• Title/Summary/Keyword: Outrigger System

Search Result 77, Processing Time 0.028 seconds

A Study on the Safety Improvement of Structural Weakness Using Accident Analysis for Vehicle-Mounted MEWP (차량탑재형 고소작업대의 재해분석을 통한 취약 구조부의 안전성 향상 방안에 관한 연구)

  • Yoo, Yong-tae;Seo, Su-eun;You, Hee-Jae;Kang, Kyung-sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.1
    • /
    • pp.15-25
    • /
    • 2017
  • The findings were summarized as follows. The safety check by manufacturer showed that 6 of 13 companies are over the average occurrence of defects. It was expected that there would be a difference between manufacturing technology capability and production system of each manufacturer. Consequently, manufacturers should institutionally improve and strengthen certification items for the upward standardization of safety certification before factory. Second, the safety check by year showed that the results of this study accord with those of previous studies on defect time. Consequently, manufacturers should classify the 3-year-old equipment for vehicle-mounted MEWP into a special check subject to do a nondestructive test according to proven results, and also reflect the test in a safety test system to do regular preventive activities of equipment defects. Third, the safety check by part showed that the boom and outrigger parts of vehicle-mounted MEWP have the most defects. Stress concentration resulted in defects as the boom part was most frequently operated in the structural parts for a real work. To prevent this, it is suitable to improve the hardness of boom materials. The outrigger part needs improvement in safety devices with materials. As an outrigger supports the overturning moment of equipment, it is most affected by its load based on the operating radius, resulting in fatigue crack.

Optimum position for outriggers of different materials in a high- rise building

  • Nikhil Y. Mithbhakare;Popat D. Kumbhar
    • Earthquakes and Structures
    • /
    • v.25 no.5
    • /
    • pp.359-367
    • /
    • 2023
  • High-rise structures are considered as symbols of economic power and leadership. Developing countries like India are also emerging as centers for new high-rise buildings (HRB). As the land is expensive and scarce everywhere, construction of tall buildings becomes the best solution to resolve the problem. But, as building's height increases, its stiffness reduces making it more susceptible to vibrations due to wind and earthquake forces. Several systems are available to control vibrations or deflections; however, outrigger systems are considered to be the most effective systems in improving lateral stiffness and overall stability of HRB. In this paper, a 42-storey RCC HRB is analyzed to determine the optimum position of outriggers of different materials. The linear static analysis of the building is performed with and without the provision of virtual outriggers of reinforced cement concrete (RCC) and pre-stressed concrete (PSC) at different storey levels by response spectrum method using finite element based Extended3D Analysis of building System (ETABS) software for determining responses viz. storey displacement, base shear and storey drift for individual models. The maximum allowable limit and percentage variations in earthquake responses are verified using the guidelines of Indian seismic codes. Results indicate that the outriggers contribute in significantly reducing the storey displacement and storey drift up to 28% and 20% respectively. Also, it is observed that the PSC outriggers are found to be more efficient over RCC outriggers. The optimum location of both types of outriggers is found to be at the mid height of building.

A Study on the Size of Buildings for Utilizing the Limit Slenderness Ratio Approximation Equation of Outrigger Structural System (아웃리거 구조시스템의 한계세장비 근사식 활용을 위한 건물규모에 대한 연구)

  • Yang, Jae-Kwang;Choi, Hyun-Sang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.11
    • /
    • pp.19-26
    • /
    • 2019
  • To construct buildings on limited land, the size of the building is important. The development process needs to be minimized because determining the size of a structurally safe building at the planning stage incurs considerable time and cost. This study proposes the Limit Slenderness Ratio Approximation Equation. This study examined an outrigger structure system among several systems proposed for controlling the lateral displacement in tall buildings. This study compared the Limit Slenderness Ratio Approximation Equation with the approximate equation by changing the variables of the building model, and examined the size of the building using the approximate Equation. As an analysis program, the MAIDAS architectural structural analysis program was used to conduct model-specific analysis. The appropriate scale of the building to minimize the error between the approximate value calculated by the Limit Slenderness Ratio Approximation Equation and the analysis result of the structural analysis program is as follows. As the number of outrigger installation increases, the error can be reduced; the ratio of the cores is reasonable, from 20% to 30%, and the arrangement of the column is suitable only for the outer column without an internal column.

Analysis of Effects of Stiffness Increment Factors for Deciding the Initial Structural System of Tall Buildings (초고층건물 초기 구조시스템 선정을 위한 강성증가요인 효과 분석)

  • Lee, Jae-Cheol;Jung, Jong-Hyun
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.857-862
    • /
    • 2007
  • The purpose of this research is to compare the stiffness increment effects with the floor plan shapes by the stiffness increment factors. For this, we generated the standard floor plans with Box and T type shapes. Then applied the stiffness increment factors -outrigger, material strength, member section- to those floor plans, and generated several alternative analysis models that make the effects of the factors to the lateral displacement exposed. Finally, we analyzed the stiffness increment effects and compared with each other by the stiffness increment factors. As a result, we found that the increment effects have not influence to floor plan shapes, and orders of stiffness increment effects are outrigger, core wall and material strength. We expect that the results of this study could be effectively utilized in the schematic structural design of tall buildings.

