• 제목/요약/키워드: Orifice Gate Type

검색결과 4건 처리시간 0.017초

반용융 성형공장에서 표면 및 내부 조직 제어에 관한 연구 (A Study on Conrol of Surfacial and Internal Microsructure in Thixoforming Process)

  • 이동건
    • 한국소성가공학회:학술대회논문집
    • /
    • 한국소성가공학회 1999년도 춘계학술대회논문집
    • /
    • pp.169-172
    • /
    • 1999
  • Thixoforming process has been accepted as a new method for fabricating near net shaped products with lighweight aluminum alloys. The thixoforming process consists of reheating process of billet, billet handing filling into the die cavity and solidification of thixoformed part,. in this paper the thixoforming experiments are performed with two different die temperature ({{{{ TAU _d}}}}=20$0^{\circ}C$ 30$0^{\circ}C$) and orifice gate type. The microstructures of SSM(357, A490 and ALTHIX 86S) fabricated in thixoforming process are evaluated in therms of globularization and grain size. effect of alloying elements onthe surface and internal defects is investigated. Finally the methods to obtain the thixoformed products with good mechanical propertis are proposed by solution for avoiding the surface and internal defects.

  • PDF

방류량 및 하류부유황을 고려한 팔당댐의 수문조작기준 선정 (Gate Operation Rule of Paldang Dam by Considering Discharge and Downstream Flow Pattern)

  • 서규우;이종설
    • 물과 미래
    • /
    • 제29권2호
    • /
    • pp.209-219
    • /
    • 1996
  • 1973년 팔당 수력발전소 준공 이래로 사용하여 온 수문조작기준은, 1985년 충주 다목적댐 건설에 따른 한강홍수예경보 프로그램 개선에 따라 일부 수정을 거쳐 사용하고 있다. 그 동안 한강 종합개발 사업의 하도정비사업결과로 팔당댐 하류지역의 수면저하가 가시적으로 발생하게 되었다. 이로 인해 댐 건설당시의 낙차에 변화가 생겼고 댐하류부의 수위가 평균 3m 정도 저하되어 잠수 오리피스식 여수로인 팔당댐의 방류량 산정식에 문제점이 발생하면서 수문개방방식별 방류량의 재산정이 불가피해졌다. 본 연구에서는, 이러한 문제점을 해결하고 수문조작기준을 결정하기 위하여 수리모형실험을 통해 세가지 수문조작 방식을 비교, 검토하였다. 댐우안에 위치한 발전소 설비 및 운영에 영향을 미치지 않는 안전범위를 최우선으로 하여 방류량별, 개도형태별로 하류부에서의 유황을 관찰하였으며, 또한 수치모형으로도 하류부유황을 모의하여 검토한 결과, 좌측 수문 5개씩을 순차적으로 개방하는 방식을 가장 적절한 수문조작기준으로 결정하였다.

  • PDF

취입모의 경제적 계획취입수심 산정방법에 대한 연구 (A Study on a Calculation Method of Economical Intake Water Depth in the Design of Head Works)

