• Title/Summary/Keyword: Order Management

Search Result 18,075, Processing Time 0.039 seconds

Modeling and Verification of A data registry-based Management System for Network Object (데이타 레지스트리에 기반한 네트워크 객체 관리 시스템의 모델링 및 검증)

  • 최오훈;백두권
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2002.05a
    • /
    • pp.61-65
    • /
    • 2002
  • These days, in order to satisfy the complex and various demands of the customers, the telecommunication networks must provide rapid and flexible services, with the support of efficient service and network management systems. To satisfy these requirements, many objects for management have been released to manage network services and elements. But there are no efficient ways to manage these newly managed objects in object-oriented software. Therefore, we study several problems, when a subsystem using object-oriented technique is implemented. The first problem is that interface works between realized application programs using its technique. The second problem is that reusability of internal managed objects is difficult. In this paper, we will point out some problems and to solve these problems, we have proposed the Object Management System (OMS) architecture, which supports a transparent interface between object-oriented applications and the distributed data repositories. Also in order to manage efficient business objects stored in the different repositories, we suggest a method for integrating dynamic information resources in heterogeneous and distributed network environments. Finally, we applied OMS to TINA(Telecommunication Information Network Architecture) domain, implemented OMS, and verified it with SMV(Symbolic Model Verifier) which is model checking technology.

  • PDF

On-line Fussy Performance Management of Profibus Networks

  • Lee, Kyung-Chang;Song Kang;Kim, Dong-Wook;Lee, Suk
    • International Journal of Precision Engineering and Manufacturing
    • /
    • v.1 no.2
    • /
    • pp.5-13
    • /
    • 2000
  • Most networks for automation are tuned to an expected traffic condition ar their design stage. During their actual operations, however, the networks experience considerable changes in traffic from time to time. These traffic changes caused by common events like machine failure and production schedule change may adversely affect th network performance and, in turn , the performance of the connected devices. This paper presents experimental results for performance management of a Profibus-FMS network. The performance management aims to maintain a uniform level of network performance at all stations under changing network traffic. The performance management algorithm monitors the performance of individual network stations and commands the stations to change their timer values in order to have comparable performance at all stations. In order to determine the amount of timer change, the algorithm employs a set of fuzzy rules. The algorithm has been evaluated on a Profibus network.

  • PDF

Analysis on the Current Evaluation items for the Performance-focused Management of the Concrete Retaining Wall (콘크리트 옹벽의 성능위주평가를 위한 평가항목 분석 연구)

  • Lee, Dong Yul;Seong, Joo Hyun;Jeong, Hae Sang;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.6
    • /
    • pp.56-62
    • /
    • 2015
  • Recently, one of countermeasures against aging SOC infrastructures, performance-focused management including the serviceability, functionality, durability, and economics has been changed from the structural safety-focused evaluation has changed into The current inspection and diagnosis for the major SOC facilities in Korea has been carried out by the specific principle of details, and most of them checked by the visual inspection are focused on the repair and rehabilitation of the damaged structures, thus they are the preventive maintenance. However, the performance-focused management should be replaced for the effective and economic maintenance as wells as for the minimization of the damage. In this regard, this study the appropriacy of the current evaluation items about the concrete retaining wall, one of SOC infrastructures as the previous step forward the performance-focused management. In order to deduct the effective evaluation items in order, the entropy, analytic hierachy process (AHP), and promethee analysis were peformed and the results were compared and discussed.

Study on a New Response Function Estimation Method Using Neural Network (신경망 기법을 이용한 새로운 반응함수 추정 방법에 관한 연구)

  • Hoang, Thanh-Tra;Le, Tuan-Ho;Shin, Sangmun;Jeong, Woo-Sik;Kim, Chul-Soo
    • Journal of Korean Society for Quality Management
    • /
    • v.41 no.2
    • /
    • pp.249-260
    • /
    • 2013
  • Purpose: The main objective of this paper is to propose an RD method by developing a neural network (NN)-based estimation approach in order to provide an alternative aspect of response surface methodology (RSM). Methods: A specific modeling procedure for integrating NN principles into response function estimations is identified in order to estimate functional relationships between input factors and output responses. Finally, a comparative study based on simulation is performed as verification purposes. Results: This simulation study demonstrates that the proposed NN-based RD method provides better optimal solutions than RSM. Conclusion: The proposed NN-based RD approach can be a potential alternative method to utilize many RD problems in competitive manufacturing nowadays.

Performance Evaluation of the HomePNA 3.0 Asynchronous MAC Mode with Collision Management Protocol (HomePNA 3.0 비동기 MAC 모드의 Collision Management Protocol 성능 분석)

  • 김희천;정민영;이태진
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.29 no.7A
    • /
    • pp.727-734
    • /
    • 2004
  • Collision Management Protocol (CMP) efficiently resolves collisions when data frames are transmitted in networks consisting of HomPNA 3.0 asynchronous MAC mode device with random access. Unlike Distributed Fair Priority Queueing (DFPQ) algorithm in HomePNA 2.0 or Binary Exponential Backoff (BEB) algorithm in IEEE 802.11, order of retransmission is decided according to Collision Signaling Sequence (CSS) values allocated to each device. Thus, CMP can minimize the number of mean collisions because order of retransmission is decided in a deterministic way. In this paper. we evaluate the saturation performance of CMP in HomePNA 3.0 using an analytic method.

