A Study on Development of Construction Standard Production Rates and Cost Analysis for Off-Site Construction (OSC)-Based PC Structure Construction Costs - Comparison with RC Method - (OSC기반 PC구조 공사비 산정을 위한 품셈개발 및 공사비 분석 - RC공법과 비교 -)

  • Lee, Hansoo;Lee, Chiho;Han, Heesu;Lee, Jeongwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.56-68
    • /
    • 2024
  • A construction standard production rates system for the factory built and on-site installation phases of OSC (Off-Site Construction)-based precast concrete (PC) structures in apartment buildings was recently proposed to establish an objective cost standard (Lee et al., 2021). In addition, the Korean government has taken steps to improve the institutional foundation for the systematic calculation of PC construction costs such as revising construction standard production rates for major components that can be applied to the on-site installation phase of PC method. In this study, we analyzed the results of a field survey of apartment building PC structures and collected expert opinions to develop factory-built and on-site installation standard production rates that can be applied to apartment building PC method. We also propose directions for improving the standard production rates so that they can be applied to the site and component of apartment buildings by comparing them with the current standard production rates. This study also derived the cost characteristics and cost reduction measures of PC construction by calculating the construction costs using the developed rates and comparing the construction costs with the RC methods of apartment buildings of the same scale. The construction standard production rates for PC construction derived in this study are expected to contribute to the spread of PC construction by ensuring the objectivity and consistency of the results of PC methods cost estimation.

Development of the Construction Procedures Prototype and Analysis of Construction Period for the HPC Method (HPC공법의 공사절차 프로토타입 개발 및 공사기간 분석)

  • Kim, Jae-Yeob
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.6
    • /
    • pp.577-585
    • /
    • 2017
  • HPC method is developing to improve the constructability and structural performance of the existing PC method. The objective of this study is to develop construction procedures and to analysis of construction period for HPC method. In order to develop construction procedures, the building construction data of the existing half-slab method was analyzed. Analyzing design drawings and specifications of nine construction cases, a prototype of half-slab method, was drawn. Applying the core technology of HPC method to the drawn prototype of half-slab method, a prototype of HPC method, was developed. The differences of both methods were 'installing PC column' and 'placing topping concrete'. To analysis the differences of both methods, seven construction cases were analyzed. According to the analysis for HPC method, cases1 and 2 had columns divided for construction shortened about 16% of a construction period. The schedule of column assembly work was analyzed to be shortened much. That is judged to be because the use of a hollow PC column leads to a decrease in the number of columns. In particular, if HPC method is applied to a building construction site using large columns, it is analyzed to shorten a construction period more than the existing Half-slab method.

Economic Evaluation of the Centrifugal Formed Shell PC Columns (원심성형 중공 PC기둥의 경제성 평가)

  • Park, Jin-Young;Yang, Won-Jik;Ryu, Hong-Sik;Yi, Waon-Ho;Oh, Sang-Hoon
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.163-164
    • /
    • 2009
  • Recently, RC construction method has needs of many construction expenses and previous by accessory construction progress in construction field. On the other hand, Shell PC column reduces construction expenses and previous. Therefore, the purpose of this study is to the analyze the economical propriety about Centrifugal Formed Shell PC columns application of a field as compared with the RC and PC construction method.

  • PDF

Analysis of Factors for Improvement of Economic Feasibility of Construction Cost to Spread Application of OSC Construction Method for Apartment Housing (공동주택 OSC공법 적용 확산을 위한 공사비 분야 경제성 개선 요인 분석 - PC 부재 설계, 제작, 운송, 시공을 중심으로 -)

  • Yun, WonGun;Shin, Eun-Young;Kang, Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.55-63
    • /
    • 2021
  • Recently, as the problem of the traditional on-site labor-intensive construction production method has been raised due to changes in construction work labor and site conditions, the OSC method is gradually spreading as an alternative to this. Even in apartment houses, the application of the PC method is expanding centered on the underground parking lot, but the high cost structure is a problem compared to the conventional formwork method. In this study, factors affecting the calculation of construction cost in the economic evaluation, which are the core of determining the construction method for apartment buildings, are derived through domestic and foreign literature review and expert advice, the importance was analyzed through an opinion survey targeting industry experts. The measures to reduce construction cost were mainly derived from the improvement of the design and manufacturing process. It is expected that the factors affecting the construction cost and improvement measures of the PC method derived from this study will serve as a direction for technology development to spread the application of the PC method for apartment houses in the future.

Comparison of Construction Cost Applied by RC and PC Construction Method for Apartment House and Establishment of OSC Economic Analysis Framework (공동주택 RC 및 PC공법 적용 공사비 비교 및 OSC의 포괄적 경제성 분석 프레임워크 구축)

  • Yun, Won-Gun;Bae, Byung-Yun;Kang, Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.30-42
    • /
    • 2022
  • OSC is a type of supply chain and value chain that spans the entire process of construction production (planning, design, construction, maintenance, etc.). It is a method of producing the final object by manufacturing it in a factory, transporting it to the site, installing and construction. This research as is the construction cost was compared for each case A, which applied the PC method, and case B, which applied the RC method. In the case of applying the PC method (excluding the PC design cost), compared to the case where only the RC method was applied, the frame construction cost per unit quantity (m3) increased by about 70% (50% based on the total RC construction type). Of the total frame construction cost of PC method application, PC accounted for 90.2%, 'PC manufacturing cost' 54.8%, 'PC assembly cost' 28.5%, and 'transportation cost' accounted for 6.89%. Also a decision-making framework that can consider both costs and benefits was established. In the case of benefits, the construction period, defect repair, disaster occurrence, energy efficiency, noise/dust/waste, and greenhouse gas emission indicators reflecting OSC technical advantages were presented. It can contribute to providing a basis for helping decision-making on the introduction of PC apartment houses using OSC.

