• Title/Summary/Keyword: Owner/Client

Search Result 26, Processing Time 0.027 seconds

Enabling Dynamic Multi-Client and Boolean Query in Searchable Symmetric Encryption Scheme for Cloud Storage System

  • Xu, Wanshan;Zhang, Jianbiao;Yuan, Yilin
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.16 no.4
    • /
    • pp.1286-1306
    • /
    • 2022
  • Searchable symmetric encryption (SSE) provides a safe and effective solution for retrieving encrypted data on cloud servers. However, the existing SSE schemes mainly focus on single keyword search in single client, which is inefficient for multiple keywords and cannot meet the needs for multiple clients. Considering the above drawbacks, we propose a scheme enabling dynamic multi-client and Boolean query in searchable symmetric encryption for cloud storage system (DMC-SSE). DMC-SSE realizes the fine-grained access control of multi-client in SSE by attribute-based encryption (ABE) and novel access control list (ACL), and supports Boolean query of multiple keywords. In addition, DMC-SSE realizes the full dynamic update of client and file. Compared with the existing multi-client schemes, our scheme has the following advantages: 1) Dynamic. DMC-SSE not only supports the dynamic addition or deletion of multiple clients, but also realizes the dynamic update of files. 2) Non-interactivity. After being authorized, the client can query keywords without the help of the data owner and the data owner can dynamically update client's permissions without requiring the client to stay online. At last, the security analysis and experiments results demonstrate that our scheme is safe and efficient.

THE FEATURE CONSIDERATION AND PLAN FOR DEFINITION SYSTEMATIZATION OF CLIENT'S REQUIREMENT

  • Su-Kyung Cho;Chang-Hyun Shin;Jea-Sauk Lee;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.635-641
    • /
    • 2007
  • The construction starts its business by receiving the order from client and owner. The client presents requirements and related information so that the desired result can come out while the designer and the builder express and implement the building according to set objectives and goals of project based on information on project environment and presented requirements. Because the construction project makes decisions on such objectives at its early stage and previous stage becomes the situation for decision making of next stage as the computation to implement decisions get performed. Accordingly, this study has mentioned necessity of requirement analysis and systematization of construction project, analyzed the work of construction's early stage and resented a plan for objective of construction project requirement definition model in which requirements engineering has been applied and using it while making decisions on designing.

  • PDF

BIM based Construction Project Case Analysis for Facility Life Cycle Management from the Perspective of the Client (발주처 관점의 시설물 생애주기 관리를 위한 BIM 기반 건설 프로젝트 사례 분석)

  • Ham, Nam-Hyuk;Kim, Woong-Gi;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.10 no.3
    • /
    • pp.12-21
    • /
    • 2020
  • From the perspective of the client, the value of information for use in facility management is very low at the point of use. This is because the facility owner, who is a non-professional, cannot accurately request necessary information from the perspective of long-term facility life cycle management. The purpose of this study is to define the information necessary for facility management and to analyze the project operation method to procur this information to the client using BIM. To this end, this study analyzed the role of client and contractor, project delivery process, standards, and submissions in the BIM-based procurement area through USACE Air Force Hospital project case analysis. As a result of the analysis, if the client, who is the subject of facility operation, defines in advance the type and input method of necessary information in the operation stage, the client can receive the BIM optimized for operation from the contractor. The results of this study can be used to establish standards for receiving information necessary for establishment of procurement process and facility management of public institutions considering BIM introduction.

Application of BIM Elements for Owner's Decision - Making Support (발주자 참여 확대를 위한 BIM 적용요소에 관한 연구)

  • Lee, Kyung-Ha;Park, Jae-Hyun;Cho, Sung;Cho, Yong;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.185-188
    • /
    • 2009
  • Recently clients requirements and social requirements are complex and large sized in construction projects. Futhermore, processes and steps are more complexed than before. Unsuitable reflection of clients brings mistaken opinions. A phase of middle change makes delay and change. It brings problems of waste expense and time. 80, first stage of planning and schematic design processes have to reflect of clients opinion actively. by increasing of constructions project competitiveness. Recently, BIM(Building Information Modeling is being researched frequently. Through visualization of information proceed step by step and it helps cognition of adapting information. 80, this paper finds and suggests solution of reflecting clients opinion and requirements and non professional clients and positively support of client participation watching based on BIM.

  • PDF

Multi-Criteria Decision-Making Model Using Quality Function Deployment (QFD) Method for the Most Suitable Temporary Earth Retaining System

  • Jung, Bae Yu;Byung, Cho Han;Jin, Han Sang;Won, Kwon;Ho, Jo Jae;Youl, Chun Jae
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.620-621
    • /
    • 2015
  • In this study, the multi-criteria decision-making model based on Quality Function Deployment Method is proposed. Multicriteria decision-making is an attempt to link QFD method with the TOPSIS. By this effort, a model that makes client's decision-making more rational and objective in design phase is suggested. The multi-criteria decisionmaking model confirming to the Owner's requirements will improve the productivity of the construction industry and the satisfaction of the customer. Further study extending the range of the requirements, not only the Owner's requirement will be necessary to cover the various factors as much as possible. And then, finally as a flexible platform to achieve a sustainable quality management, web-based multi-criteria decision-making model can be utilized by the relevant stakeholders simultaneously with the feed-back and sharing the necessary informations.

