• Title/Summary/Keyword: Optimized Schedule

Search Result 70, Processing Time 0.024 seconds

Drone Force Deployment Optimization Algorithm For Efficient Military Drone Operations (효율적 군용 드론 작전 운영을 위한 Drone Force Deployment Optimization 알고리즘)

  • Song, Ju-Young;Jang, Hyeon-Deok;Chung, Jong-Moon
    • Journal of Internet Computing and Services
    • /
    • v.21 no.1
    • /
    • pp.211-219
    • /
    • 2020
  • One of the major advancements of the Fourth Industrial Revolution is the use of Internet of Drones (IoD), which combines the Internet of Things (IoT) and drone technology. IoD technology is especially important for efficiently and economically operating C4ISR operations in actual battlefields supporting various combat situations. The purpose of this study is to solve the problems of limited battery capacity of drones and lack of budgeting criteria for military drone transcription, introduction, and operation. If the mission area is defined and corresponding multi-drone hovering check points and mission completion time limits are set, then an energy and time co-optimized scheduling and operation control scheme is needed. Because such a scheme does not exist, in this paper, a Drone Force Deployment Optimization (DFDO) scheme is proposed to help schedule multi-drone operation scheduling and networked based remote multi-drone control.

The Digital Mock-Up Information System for New Car Development

  • Min, Sung-Ki;Lee, Chul-Woo
    • Proceedings of the CALSEC Conference
    • /
    • 1999.07a
    • /
    • pp.277-299
    • /
    • 1999
  • Since Chrysler Motor Co. had experienced the digital development system in the beginning of 1990's, most of leading automobile companies are trying to apply a digital information system for their own business process reengineering based upon concurrent engineering system from product planning phase. This is called as virtual DMU(Digital Mock-Up) system instead of the traditional PMU(Physical Mock-Up) system. By using the virtual prototype, all of the design requirements and system specifications can be checked, changed and optimized more quickly and more efficiently. This paper consists of five chapters for the DMU information system. In the 1$^{st}$ chapter, the principle of digital design system is suggested by using four basic modules such as product design module, process design module, manufacturing system design module and central control module. The basic scheme of DMU is introduced with the benefits of application in the chapter 2. In the chapter 3, a digital design process of new car development is explained with the detailed DMU design and design review processes. In the chapter 4, the practical DMU manufacturing techniques and applications are introduced as CAD/CAM analyses, DPA(Digital Pre-Assembly)reviews for development, production, operation and maintenance phases, digital tolerance analyses and digital factory analyses for assembling line simulation, automated robot welding processes, production jig & fixtures and painting process simulation. Finally, the activities of digital design support; CAS-styling, CAE-engineering and CAT-testing are summarized for design optimization in the chapter 5. As today's automobile manufactures and related business organizations are struggling to compete in the global marketplace, they are concentrating on efficient use of DMU information system to reduce the new car development cost, to have shorten the delivery schedule and to improve product design quality. To meet the demand of those automobile industries on digital information systems, the CALS(Computer aided Acquisition and Logistics Support) and EC(Electronic Commerce)initiative has been focused as a dominant philosophy in defense & commercial industries, specially automobile industries.s.

  • PDF

A Study on the Power Management Algorithm of Centralized Electric Vehicle Charging System (중앙제어기반 전기자동차 충전시스템의 에너지관리 알고리즘에 관한 연구)

  • Do, Quan-Van;Lee, Seong-Joon;Lee, Jae-Duck;Bae, Jeong-Hyo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.3
    • /
    • pp.566-571
    • /
    • 2011
  • As Plug-in Hybrid Vehicle and Electric Vehicle (PHEV/EV) take a greater share in the personal automobile market, their high penetration levels may bring potential challenges to electric utility especially at the distribution level. Thus, there is a need for the flexible charging management strategy to compromise the benefits of both PHEV/EV owners and power grid side. There are many different management methods that depend on the objective function and the constraints caused by the system. In this paper, the schema and dispatching schedule of centralized PHEV/EV charging spot network are analyzed. Also, we proposed and compared three power allocation strategies for centralized charging spot. The first strategy aims to maximize state of vehicles at plug-out time, the rest methods are equalized allocation and prioritized allocation based on vehicles SoC. The simulation results show that each run of the optimized algorithms can produce the satisfactory solutions to response properly the requirement from PHEV/EV customers.

