• Title/Summary/Keyword: Optimum maintenance cost

Search Result 126, Processing Time 0.02 seconds

Requirement of Track Maintenance Plan Support System (궤도유지보수작업계획수립지원 시스템의 요구조건)

  • Lee Jee-Ha;Hwang Sung-Ho;Park Ok-Jung
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.886-891
    • /
    • 2004
  • The process of determining whether, when, where and how to intervene, of deciding on optimum allocation of resources and minimizing the cost is a very complex problem: different track sections tend to behave differently under the effects of loading; decision-making processes for maintenance work are closely interrelated technically and economically; decision-making for maintenance plans is based on a large quantity of technical and economic information, extensive knowledge and above all experience. For that reason, It is considered very important to develope objective and computer-aided decision-making support system for track maintenance plan. On this paper, we made a survey of the state-of-art of decision-making support systems for track maintenance which were developed and used abroad and reviewed requirements of system and present the plan of develope decision-making support system for track maintenance appropriate to local condition.

  • PDF

Development of Stochastic Expected Cost Model for Preventive Optimal- Maintenance of Armor Units of Rubble-Mound Breakwaters (경사제 피복재의 예방적 최적 유지관리를 위한 추계학적 기대비용모형의 개발)

  • Lee, Cheol-Eung
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.25 no.5
    • /
    • pp.276-284
    • /
    • 2013
  • A stochastic expected cost model has been suggested by combining the nonlinear cumulative damage model with the expected cost model together which can be useful for doing the preventive optimal-maintenance of the armor units of rubble-mound breakwaters. The suggested model has been satisfactorily calibrated by comparison of the results from others models, also the sensitivity analysis has been carried out in detail under the variation of the associated parameters with the model. The optimal repair times can be directly evaluated by minimizing the expected cost rates that depend on the social importances, damage intensity functions and resistance limits. Finally, the present cost model has been straightforwardly applied to the armor units of rubble-mound breakwaters. Based on the assumption of turning the damaged structure back to the state as good as new after repairs, the required optimal repair times and magnitudes can be determined quantitatively in terms of the optimum balance between the costs and benefits on the preventive maintenance.

Optimum Service Life Management Based on Probabilistic Life-Cycle Cost-Benefit Analysis (확률론적 생애주기비용-이익분석 기반 수명관리 최적화 기법)

  • Kim, Sunyong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.4
    • /
    • pp.19-25
    • /
    • 2016
  • Engineering structures including civil infrastructures require a life-cycle cost and benefit during their service lives. The service life of a structure can be extended through appropriate inspection and maintenance actions. In general, this service life extension requires more life-cycle cost and cumulative benefit. For this reason, structure managers need to make a rational decision regarding the service life management considering both the cost and benefit simultaneously. In this paper, the probabilistic decision tool to determine the optimal service life based on cost-benefit analysis is presented. This decision tool requires an estimation of the time-dependent effective cost-benefit under uncertainty to formulate the optimization problem. The effective cost-benefit is expressed by the difference between the cumulative benefit and life-cycle cost of a deteriorating structure over time. The objective of the optimization problem is maximizing the effective cost-benefit, and the associated solutions are the optimal service life and maintenance interventions. The decision tool presented in this paper can be applied to any deteriorating engineering structure.

Preliminary Analysis on Artificial Intelligence-based Methodology for Selecting Repair and Rehabilitation Methods of Bridges (인공지능 기반의 교량 보수공법 선정 기술 개발을 위한 선행 분석)

  • Kim, Jonghyeob;Jung, In-Su;Yun, Won-Gun;Kim, Jung-Yeol;Park, In-Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.6_2
    • /
    • pp.861-872
    • /
    • 2021
  • An efficient cost management is important for the domestic social overhead capital(SOC) based on a long lifecycle after 30 years since completion. Maintenance in South Korea have had the restrictions of consistency and suitability of decision-making by the establishment of a budget plan based on the company estimate and repair and reinforcement methods determined by the inspection and diagnosis engineers' subjective determination for each facility. To resolve this issue, the Korea Institute of Civil Engineering and Building Technology is currently in development of a methodology to propose an optimum maintenance method according to the damage of components by artificial intelligence. This study has deduced the primary factors by analyzing information generated during bridge maintenance and management as a prior step for the development of technologies, and conducted a preliminary analysis to select the optimum artificial intelligence technology.

Decision-making support system for track maintenance (궤도 유지관리 의사결정 지원 시스템 개발)

  • Lee, Jee-Ha;Rim, Nam-Hyoung;Yang, Shin-Chu
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.454-459
    • /
    • 2003
  • The process of determining whether, when, where and how to intervene, of deciding on optimum allocation of resources and minimizing the cost is a very complex problem: different track sections tend to behave differently under the effects of loading; decision-making processes for maintenance work are closely interrelated technically and economically; decision-making for maintenance plans is based on a large quantity of technical and economic information, extensive knowledge and above all experience. For that reason, It is considered very important to develope objective and computer-aided decision-making support system for track maintenance plan. On this paper, we reviewed ECOTRACK system and present the plan of develope decision-making support system for track maintenance appropriate to local condition.

