• Title/Summary/Keyword: Over Load

Search Result 2,150, Processing Time 0.029 seconds

Evaluation of Train Running Safety During Construction of Temporary Bridge on Existing Railway (기존선에서 가설교량 시공에 따른 열차의 주행안전성 평가)

  • Eum, Ki-Young;Bae, Jae-Hyoung;Choi, Chan-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.3
    • /
    • pp.234-239
    • /
    • 2011
  • Installing the temporary bridge after excavating the railway requires installing movable cross beam, but as it doesn't requires isolating the catenary or cutting the rail, it's applicable to double-track with frequent operation. In this study, a displacement meter was placed on temporary bridge to monitor the displacement pattern in curve section (R400) completed using temporary bridge method, and wheel load, lateral pressure and derailment coefficient were measured to evaluate the load imposed on track and the stability in curve section (R400) for quantitative evaluation of training running safety. As a result of the measurement, when trains passing over a temporary bridge, the maximum value of Wheel load and Lateral Force is analyzed as the 51% and 81% of standard level according to foreign country's performance tests, There is no trouble with stability analysis in Wheel load and Lateral Force occurring. Additionally, Wheel load and Lateral Force considered as the safety standard are tested 49% of limiting value regardless of trains, which the norm value quite well, there is no problem with train running.

Development and Application of Coliform Load Duration Curve for the Geumho River (금호강 유역의 대장균 부하지속곡선 개발 및 적용)

  • Jung, Kang-Young;Im, Tae-Hyo;Kim, Gyeong-Hoon;Lee, In-Jung;Yoon, Jong-Su;Heo, Seong-Nam
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.6
    • /
    • pp.890-895
    • /
    • 2012
  • Duration curves describe the percentage of time that a certain water quality (total/fecal coliform (=TC/FC)) or discharge is exceeded. The curves methodology are usually based on daily records and are useful in estimating how many days per year and event will be exceeded. The technique was further applied to estimated TC/FC loading to the Geumho River, using the daily mean flow rate and TC/FC concentration data during January, 2001 and December, 2011 for the Geumhogang6 (=Seongseo water level station) where an automated monitoring station is located in Gangchang-bridge. Low flow of the Seongseo (=11.1 cms) was equivalent to 75.3% on an exceedance probability scale. Load Duration curve for TC/FC loading at the Seongseo was constructed. Standard load duration curve was constructed with the water quality criteria for class III (TC/FC concentration = 5000/1000 CFU/ 100 mL). By plotting TC/FC observed load duration curve with standard load duration curve, it could be revealed that water quality do not meet the desired water quality for 68.8/11.2% on an exceedance probability scale. IF linear correlation between flow rate and coliform concentration is assumed, it can be interpreted that water quality exceed desired criteria when daily average flow rate is over 11.9/109.9 cms.

Load Distribution Factors for Determinating Shear Force in Steel Box Girder Bridges (강상자형교의 전단력 산정을 위한 하중분배계수)

  • Song, Jea Ho;Kim, Min Wook;Kim, Il Su;Oh, Jin Woo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.2
    • /
    • pp.88-97
    • /
    • 2011
  • For Korean design provisions are not equipped for skewed steel box girder bridges, when American provisions are adopted, load distribution factors different from real behavior are determinated. Furthermore the possibility of over or under estimated bridge design involves. The aim of this study is to provide more rational load distribution factor formulas based on real behavior for shear at obtuse corner of skewed steel box girder bridges. In order to accomplish the aim finite element analysis for a variety of skewed steel box girder bridge structural models is carried out, and each parameters degree of influence on wheel load distribution factors of skewed steel box girder bridges are analyzed. Then multiple regression analysis is fulfilled in order to propose formulas for determinating shear force load distribution factor of skewed steel box girder bridges.

Measurement of Retaining Tensile Load with the Relative Displacement Detector of Ground Anchors (상대변위측정기를 이용한 지반앵커의 보유인장력 측정)

  • Jeong, Hyeon-Sik;Han, Kwang-Suk;Lee, Yeong-Saeng
    • Journal of the Korean Geotechnical Society
    • /
    • v.33 no.10
    • /
    • pp.59-69
    • /
    • 2017
  • The tension load of the ground anchor inserted in the ground gradually changes over time. In this regard the change of the initial tension load is primarily decreased by the fixation condition of the fixing head and the mechanical characteristics of the tensile material. The subsequent additional tension load is a time-dependent loss mostly due to the fixing conditions of the bonded length and the surrounding ground properties of the field. In this paper, therefore, a measurement system using a relative displacement detector that can relatively easily measure the change of tension load is discussed. As a result of the review, it was confirmed that the results using the relative displacement detector are similar to those of the real scale model test, and it was also confirmed that similar results were obtained with the result of the pull-out test conducted on the ground anchors fixed to weathered rocks condition. In addition, a pull-out test was conducted on the test anchors whose initial tension load loss was relatively large and through this test pull-out behavior of the tension type ground anchors was verified.