Optimized Air Force Flight Scheduling Considering Pilot' s Mission Efficiency (조종사 임무 효율을 고려한 공군 비행 스케줄 최적화)

  • Kwon, Min Seok;Yoon, Chan Il;Kim, Jiyong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.4
    • /
    • pp.116-122
    • /
    • 2020
  • Human and material resource planning is one representative example of Operations Research. Resource planning is important not only in civilian settings but also in military ones. In the Air Force, flight scheduling is one of the primary issues that must be addressed by the personnel who are connected to flight missions. However, although the topic is of great importance, relatively few studies have attempted to resolve the problem on a scientific basis. Each flight squadron has its own scheduling officers who manually draw up the flight schedules each day. While mistakes may not occur while drafting schedules, officers may experience difficulties in systematically adjusting to them. To increase efficiency in this context, this study proposes a mathematical model based on a binary variable. This model automatically drafts flight schedules considering pilot's mission efficiency. Furthermore, it also recommends that schedules be drawn up monthly and updated weekly, rather than being drafted from scratch each day. This will enable easier control when taking the various relevant factors into account. The model incorporates several parameters, such as matching of the main pilots and co-pilots, turn around time, availability of pilots and aircraft, monthly requirements of each flight mission, and maximum/minimum number of sorties that would be flown per week. The optimal solution to this model demonstrated an average improvement of nearly 47% compared with other feasible solutions.

Forecasting Air Freight Demand in Air forces by Time Series Analysis and Optimizing Air Routing Problem with One Depot (군 항공화물수요 시계열 추정과 수송기 최적화 노선배정)

  • Jung, Byung-Ho;Kim, Ik-Ki
    • Journal of Korean Society of Transportation
    • /
    • v.22 no.5
    • /
    • pp.89-97
    • /
    • 2004
  • The Korea Air Force(KAF) has operated freight flights based on the prefixed time and route schedule, which is adjusted once in a month. The major purpose of the operation of freight flights in the KAF is to distribute necessary supplies from the home air base to other air bases. The secondary purpose is to train the young pilots to get more experiences in navigation. Each freight flight starts from and returned to the home air base everyday except holidays, while it visits several other air bases to accomplish its missions. The study aims to forecast freight demand at each base by using time series analysis, and then it tried to optimize the cost of operating flights by solving vehicle routing problem. For more specifically, first, several constraints in operating cargos were defined by reviewing the Korea Air Force manuals and regulation. With such constraints, an integer programming problem was formulated for this specific routing problem allowing several visits in a tour with limitation of maximum number of visits. Then, an algorithm to solve the routing problem was developed. Second, the time series analysis method was applied to find out the freight demand at each air base from the mother air base in the next month. With the forecasted demands and the developed solution algorithm, the oprimum routes are calculated for each flight. Finally, the study compared the solved routing system by the developed algorithm with the existing routing system of the Korea Air Force. Through this comparison, the study proved that the proposed method can provide more (economically) efficient routing system than the existing system in terms of computing and monetary cost. In summary, the study suggested objective criteria for air routing plan in the KAF. It also developed the methods which could forecast properly the freight demands at each bases by using time series analysis and which could find the optimum routing which minimizes number of cargo needed. Finally, the study showed the economical savings with the optimized routing system by using real case example.

