 개발한 장비로서 핵심기술을 수자원공사에서 보유하고 있으므로 PDA와 통신을 가능하게 하는 장치의 개발이 가능하다. 이에 이러한 불편한 문제점을 개선하여 현장에서 홍수 유량 측정시 작업자들의 편이성을 증대시키고자 전자파표면유속계와 PDA간에 근거리통신기법을 적용하였다. 이를 위하여 Bluetooth, UWB(Ultra-Wide Band, 초광대역통신), Zigbee 등 적용가능한 근거리 통신기법을 조사하였다. 그 결과 Zigbee가 소비전력이 적어 현장에서 홍수유량측정에 이용되는 전자파표면유속계에 적용성이 가장 뛰어난 것으로 나타났다. 무선통신 모듈과 연동되는 전자파표면유속계는 이동식을 기준으로 적용하였으며 기존 신호처리부에 무선통신 모듈을 장착할 수 있는 구조로 설계하였다. 장착 방식은 기존 이동식 유속계의 신호처리부의 RS-232 포트에 무선통신 모듈을 장착하면 사용할 수 있는 구조로 되어있다. 신호처리부 RS-232 포트는 현재까지는 측정한 유속값을 PC로 전송받는 용도로 활용되었으나 무선모듈 장착 시에는 무선통신 할 수 있는 이중화 구조를 채택하였다. 두 가지 방식에 대한 통신구별은 초기에 송수신하는 데이터에 따라 구별되도록 하였다. 신호처리부에서 무선통신 추가에 따른 운용 방식은 별도의 수자원공사 모드를 추가하여 운용하도록 수정하였다. 유속 측정 시에는 무선통신 모듈을 제거한 상태에서 측정한 후, 측정한 데이터를 PDA로 전송할 때 아를 부착하여 사용할 수 있는 구조를 갖도록 제작하였다. 이러한 방식을 적용시킨 이유는 기존에 보급된 유속계에 무선모듈을 장착한 후, 신호처리부 운용 프로그램을 업그레이드하면 바로 사용할 수 있도록 하기 위함이다.
Korean Journal of Construction Engineering and Management
/
v.22
no.5
/
pp.86-98
/
2021
In this study, we developed a simulation model for supply chain management of Precast Concrete (PC) based construction. To this end, information on the Factory Production/Site Construction system was collected through literature review and field research, and based on this information, a simulation model was defined by describing the supply chain, entities, resources, and processes. Next, using the Arena simulation software, a simulation model for the PC supply chain was developed by setting model frameworks, data modules, flowchart modules, and animation modules. Finally, verification and validation were performed using five review methodologies such as model check, animation check, extreme value test, average value test, and actual case test to the developed model. As a result, it was found that the model adequately represented the flows and characteristics of the PC supply chain without any logical errors and provided accurate performance evaluation values for the target supply chains. It is expected that the proposed simulation model will faithfully play a role as a performance evaluation platform in the future for developing management techniques in order to optimally operate the PC supply chain.
Journal of the Korea Institute of Building Construction
/
v.23
no.4
/
pp.465-476
/
2023
This study introduces the development of a precast concrete double-wall, applicable to basement construction in apartment buildings. Unlike traditional precast concrete double walls, the developed double-wall doesn't require specialized manufacturing equipment such as a lathe. The constructability of these advanced technologies was validated through a full-scale mock-up test using the precast concrete double wall. The test specimens were constructed to represent a structural wall with a thickness of 250mm. It was observed that the quality of the in-situ concrete, filled between two single panels of 110mm thickness each, was excellent. The construction efficiency of the developed double-wall system for basement construction in an apartment building was also examined. Expert interviews about installation times of precast concrete elements were conducted to evaluate the speed of the basement floor's installation. The results showed that installation of precast concrete elements, including the proposed double walls, could be completed within 20 to 29 days for a basement in an apartment building. This indicates a three-fold increase in construction efficiency compared to traditional methods relying on in-situ casting.
This study aims at the development of a cost management system in building interior projects. Renovation and remodeling is activated and expanded much more being compared with new building construction at present. After Interior project proceeding must get out of simple estimate and assumption, then its be needed a formal work process and computerized cost management. Proceeding a building interior project management was proceed in the office and the field. Cost break down, especially, depend on the field manger and used fiend managing money because its not checked by cost manager in office manger. For this study, cost factors are defined in terms of cost break-down interior works which consist of materials and labors. A data model for cost factors was developed, and a relational database is used to realize cost data management based upon this data model. Data input and output are achieved by internet from both of wired PC and mobile phone. This system can timely display a number of needed reports for cost management that identifies cash flow and predicts budget for cost break-down works in interior projects.
Kim, Kyeong-Ho;Choi, Jung-Ho;An, Jung-Seng;Kim, Nak-Gyeom
Proceedings of the Korea Concrete Institute Conference
/
2008.11a
/
pp.895-898
/
2008
This research paper intends to investigate and review the new technology of patent registration trend for the most recent domestic retaining wall and bridge abutment, and to apply the technology appropriately to the actual retaining wall and bridge abutment construction. Investigated new technological patents for retaining wall include pre-fabricated PC retaining wall construction method that reduces section force with prestressed PS steel bars, pre-fabricated Coupler-Tension retaining wall, clay reinforced retaining wall block for road, earth reinforced retaining wall block that induces uniform settlement, and etc. Investigated new technologies for abutment are abutment construction method that uses sheet pile, monolithic bridge with complex abutments, construction method for abutment bridge, earth reinforced abutment structure and etc.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.