A Study of Implementing Knowledge Management (KM) in Construction Domain (건설업 지식경영체제 구축에 관한 연구)

  • Park Min-Kyoo;Baek Jong-kun;Kim Dae-Ho;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.273-278
    • /
    • 2001
  • Since its introduction in mid 1990s, Financial Crisis in Korea, knowledge management (KM) has been considered as a new, optimal way of corporate management style. And a large number of researches, either theoretically or empirically, were carried out in order to find out what the key success factors will be in common. However, though key success factors are extracted, it can hardly be a successful project if those are not well matched for the unique industry characteristics, still more in construction industry. Even we can find some KM precedents in construction industry, it can hardly be revealed how far they exerted themselves in order to match key factors with industry characteristics. Hence, at the dawn of implementing KM, this research work will scrutinize key success factors (KSFs) derived from previous studies and funnel those KSFs into construction domain. Then rearranged KSFs will be proposed with each key issues. Therefore, this article can contribute to setting strategies for KM in construction sector.

  • PDF

A Design of Advanced Distribution Management System Based on IT/OT Convergence (IT/OT Convergence 기반의 Advanced Distribution Management System의 설계)

  • Lim, Il-Hyung;Lee, Seung-Joo;Park, Jong-Ho;Shin, Yong-Hak
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.5
    • /
    • pp.753-759
    • /
    • 2016
  • Power automation system to operate power distribution systems can be distinguished by distribution SCADA with remote monitoring and control; and distribution automation system with basic functions such as service restoration to the distribution SCADA; and distribution management system which is operated by various applications in order to enhance distribution system operation performance based on the distribution automation system. In the technological change, a technical boundary of information technology (IT) and operation technology (OT) is being blurred by that new concepts such as interoperability. In addtion, IT/OT convergence has been proposed by the improvement of ICT and power system technology. At the viewpoint, advanced distribution management system (ADMS) to have the new concepts and to increase distribution system operation efficiency through global information and functions from the other systems has been proposed. In order to implement the ADMS, IT and OT have to be employed together on the ADMS; and the concept-based IT/OT convergence concept has been presented. Therefore, this paper introduces ADMS and IT/OT convergence and proposes a design of IT/OT convergence based ADMS system design with configurations and functions.

A study on the integrated data modeling for the plant design management system and the plant design system using relational database (관계형 데이터베이스를 이용한 PDMS/PDS의 통합 데이터 모델링에 관한 연구)

  • 양영태;김재균
    • Journal of Ocean Engineering and Technology
    • /
    • v.11 no.3
    • /
    • pp.200-211
    • /
    • 1997
  • Most recently, offshore Engineering & Construction field is concerned about integration management technology such as CIM(Computer Integrated Manufacturing), PDM(Product Data Management) and Enterprise Information Engineering in order to cope with the rapid change of engineering and manufacturer specification as per owner's requirement during construction stage of the project. System integration and integrated data modeling with relational database in integration management technology improve the quality of product and reduce the period of the construction project by reason of owing design information jointly. This paper represents the design methodology of system integration using Business Process Reengineering by the case study. The case study is about the offshore plant material information process from front end engineering design to detail engineering for the construction and the basis of monitoring system by integrating and sharing the design information between the 2D intelligent P&ID and 3D plant modeling using relational database. As a result of the integrated data modeling and system integration, it is possible to maintain the consistency of design process in point of view of the material balancing and reduce the design assumption/duration. Near future, this system will be expanded and connected with the MRP(Material Requirement Planing) and the POR (Purchase Order Requisition) system.

  • PDF

Development of Web-based Design Review System for Reliability and Safety Knowledge Management

  • Otsuka, Yuichi;Yukawa, Takashi;Mutoh, Yoshiharu
    • International Journal of Safety
    • /
    • v.9 no.2
    • /
    • pp.22-28
    • /
    • 2010
  • This paper describes a web-based design review system as a knowledge management system relating reliability and safety system design. Since people's consciousness for safety and security become sensitive and increases the need of establishing a proactive prevention method for internal failures and relating risks in products. It also means that prevailing tacit knowledge in retired workers, in order to transform them to be easily used to support new system development, become more important. When considering safety and reliability design, at least two data sheet are necessary; Failure Modes and Effects Analyses (FMEA) and Risk Assessment (RA). These two data are practically made separately. However, it includes the concerns that a risk by failures during long-term use may not be noticed. To overcome this insufficiency, a support tool for integrating reliability evaluation and risk assessment data simultaneously is expected to be revealed. The authors have then developed a web-based design review system for reliability and safety system design. The system include various profitable functions; making FMEA and RA sheet, retrieving past data sheet for engineering change management and new product development and web-based discussion to increase the efficiency of discussion. The system is applied to one practical development works in order to demonstrate its effectiveness that is to be made clear by interviewing user's qualitative comment.

A study on the difference in safety awareness of research employees working for laboratory safety management of university institutes - University, Junior College, Polytechnic Colleges- (대학의 연구실 안전관리를 위한 연구활동 종사자의 안전의식 차이에 관한 연구 - 일반대학, 전문대학, 폴리텍대학 -)

  • Kwon, Yuna;Kwon, Young-Guk
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.89-96
    • /
    • 2015
  • The study was conducted with statical analysis of data (828 data in 2010, 752 data in 2012, 648 data in 2014) in order to evaluate laboratory awareness difference of research employees working in different types of universities. Results of the study were as follows: First, university institutes in the order of polytechnic colleges, university, and junior college showed the highest laboratory safety awareness in 'awareness and education of laboratorial safety regulation' and 'awareness in laboratory risk factors'. Second, the difference in safety awareness of universities by year(years that conducted current status survey) was the highest in year 2014, then in 2010, and in 2008. Third, the difference of research employees working for laboratory safety management by year(years that conducted current status) showed that university had the highest laboratory safety awareness in year 2010, but it changed to polytechnic colleges in year 2012 and 2014. Through this study, we could recognize the difference in safety awareness of research employees working in university institutes.