Development of the Program Management System for Mega Project in Urban Regeneration (도시재생사업의 메가프로젝트 건설관리시스템 개발)

  • Hyun, Chang-Teak;Kim, Ju-Hyung;Park, Il-Soo;Yu, Jung-Ho;Son, Bo-Sik;Hong, Tae-Hoon;Seo, Yong-Chil;Lee, Sang-Bum;Kim, Hyoung-Kwan;Kim, Chang-Wan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.176-183
    • /
    • 2008
  • Recently, several large-scale Mega-Projects are being conducted. For these urban revitalization projects which requires many complex functions, the existing project management system based on single project level is limited in application. Therefore, our main objectives of this research are two 1) Develop a brand-new program management system(Prototype Ver 1.0) for mega-projects where various facilities are combined both horizontally and vertically. 2) Develop management strategies(Prototype Ver 1.0) based on the program level that enable the comprehensive management of a multiple various projects. The subtitles of this Research are i-PMIS(Program Management Information System) Development, Standardization & Optimization of Construction Life-Cycle Process, Comprehensive Project Cost & Process Management Technology, Effective and Optimized Integrated Performance Management Technology, and, we suggest to optimize the whole life cycle process, predict and respond to various risks, predict and control the process, the cost and the schedule, achieve maximum return on investment to the participating parties, and provide a brand-new Program-MIS including the visual-based web-portal platform to respond the changing business environments and decision making.

  • PDF

A Study on the Optimal Setting of Large Uncharged Hole Boring Machine for Reducing Blast-induced Vibration Using Deep Learning (터널 발파 진동 저감을 위한 대구경 무장약공 천공 장비의 최적 세팅조건 산정을 위한 딥러닝 적용에 관한 연구)

  • Kim, Min-Seong;Lee, Je-Kyum;Choi, Yo-Hyun;Kim, Seon-Hong;Jeong, Keon-Woong;Kim, Ki-Lim;Lee, Sean Seungwon
    • Explosives and Blasting
    • /
    • v.38 no.4
    • /
    • pp.16-25
    • /
    • 2020
  • Multi-setting smart-investigation of the ground and large uncharged hole boring (MSP) method to reduce the blast-induced vibration in a tunnel excavation is carried out over 50m of long-distance boring in a horizontal direction and thus has been accompanied by deviations in boring alignment because of the heavy and one-directional rotation of the rod. Therefore, the deviation has been adjusted through the boring machine's variable setting rely on the previous construction records and expert's experience. However, the geological characteristics, machine conditions, and inexperienced workers have caused significant deviation from the target alignment. The excessive deviation from the boring target may cause a delay in the construction schedule and economic losses. A deep learning-based prediction model has been developed to discover an ideal initial setting of the MSP machine. Dropout, early stopping, pre-training techniques have been employed to prevent overfitting in the training phase and, significantly improved the prediction results. These results showed the high possibility of developing the model to suggest the boring machine's optimum initial setting. We expect that optimized setting guidelines can be further developed through the continuous addition of the data and the additional consideration of the other factors.

Optimized Implementation of PIPO Lightweight Block Cipher on 32-bit RISC-V Processor (32-bit RISC-V상에서의 PIPO 경량 블록암호 최적화 구현)

  • Eum, Si Woo;Jang, Kyung Bae;Song, Gyeong Ju;Lee, Min Woo;Seo, Hwa Jeong
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.11 no.6
    • /
    • pp.167-174
    • /
    • 2022
  • PIPO lightweight block ciphers were announced in ICISC'20. In this paper, a single-block optimization implementation and parallel optimization implementation of PIPO lightweight block cipher ECB, CBC, and CTR operation modes are performed on a 32-bit RISC-V processor. A single block implementation proposes an efficient 8-bit unit of Rlayer function implementation on a 32-bit register. In a parallel implementation, internal alignment of registers for parallel implementation is performed, and a method for four different blocks to perform Rlayer function operations on one register is described. In addition, since it is difficult to apply the parallel implementation technique to the encryption process in the parallel implementation of the CBC operation mode, it is proposed to apply the parallel implementation technique in the decryption process. In parallel implementation of the CTR operation mode, an extended initialization vector is used to propose a register internal alignment omission technique. This paper shows that the parallel implementation technique is applicable to several block cipher operation modes. As a result, it is confirmed that the performance improvement is 1.7 times in a single-block implementation and 1.89 times in a parallel implementation compared to the performance of the existing research implementation that includes the key schedule process in the ECB operation mode.