Case Studies for Anlayzing Effects of Outriggers on Gravity Load Managements (아웃리거의 중력하중 조절 효과 분석을 위한 사례연구)

  • Kang, Su-Min;Eom, Tae-Sung;Kim, Jae-Yo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.23 no.3
    • /
    • pp.255-266
    • /
    • 2010
  • In high-rise buildings, an outrigger system is frequently used as a resisting system for lateral loads. Since the outriggers tie exterior columns and an interior core, exterior columns can participate in the lateral load resisting system and the structural resistance capacity can be increased. However, the outriggers contribute for controlling gravity loads as well as lateral loads. The flows of gravity loads can be changed by the members of outriggers, for the purposes of transferring loads to mega-columns, distributing gravity loads equally among vertical members of columns, walls, or piles, minimizing differential settlements in a foundation system, and so on. In this study, by computational structural analyses of high-rise buildings over 100 floors, the effects of outriggers on controlling gravity loads are analyzed. Analyses for 3-dimensional models with or without outrigger members are performed, and then the gravity load distributions in columns and piles and foundation settlements are analyzed. Also, the effects of outriggers on gravity load controls during construction stages as well as after construction are included.

Non-linear time-dependent post-elastic analysis of suspended cable considering creep effect

  • Kmet, S.;Tomko, M.;Brda, J.
    • Structural Engineering and Mechanics
    • /
    • v.22 no.2
    • /
    • pp.197-222
    • /
    • 2006
  • In this paper, the non-linear time-dependent closed-form, discrete and combined solutions for the post-elastic response of a geometrically and physically non-linear suspended cable to a uniformly distributed load considering the creep effects, are presented. The time-dependent closed-form method for the particularly straightforward determination of a vertical uniformly distributed load applied over the entire span of a cable and the accompanying deflection at time t corresponding to the elastic limit and/or to the elastic region, post-elastic and failure range of a suspended cable is described. The actual stress-strain properties of steel cables as well as creep of cables and their rheological characteristics are considered. In this solution, applying the Irvine's theory, the direct use of experimental data, such as the actual stress-strain and strain-time properties of high-strength steel cables, is implemented. The results obtained by the closed-form solution, i.e., a load corresponding to the elastic limit, post-elastic and failure range at time t, enable the direct use in the discrete non-linear time-dependent post-elastic analysis of a suspended cable. This initial value of load is necessary for the non-linear time-dependent elastic and post-elastic discrete analysis, concerning incremental and iterative solution strategies with tangent modulus concept. At each time step, the suspended cable is analyzed under the applied load and imposed deformations originated due to creep. This combined time-dependent approach, based on the closed-form solution and on the FEM, allows a prediction of the required load that occurs in the post-elastic region. The application of the described methods and derived equations is illustrated by numerical examples.

Load-transfer mechanism in the ground with discontinuity planes during tunnel excavation (불연속면이 존재하는 지반에서 터널굴착에 의한 하중전이)

  • Lee, Sang-Duk;Byun, Gwang-Wook;Yoo, Kun-Sun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.1
    • /
    • pp.71-78
    • /
    • 2002
  • In this study, the influence of the presence of discontinuity planes on the load transfer mechanism and the pattern of loosening zone was studied based on the laboratory test. The trap-door and the reaction plates are installed as the bottom plane of the model box. The vertical discontinuity plane is installed in the dry sand. Various overburden heights and locations of discontinuity planes are applied as major factors in this study. The results show that at higher overburden heights over about 1.5 times the excavation width, the ratio of the transferred stress to the insitu stress converges to a certain value even if the overburden height increases further. The results also show that the discontinuity plane gives relatively larger influence on the load transfer mechanism, that produces the unsymmetrical load concentration, when the discontinuity plane locates within the tunnel width. When the discontinuity plane locates outside the tunnel width, the unsymmetrical load concentration is reduced considerably.