Benefit·Cost Analysis of Combine Method Using Hollow Precast Concrete Column (중공 PC기둥 복합공법의 편익-비용 분석)

  • Kim, Jae-Yeob;Park, Byeong-Hun;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.5
    • /
    • pp.429-436
    • /
    • 2016
  • Because of the shortage of construction workers due to The rising labor costs and an aging labor force, construction time has been extended. As a solution, The construction time of high-rise buildings can be reduced by adopting precast concrete construction methods. Most relevant studies have focused on the development and structural analysis of such methods and not on their construction management. Therefore, this study focused on the construction management of the hollow precast concrete column (HPC) method. The objective of this study was to evaluate the performance of HPC formulations through the analytic hierarchy process and benefit-cost analysis. After a gap analysis of the available literature and expert interviews, the evaluation criteria were selected. A questionnaire survey was administered to professionals with ample experience in precast concrete construction for the pair-wise evaluation of the benefit and costs of the HPC method. The results show that the benefits of the HPC method outweighed its costs. Therefore, the HPC method is a suitable substitute for the half-slab method.

Modeling of Precast Concrete Shear Walls BIM Program (BIM 프로그램을 이용한 프리캐스트 콘크리트 전단벽의 모델링)

  • Mun, Ju-Hyun;Yoon, Hyun-Sub;Kim, Jong-Won;Eom, Byung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.451-462
    • /
    • 2022
  • The objective of the study is to establish a BIM modeling of precast concrete(PC) shear wall with various wall-to-base connections. The family library of PC shear wall was established in BIM program using component function in a IFC(Industry foundation classes) file format and SketchUp program. From the BIM program, the amounts of concrete, reinforcing bars and steel materials as well as the interference of arranged reinforcing bars can be accurately evaluated in the PC shear walls with spliced sleeves, bolt, or welding plate connection methods. Although the additional metallic materials such as steel plates, bolts, and nuts were used in the PC shear walls with welding plate connection method, their amounts of materials, economic efficiency, and environmental impact were similar to those with spliced sleeve connection. Consequently, the bolt or welding connection is a highly applicable method as wall-to-base connection of PC shear walls, and it was a more useful method than spliced sleeve method, particularly considering the constructability.

A study on the Composition of the Production Rates System to Prepare Standards for Calculating the Construction Cost of PC Structure Apartments Based on Off-Site Construction (OSC) (OSC 기반 PC구조 공동주택 공사비 산정기준 마련을 위한 품셈 체계 구성에 관한 연구)

  • Lee, Hansoo;Lee, Chiho;Lee, Jeongwook;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.96-106
    • /
    • 2021
  • The PC structure based on the OSC (Off-Site Construction) is mentioned as a representative method of innovation in the construction industry that converts the existing construction environment from site-centered to factory production-transportation-site assembly. However, recent research on PC method has focused on improving the functions of subsidiary materials and improving the production system to increase productivity and institutional / policy R&D that can be universally applied to the life-cycle stage of ordering / design /construction is insufficient. In particular, the absence of standardized cost calculation standards makes it difficult to calculate and verify of objectified appropriate construction cost. So which is an obstacle to the activation of the PC method. In this study, the standards for construction costs of domestic and foreign PC method were surveyed and similar Construction Standard Production Rates were analyzed to confirm the product structure suitable for PC method. Subsequently, the construction procedures and input resources for each PC subsidiary materials were identified through on-site surveys to derive component for subsidiary materials, and the factors of change in the product according to the construction characteristics(height, weight of subsidiary material) were verified. As a result the standard product calculation system suitable for the site installation of the PC method for apartment was presented.

Cost Analysis of Composite Method Using Hollow-PC Column (중공 PC기둥을 적용한 복합공법의 공사비 분석)

  • Park, Byeong-Hun;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.71-72
    • /
    • 2016
  • Most of studies on PC method aim at the structural analysis and development of PC members, and studies on the construction management aspect are insufficient. Therefore, this study tries to investigate 'hallow PC column composite method(HPC composite method)' from the viewpoint of construction management and analyze the construction cost of the composite method. On the assumption that each comparative method was applied to the zone, the difference in construction cost between the two methods was analyzed. As a result, HPC composite method increased the initial investment cost because of its factor technology, but reduced transport cost, lifting cost, and installation cost through lightweight columns. This study analyzed only the difference in construction cost of HPC composite method so that it has the limitation in evaluating its economy. Therefore, to evaluate the economy of HPC composite method, it is considered to research more the construction cost of HPC composite method.

  • PDF

Development of Selection Criteria for Composite Method Using Half-PC Slab (하프슬래브를 이용한 PC 복합공법의 선정기준 개발)

  • Park, Byeong-Hun;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.103-104
    • /
    • 2016
  • Most of studies on PC method aim at the structural analysis and development of PC members, and studies on the construction management aspect are insufficient. This study is a basic research in the construction management aspect regarding 'composite method using hollow-PC column' (HPC method), and is intended to develop assessment standards for the benefit·cost analysis of HPC method. Assessment standards for the benefit·cost analysis were composed of main-factors and sub-factors through interview with 4 experts. It was possible to classify main-factors into 4 major categories, i.e,. structural performance, construction performance, construction duration and construction cost. Sub-factors were composed of factors which were of high importance in assessing the two methods. And factors judged to be repeated or of little importance were excluded.