  • PDF

Comparative Evaluation of Structural Systems for Tilted Tall Buildings

  • Moon, Kyoung Sun
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.2
    • /
    • pp.89-98
    • /
    • 2014
  • Employing tilted forms in tall buildings is a relatively new architectural phenomenon, as are the cases with the Gate of Europe Towers in Madrid and the Veer Towers in Las Vegas. This paper studies structural system design options for tilted tall buildings and their performances. Tilted tall buildings are designed with various structural systems, such as braced tubes, diagrids and outrigger systems, and their structural performances are studied. Structural design of today's tall buildings built with higher strength materials is generally governed by lateral stiffness. Tilted towers are deformed laterally not only by lateral loads but also by dead and live loads due to their eccentricity. The impact of tilting tall buildings on the gravity and lateral load resisting systems is studied. Comparative evaluation of structural systems for tilted tall buildings is presented.

State of Practice of Performance-Based Seismic Design in Indonesia

  • Sukamta, Davy;Alexander, Nick
    • International Journal of High-Rise Buildings
    • /
    • v.1 no.3
    • /
    • pp.211-220
    • /
    • 2012
  • The current 2002 Indonesian Seismic Code consists of prescriptive criteria that are intended to result in buildings capable of providing certain levels of performance. However, the actual performance capability of buildings is not assessed as part of the code procedures. Several analysis procedures are allowed, and the state of practice is to use the RSA with six-zone seismic map developed for 475-year earthquake. This code is being revised and will adopt many of the ASCE7-10 provisions and 2475-year earthquake for MCE. The growth of tall buildings compels engineers to look for more optimal lateral system. The use of RC core wall as single system has been adopted by very few engineering firms, which is allowed in the current code but will no longer be the case if the new one is in effect. Other innovative structural system such as core wall and outrigger is not addressed in the proposed new code. Engineers must then resort to NLRHA. Currently, one 50-story building under construction using RC core wall and outrigger has been designed with RSA and employing capacity design principles, then evaluated using NLRHA per TBI Guidelines. Based on the evaluation, the performance of the 50-story building generally still meets the criteria of the TBI Guidelines. The result of the case study is presented in this paper.

Pull-out Capacity of Cast-in-place Anchor for Construction of Precast Concrete Segment Arch (프리캐스트 콘크리트 패널 분절 아치 시공을 위한 선설치 앵커의 인발 강도 평가)

  • Ahn, Jin-Hee;Yim, Hong Jae;Bang, Jin Soo;Jeon, Seok Hyeon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.24 no.2
    • /
    • pp.94-102
    • /
    • 2020
  • Precast concrete segment arch system has an economic and construct ability that combined with advantage of precast concrete and arch behavior. A precast concrete segment arch system with outrigger is consisted of segmented precast panels, a steel outrigger rib, and V-strip to connect precast panels with a steel outrigger rib and cast-in-place anchors in precast panels to connect V-strip should have sufficient pull-out capacity to form its arch shape by site lifting for assembled precast panels and outriggers. However, it is difficult to secure its embedment depth due to the relatively shallow thickness of precast panel. It can be also occurred that flexure deformation of precast panels caused by its pull-out behaviors. In this study, pull-out capacity of cast-in-place anchor was examined for construction of precast concrete segment arch system with outriggers. Therefore, a total of 24 precast panel specimens were fabricated to examine pull-out capacities of cast-in-place anchor in precast panels, and installation depth of anchors, diameter of anchors and wire mesh effects for the precast panel were examined. From this pull-out tests, its pull-out capacities and failure modes were evaluated and the type of the cast-in-place anchor applicable to the precast concrete segment panel arch system with outriggers was determined from comparison of the design specification values.

Challenges in Structural Design of Bumeo W-project

  • Kim, Jong Soo;Jo, Duck Won;Choi, Eun Gyu
    • International Journal of High-Rise Buildings
    • /
    • v.9 no.2
    • /
    • pp.167-173
    • /
    • 2020
  • W-Project is 60-story mixed-use residential building complex project in Daegu, the third biggest city in South Korea. There are lots explorable items to be solved to secure structural safety and meet the serviceability requirements. This paper describes what kind of structural system is optimized based on the architectural requirements and structural components design and the grade of concrete strength altered on floors. The defining process of lateral resisting system of outrigger compared to the core ratio of typical plan is illustrated in detail.

Corner Steel plate-Reinforced Core Wall System

  • Park, Hong-Gun;Kim, Hyeon-Jin;Park, Jin-Young
    • International Journal of High-Rise Buildings
    • /
    • v.8 no.3
    • /
    • pp.193-199
    • /
    • 2019
  • For better structural performance and constructability, a new composite core wall system using steel plate columns at the corners of the core section was developed. Using the proposed core wall, nonlinear section analysis and 3-dimensional structural analysis were performed for the prototype core wall section and super high-rise building, respectively. The analysis results showed that, when compared to traditional RC core wall case, the use of the corner steel plate columns provided better structural capacity, which allows less wall thickness and re-bars. Further, due to such effects, the construction cost and time can be reduced despite the use of steel plate columns.