  • PDF

A study on the impact load acting on an FPSO bow by steep waves

  • Hong, Sam-Kwon;Lew, Jae-Moon;Jung, Dong-Woo;Kim, Hee-Taek;Lee, Dong-Yeon;Seo, Jong-Soo
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.9 no.1
    • /
    • pp.1-10
    • /
    • 2017
  • Various offshore structures such as FPSO, FSO, Semi-submersible, TLP and Spar are operated to develop offshore oil and gas fields. Most of the offshore structures shall be operated over 20 years under the harsh environments at sites so that the offshore structures should be designed to endure the harsh environments. In this study, the effect of the impact load (so called slapping load) by the steep waves acting on the FPSO bow is investigated through the model test. For measurement of the impact pressures on the frontal area, a bow-shaped panel was fabricated, and installed the pressure sensors on the bow starboard side of the model FPSO. During the model test campaign, the impact load was investigated using the steep waves with $Hs/{\lambda}$ greater than 1/16 of the representative wave condition. Consequently, it is confirmed through the model test that the impact loads acting on the FPSO bow are significantly increased with the steep waves ($Hs/{\lambda}$ > 1/16) than the representative wave conditions of a maximum significant wave height and a pitch forcing period. Therefore, for safe design of North Sea FPSO, it is necessary to consider the steep waves in addition to the representative wave conditions and to be applied as proper structural load. Also, the effect of random seeds in irregular waves should be considered to build the safe FPSO.

Reliability Analysis of Single and Continuous Span Composite Plate and Box Girder Designed by LRFD Method under Flexure (LRFD법으로 설계된 단경간 및 연속경간 강합성 플레이트 거더 및 박스 거더의 휨에 대한 신뢰도해석)

  • Shin, Dong Ku;Roh, Joon Sik;Cho, Eun Young
    • Journal of Korean Society of Steel Construction
    • /
    • v.20 no.1
    • /
    • pp.183-193
    • /
    • 2008
  • The reliability analysis of simply-supported and continuous composite plate girder and box girder bridges under flexure was performed to provide a basic data for the development of LRFD c ode. The bridges were designed based on LRFD specification with newly proposed design live load which was developed by analyzing traffic statistics from highways and local roads. A performance function for flexural failure was expressed as a function of the flexural resistance of composite section and the design moments due to permanent load and live load. For the flexural resistance, the statistical parameters obtained by analyzing over 16,000 domestic structural steel samples were used. Several different values of bias factors for the live load moment from 1.0 to 1.2 were used. Due to the lack of available domestic measured data on the moment by permanent loads, the same statistical properties used in the calibration of ASHTO-LRFD were ap plied. The reliability indices for the composite girder bridges with various span lengths, different live load factors, and bias fact or for the live load were obtained by applying the Rackwitz-Fiessler technique.

Centrifuge modelling of rock-socketed drilled shafts under uplift load

  • Park, Sunji;Kim, Jae-Hyun;Kim, Seok-Jung;Park, Jae-Hyun;Kwak, Ki-Seok;Kim, Dong-Soo
    • Geomechanics and Engineering
    • /
    • v.24 no.5
    • /
    • pp.431-441
    • /
    • 2021
  • Rock-socketed drilled shafts are widely used to transfer the heavy loads from the superstructure especially in mountainous area. Extensive research has been done on the behavior of rock-socketed drilled shafts under compressive load. However, little attention has been paid to uplift behavior of drilled shaft in rock, which govern the overall behavior of the foundation system. In this paper, a series of centrifuge tests have been performed to investigate the uplift response of rock-socketed drilled shafts. The pull-out tests of drilled shafts installed in layered rocks having various strengths were conducted. The load-displacement response, axial load distributions in the shaft and the unit skin friction distribution under pull-out loads were investigated. The effects of the strength of rock socket on the initial stiffness, ultimate capacity and mobilization of friction of the foundation, were also examined. The results indicated that characteristics of rock-socket has a significant influence on the uplift behavior of drilled shaft. Most of the applied uplift load were carried by socketed rock when the drilled shaft was installed in the sand over rock layer, whereas substantial load was carried by both upper and lower rock layers when the drilled shaft was completely socketed into layered rock. The pattern of mobilized shaft friction and point where the maximum unit shaft friction occurred were also found to be affected by the socket condition surrounding the drilled shaft.