  • 김철기
    • 한국농공학회지
    • /
    • 제20권1호
    • /
    • pp.4592-4598
    • /
    • 1978
  • The purpose of this research is to find out mathemetically an economical intake water depth in the design of head works through the derivation of some formulas. For the performance of the purpose the following formulas were found out for the design intake water depth in each flow type of intake sluice, such as overflow type and orifice type. (1) The conditional equations of !he economical intake water depth in .case that weir body is placed on permeable soil layer ; (a) in the overflow type of intake sluice, {{{{ { zp}_{1 } { Lh}_{1 }+ { 1} over {2 } { Cp}_{3 }L(0.67 SQRT { q} -0.61) { ( { d}_{0 }+ { h}_{1 }+ { h}_{0 } )}^{- { 1} over {2 } }- { { { 3Q}_{1 } { p}_{5 } { h}_{1 } }^{- { 5} over {2 } } } over { { 2m}_{1 }(1-s) SQRT { 2gs} }+[ LEFT { b+ { 4C TIMES { 0.61}^{2 } } over {3(r-1) }+z( { d}_{0 }+ { h}_{0 } ) RIGHT } { p}_{1 }L+(1+ SQRT { 1+ { z}^{2 } } ) { p}_{2 }L+ { dcp}_{3 }L+ { nkp}_{5 }+( { 2z}_{0 }+m )(1-s) { L}_{d } { p}_{7 } ] =0}}}} (b) in the orifice type of intake sluice, {{{{ { zp}_{1 } { Lh}_{1 }+ { 1} over {2 } C { p}_{3 }L(0.67 SQRT { q} -0.61)}}}} {{{{ { ({d }_{0 }+ { h}_{1 }+ { h}_{0 } )}^{ - { 1} over {2 } }- { { 3Q}_{1 } { p}_{ 6} { { h}_{1 } }^{- { 5} over {2 } } } over { { 2m}_{ 2}m' SQRT { 2gs} }+[ LEFT { b+ { 4C TIMES { 0.61}^{2 } } over {3(r-1) }+z( { d}_{0 }+ { h}_{0 } ) RIGHT } { p}_{1 }L }}}} {{{{+(1+ SQRT { 1+ { z}^{2 } } ) { p}_{2 } L+dC { p}_{4 }L+(2 { z}_{0 }+m )(1-s) { L}_{d } { p}_{7 }]=0 }}}} where, z=outer slope of weir body (value of cotangent), h1=intake water depth (m), L=total length of weir (m), C=Bligh's creep ratio, q=flood discharge overflowing weir crest per unit length of weir (m3/sec/m), d0=average height to intake sill elevation in weir (m), h0=freeboard of weir (m), Q1=design irrigation requirements (m3/sec), m1=coefficient of head loss (0.9∼0.95) s=(h1-h2)/h1, h2=flow water depth outside intake sluice gate (m), b=width of weir crest (m), r=specific weight of weir materials, d=depth of cutting along seepage length under the weir (m), n=number of side contraction, k=coefficient of side contraction loss (0.02∼0.04), m2=coefficient of discharge (0.7∼0.9) m'=h0/h1, h0=open height of gate (m), p1 and p4=unit price of weir body and of excavation of weir site, respectively (won/㎥), p2 and p3=unit price of construction form and of revetment for protection of downstream riverbed, respectively (won/㎡), p5 and p6=average cost per unit width of intake sluice including cost of intake canal having the same one as width of the sluice in case of overflow type and orifice type respectively (won/m), zo : inner slope of section area in intake canal from its beginning point to its changing point to ordinary flow section, m: coefficient concerning the mean width of intak canal site,a : freeboard of intake canal. (2) The conditional equations of the economical intake water depth in case that weir body is built on the foundation of rock bed ; (a) in the overflow type of intake sluice, {{{{ { zp}_{1 } { Lh}_{1 }- { { { 3Q}_{1 } { p}_{5 } { h}_{1 } }^{- {5 } over {2 } } } over { { 2m}_{1 }(1-s) SQRT { 2gs} }+[ LEFT { b+z( { d}_{0 }+ { h}_{0 } )RIGHT } { p}_{1 }L+(1+ SQRT { 1+ { z}^{2 } } ) { p}_{2 }L+ { nkp}_{5 }}}}} {{{{+( { 2z}_{0 }+m )(1-s) { L}_{d } { p}_{7 } ]=0 }}}} (b) in the orifice type of intake sluice, {{{{ { zp}_{1 } { Lh}_{1 }- { { { 3Q}_{1 } { p}_{6 } { h}_{1 } }^{- {5 } over {2 } } } over { { 2m}_{2 }m' SQRT { 2gs} }+[ LEFT { b+z( { d}_{0 }+ { h}_{0 } )RIGHT } { p}_{1 }L+(1+ SQRT { 1+ { z}^{2 } } ) { p}_{2 }L}}}} {{{{+( { 2z}_{0 }+m )(1-s) { L}_{d } { p}_{7 } ]=0}}}} The construction cost of weir cut-off and revetment on outside slope of leeve, and the damages suffered from inundation in upstream area were not included in the process of deriving the above conditional equations, but it is true that magnitude of intake water depth influences somewhat on the cost and damages. Therefore, in applying the above equations the fact that should not be over looked is that the design value of intake water depth to be adopted should not be more largely determined than the value of h1 satisfying the above formulas.

  • PDF

내마모계 Al-Si 재료의 레오로지 성형기술 개발 (I);충진거동 및 결함분석 (Development of Rheology Forming Technology of Wear Resistance Al-Si Materials (I);Filling Behavior and Defect Evaluation)

  • 정홍규;강성수;문영훈;강충길
    • 한국주조공학회지
    • /
    • 제20권6호
    • /
    • pp.368-376
    • /
    • 2000
  • Rheology forming technology has been accepted as a new method for fabricating near net shaped products with lightweight aluminum alloys. The rheology forming process consists of reheating process of billet, billet handling, filling into the die cavity and solidification of rheology formed part. The rheology forming experiments are performed with two different die temperatures ($T_d$ = $200^{\circ}C$, $300^{\circ}C$) and orifice gate type. The filling behavior and various defects of Al-Si materials with wear resistance (A357, A390 and ALTHIX 86S) fabricated in rheology forming process are evaluated in terms of alloying elements and surface non-uniformity. Finally, the methods to obtain the rheology formed products with high quality are described by solutions for avoiding the surface and internal defects.

  • PDF