• 제목/요약/키워드: P.D.M (Product Data Management)

검색결과 6건 처리시간 0.024초

고속 틸팅 차량설계를 위한 전산통합 환경 구축 연구 (Product Data Management for The system Engineering of Train Tilting express)

  • 한성호;송용수
    • 시스템엔지니어링워크숍
    • /
    • 통권4호
    • /
    • pp.65-69
    • /
    • 2004
  • Abstract Tilting train has been developed to increase the oprational speed of the trains on conventional lines which have many curves. This train are tilted at curves to compensate for unbalanced carbody centrifugal acceleration to a greater extent than compensation produced by the track cant, so that passengers do not feel centrifugal acceleration and thus trains can run at higher speed at curves. This paper developed PDM(product data management) to make a system engineering of TTX(Tilting Train eXpress) with maximum operation speed 180 km/h.

  • PDF

제품정보관리를 위한 통합적 멀티BOM시스템 (An Integrated Multi-BOM System for Product Data Management)

  • 정소영;김보현;오요셉;백재용;최헌종;이성진
    • 한국CDE학회논문집
    • /
    • 제17권3호
    • /
    • pp.216-223
    • /
    • 2012
  • Bill of material (BOM), which structurally represents the relation among parts constructing a product, is usually created when enterprises start to develop a new product. And it is shown as various types of BOM according to business needs and usage such as eBOM (engineering BOM), gBOM (green BOM), mBOM (manufacturing BOM), pBOM (process BOM), etc. eBOM, generally called BOM and created in the design stage of the new product, includes the drawing information of parts in the view of product function. eBOM is extended to gBOM adding the material information of parts to cope with international regulations for environment. eBOM is transformed to mBOM, which includes manufacturing sequence of parts and adds some parts required to fabricate parts and to assemble the product. mBOM is also extended to pBOM adding the process information of each part and additional assembly processes. This study introduces the concept of multi-BOM covering eBOM, gBOM, mBOM and pBOM, and proposes an advanced way to manage product data using multi-BOM system. The multi-BOM system proposed is to manage their relations using transformation function of BOM and master information of all BOMs.

틸팅 차량 설계를 위한 부품관리 체계 구축 연구 (Research for Bill of Material of Train Tilting express development)

  • 송용수;한성호;정유진
    • 시스템엔지니어링워크숍
    • /
    • 통권4호
    • /
    • pp.159-162
    • /
    • 2004
  • In order to care about preserving the environment for future generations, each country has been required to make the laws of the environment. So manufacturers must design, manufacture and sell goods that meet customer's need and must do this while meeting the needs of the environment. In this research we have developed product structure and configuration management system that treats electronic catalogs for recycling of train parts. This research focused on two system. One is JAVA-based electronic catalog that give the information about recycling of train parts. The other is product structure and configuration management system based on electronic catalog and Bill of Materials(B.O.M)

  • PDF

틸팅 차량 설계를 위한 부품관리 체계 구축 연구 (Research for Bill of Material of Train Tilting eXpress development)

  • 송용수;한성호;정유진
    • 시스템엔지니어링학술지
    • /
    • 제1권1호
    • /
    • pp.26-31
    • /
    • 2005
  • In order to care about preserving the environment for future generations, each country has been required to make the laws of the environment. So manufacturers must design, manufacture and sell goods that meet customer's need and must do this while meeting the needs of the environment. In this research we have developed product structure and configuration management system that treats electronic catalogs for recycling of train parts. This research focused on two system. One is JAVA-based electronic catalog that give the information about recycling of train parts. The other is product structure and configuration management system based on electronic catalog and Bill of Materials(B.O.M).

  • PDF

틸팅 차량 설계를 위한 Virtual System 구축 연구 (Virtual System for Manufacture of Train Tilting eXpress using Project Data Management)

  • 송용수;한성호;서승일
    • 시스템엔지니어링학술지
    • /
    • 제1권2호
    • /
    • pp.19-25
    • /
    • 2005
  • Tilting train has been developed to increase the operational speed of the trains on conventional lines which have many curves. The train are tilted at curves to compensate for unbalanced carbody centrifugal acceleration to a greater extent than compensation produced by the track cant, so that passengers do not feel centrifugal acceleration and thus trains can run at higher speed at curves. This paper developed PDM(product data management) to make a system engineering of TTX(Tilting Train eXpress) with maximum operation speed of 180 km/h.

  • PDF

원자력 발전소 제품 데이터의 공유를 위한 중립 모델 기반의 데이터 웨어하우스의 구축 (A Standard Way of Constructing a Data Warehouse based on a Neutral Model for Sharing Product Dat of Nuclear Power Plants)

  • 문두환;천상욱;최영준;한순흥
    • 한국CDE학회논문집
    • /
    • 제12권1호
    • /
    • pp.74-85
    • /
    • 2007
  • During the lifecycle of a nuclear power plant many organizations are involved in KOREA. Korea Plant Engineering Co. (KOPEC) participates in the design stage, Korea Hydraulic and Nuclear Power (KHNP) operates and manages all nuclear power plants in KOREA, Dusan Heavy Industries manufactures the main equipment, and a construction company constructs the plant. Even though each organization has a digital data management system inside and obtains a certain level of automation, data sharing among organizations is poor. KHNP gets drawing and technical specifications from KOPEC in the form of paper. It results in manual re-work of definition and there are potential errors in the process. A data warehouse based on a neutral model has been constructed in order to make an information bridge between design and O&M phases. GPM(generic product model), a data model from Hitachi, Japan is addressed and extended in this study. GPM has a similar architecture with ISO 15926 "life cycle data for process plant". The extension is oriented to nuclear power plants. This paper introduces some of implementation results: 1) 2D piping and instrument diagram (P&ID) and 3D CAD model exchanges and their visualization; 2) Interface between GPM-based data warehouse and KHNP ERP system.