  • PDF

Research on the Optimum Design for PSC Box Girder Bridges Using the Full Staging Method (FSM 공법 PSC 박스 거더교의 최적설계에 관한 연구)

  • Kim, Ki-Wook;Park, Moon-Ho;Chang, Chun-Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.3
    • /
    • pp.159-167
    • /
    • 2004
  • The objective of this study is development of the optimum design program to minimize the cost for PSC box girder bridge using the full staging method to indicate the necessity for the optimum design applied many types of bridges. It also considered the proper span length to girder depth ratio and the cell number along the width of bridge. This program used SUMT procedure and Kavlie's extended penalty function to allow infeasible design points in the process. Powell's direct method was used in searching design points and Gradient Approximate Method was used to reduce design hours. This study showed the convergence in design parameter and correlation of totally optimized cost according to cell numbers, span lengths, and lane numbers.

Discrete Optimum Design of Reinforced Concrete Beams using Genetic Algorithm (유전알고리즘을 이용한 철근콘크리트보의 이산최적설계)

  • Hong, Ki-Nam;Han, Sang-Hoon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.1
    • /
    • pp.259-269
    • /
    • 2005
  • This paper describes the application of genetic algorithm for the discrete optimum design of reinforced concrete continuous beams. The objective is to minimize the total cost of reinforced concrete beams including the costs of concrete, form work, main reinforcement and stirrup. The flexural and shear strength, deflection, crack, spacing of reinforcement, concrete cover, upper-lower bounds on main reinforcement, beam width-depth ratio and anchorage for main reinforcement are considered as the constraints. The width and effective depth of beam and steel area are taken as design variables, and those are selected among the discrete design space which is composed with dimensions and steel area being used from in practice. Optimum result obtained from GA is compared with other literature to verify the validity of GA. To show the applicability and efficiency of GA, it is applied to three and five span reinforced concrete beams satisfying with the Korean standard specifications.

Analysis of Life Cycle Cost for Heat Source Equipments in Buildings for Adolescent Trainees (청소년 수련관의 열원설비 대안별 생애주기 비용에 관한 연구)

  • Ahn, Chang-hwan;Pang, Seung-ki;Baik, Yong-gyu
    • KIEAE Journal
    • /
    • v.5 no.3
    • /
    • pp.25-31
    • /
    • 2005
  • Computer simulations were performed for Heating Ventilating and Air-Conditioning (HVAC) systems to figure out more efficient maintenance methods for the building used for adolescent trainees. This study aims at suggesting design alternatives for optimum operation and performing life cycle cost (LCC) for each alternative. First, the capacity of the heat source equipment was determined using annual maximum heating and cooling loads. Annual loads were calculated and applied to the alternative for the purpose of calculating annual energy cost. Second, several types of data were collected to predict energy cost. Finally, the pay back period for each alternative was calculated using total cost estimation during standard duration period. This study indicates that the absorption chiller that does not occupy most part of a mechanical room, and does not need much operation cost was most economical.

An Optimum Maintenance Policy : A bayesian approach to periodic incomplete preventive maintenance with minimal repair at failure

  • Park, Kwang-Su;Jun, Chi-Hyuck
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1997.10a
    • /
    • pp.193-196
    • /
    • 1997
  • In this paper we consider a Bayesian theoretic approach to periodic incomplete preventive maintenance with minimal repair at failure. We assume that the system failure rate is increasing as the frequency of PM increases and that the system is replaced at the K-th PM under this maintenance strategy. The optimal policies which minimize the expected cost rates are discussed. We seek the optimal periodic PM interval x and replacement time K under a Weibull failure intensity. Assuming suitable prior distribution for the Weibull parameters, we derive the posterior distribution incorporating failure data and obtain the updated optimal replacement strategies.

  • PDF

Research on optimal cost calculation for efficient maintenance of offshore wind farms (해상풍력단지의 효율적인 유지보수를 위한 최적 비용 산출 연구)

  • Hui-Seok Gu;In-Cheol Kim;Man-Bok Kim;Man-Soo Choi
    • Journal of Wind Energy
    • /
    • v.14 no.3
    • /
    • pp.61-68
    • /
    • 2023
  • This paper aims to perform optimal operation and maintenance with an integrated monitoring system for offshore wind platforms. Based on the wind direction and wind speed data of existing wind farms, a monitoring system was established along with weather and weather data to maximize the operational efficiency of wind farms. Compared to wind power on land, offshore wind power is difficult to maintain due to weather, logistics and geographical limitations. Therefore, economic analysis of actual operation and maintenance is essential for large-scale offshore wind farms. In this paper, the availability of offshore wind farms was analyzed by using personnel resources, parts inventory, Crew Transfer Vessel (CTV) and Specialized service Operation Vessel (SOV) etc. before the actual operation and maintenance of wind farms. A comparative analysis was conducted to determine the optimum operating efficiency and economical maintenance costs.