  • PDF

An Innovative Public Project Process Management For the Government Owner (발주자 입장에서 바라본 혁신적인 관급공사 관리 프로세스 제시를 위한 기초 연구)

  • Kim, Sung-Won;Kim, Dea-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.557-562
    • /
    • 2008
  • In Korean construction industry, a public sector's ordering volume has been constantly increased after 2000. But, because a cost, schedule and quality control generally depends on a result-centric management form and a transparent management is not done during the construction in the Korean public business, it is recognized that this causes problems including an increase of cost and schedule, incomplete construction, a difficulty to find the problem in advance to establish measures, and an unclear locus of responsibility of constructor, supervisor and designer. Accordingly, this study is intended to derive the problems and the limit of management by identifying and analyzing the management state of the present government construction client for the client organization of public sector's government construction. Also, the study is intended to contribute to the client's efficient and actual project management by presenting the model of supplementing or improving the derived problem and limits to the client's organization.

  • PDF

A Study on the Secure Storage Device for Protecting Cryptographic Keys in Untrusted DRM Client Systems (신뢰할 수 없는 DRM 클라이언트 시스템 하에서 키 보호를 위한 Secure Storage Device의 연구)

  • 이기정;권태경;황성운;윤기송
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.14 no.2
    • /
    • pp.3-13
    • /
    • 2004
  • DRM is the ability to brand digital contents with features that ensure copy Protection and affect the way in which digital contents are played back. DRM is a technology that enables the secure distribution, promotion and sale of digital contents on the Internet. The DRM Client System that operates on the untrusted user environments has to meet the requirements of the contents owner, including copyright and contents protection. After the DRM Client System is installed on the untrusted user environments, it verifies and plays digital contents. With these procedures it cuties out user authentication, contents decryption, and license management. During these procedures, the sensitive data, including authentication information, decryption data and license data, must be secured against any illegal access from users. The goal of this thesis is to introduce the implementation of Secure Storage Device which can protect user's authentication key, cryptographic key, and license data in safe where the DRM Client System is running.

Framework of Owner-driven Lean Construction for Plant Construction (발주자 주도형 린 건설에 대한 기초 연구;플랜트 건설공사를 중심으로)

  • Ryu, Chung-Kyu;Han, Seung-Heon;Park, Jung-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.647-651
    • /
    • 2007
  • The Lean Construction is adopted from Lean Principle of Manufacturing Industry in the early of 1990, that has been providing theoretical background and good practical implementation for maximizing customers' satisfaction and improving productivity through minimizing the waste factors in the construction operations. The Last Planner System(LPS), one of the elementary techniques of Lean Construction, aims for improving the work reliability and reducing variability by measuring and managing the daily or weekly performance for overcoming the weakness of recent complex schedule management tools such as Critical Path Method. This research is propose a framework for implementation of LPS conducted by owner in plant construction.

  • PDF

Facilitating creative problem solving process as a teaching tool in fashion marketing classrooms

  • Oh, Keunyoung
    • The Research Journal of the Costume Culture
    • /
    • v.27 no.1
    • /
    • pp.72-80
    • /
    • 2019
  • A teaching manual was developed to incorporate the creative problem solving process into a fashion marking course. Students' creativity, problem solving, critical thinking, and analytical thinking are promoted by applying the creative problem solving process systematically to solve authentic business problems experienced by local apparel business owners. This teaching manual is based on the FourSight Model that consists of Clarify, Ideate, Develop, and Implement. Various tools promoting divergent thinking are also utilized in the process. A local fashion business is invited as a problem owner and four resource groups are formed with students based on the results of the Kirton Adaption Innovation Inventory. Each resource group consists of 6-8 students. The creative problem solving process is implemented into a classroom setting as four 75-minutes sessions that are held twice a week for two consecutive weeks. The local fashion business owner will be in presence during the first (Clarify) and last (Implement) sessions. The instructor facilitator meets with the problem owner outside the classroom three times including pre-session client interview, after the second (Ideate) session, and before the third (Develop) session. This modified CPS manual for fashion marketing and merchandising courses provides practical guidelines to work with local fashion businesses while providing students with learning opportunities of the creative problem solving process.

A Study on Method Activation of Construction Management through Investigation of Public Owners' Capability level (공공부문의 발주자 역량 수준 조사를 통한 건설사업관리 활성화 방안 연구)

  • Kim, Sun-Sik;Kim, Ju-Hyun;Lee, Yun-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.289-294
    • /
    • 2007
  • It has been 10 years Since December 1996 when CM method was institutionalized by Construction Industry Fundamental law. Even though construction market has been in stagnant of business activities till now, CM in Korea started to be activated by the introduction of CM method i.n public construction. In the end of 2005, the number of CM order's contract is 6.7 times , an amount of CM order's money is 9.2 times more than operation plan of CM system announced in 2001. Therefore, CM market has been dramatically growing. However, it is judged that the shortage of faith in CM project and necessity of CM method are not recognized and study on a owner who affects successful settlement of CM has not been performed. When considering those points, in introduction and practical use of CM, CM is suggested to the field which is necessary for a client through the task performance level research and analysis of a owner who act a important role to activate Construction Management. As result of studying pre-existing papers to i.nvestigate of owner's capability level, the task function of a client is classified into 10 types and a public opinion poll was performed based on the 10 types of function.

  • PDF