The Acceptance Testing of 5 Mega Pixels Primary Electronic Display Devices and the Study of Quality Control Guideline Suitable for Domestic Circumstance (5 Mega 화소 진단용 전자표시장치 인수검사 및 국내 실정에 적합한 정도관리 가이드라인 연구)

  • Jung, Hai-Jo;Kim, Hee-Joung;Kim, Sung-Kyu
    • Progress in Medical Physics
    • /
    • v.18 no.2
    • /
    • pp.98-106
    • /
    • 2007
  • In June 2005, Yonsei University Medical Center, Severance Hospital upgraded a full-PACS system by adding twenty (5 mega pixels) Totoku ME511L flat panel LCD display devices for diagnostic interpretation purposes. Here we report upon the quantitative (or visual) acceptance testing of the twenty Totoku ME511L display devices for reflection, luminance response, luminance spatial dependency, resolution, noise, veiling glare, and display chromaticity based on AAPM TG 18 report. The tools used in the tests included a telescopic photometer, which was used as a colorimeter, illuminance meter, light sources for reflection assessment, light-blocking devices, and digital TG18 test patterns. For selected 8 flat panel displays, mean diffuse reflection coefficient ($R_d$) was $0.019{\pm}0.02sr^{-1}$. In the luminance response test, luminance ratio (LR), maximum luminance difference ($L_{max}$), and deviation of contrast response were $550{\pm}100,\;2.0{\pm}1.9%\;and\;5.8{\pm}1.8%$, respectively. In the luminance uniformity test, maximum luminance deviation was $14.3{\pm}5.5%$ for the 10% luminance of the TG18-UNL10 test pattern. In the resolution test with luminance measurement method, percent luminance (${\Dalta}L$) at the center was $0.94{\pm}0.64%$. In all cases of noise testing, rectangular target In every square in the three quadrants was visible and all 15 targets except the smallest one in the every corner pattern and the center pattern. The glare ratio (GR) was $12,346{\pm}1,995$. The color uniformity, (u',v'), was $0.0025{\pm}0.0008$. Also, the research results of qualify control guideline of primary disply devices suitable for domestic circumstance are presented All test results are in-line with the criteria recommended by AAPM TG18 report and are thus fully acceptable for diagnostic image interpretation. As a result, the acceptance testing schedule described provides not only an acceptance standard but also guidelines for quality control, optimized viewing conditions, and a means for determining the upgrading time of LCD display devices for diagnostic interpretation.

  • PDF

Optimization and Stabilization of Automated Synthesis Systems for Reduced 68Ga-PSMA-11 Synthesis Time (68Ga-PSMA-11 합성 시간 단축을 위한 자동합성장치의 최적화 및 안정성 연구)

  • Ji hoon KANG;Sang Min SHIN;Young Si PARK;Hea Ji KIM;Hwa Youn JANG
    • Korean Journal of Clinical Laboratory Science
    • /
    • v.56 no.2
    • /
    • pp.147-155
    • /
    • 2024
  • Gallium-68-prostate-specific membrane antigen-11 (68Ga-PSMA-11) is a positron emission tomography radiopharmaceutical that labels a Glu-urea-Lys-based ligand with 68Ga, binding specifically to the PSMA. It is used widely for imaging recurrent prostate cancer and metastases. On the other hand, the preparation and quality control testing of 68Ga-PSMA-11 in medical institutions takes over 60 minutes, limiting the daily capacity of 68Ge/68Ga generators. While the generator provides 1,110 MBq (30 mCi) nominally, its activity decreases over time, and the labeling yield declines irregularly. Consequently, additional preparations are needed, increasing radiation exposure for medical technicians, prolonging patient wait times, and necessitating production schedule adjustments. This study aimed to reduce the 68Ga-PSMA-11 preparation time and optimize the automated synthesis system. By shortening the reaction time between 68Ga and the PSMA-11 precursor and adjusting the number of purification steps, a faster and more cost-effective method was tested while maintaining quality. The final synthesis time was reduced from 30 to 20 minutes, meeting the standards for the HEPES content, residual solvent EtOH content, and radiochemical purity. This optimized procedure minimizes radiation exposure for medical technicians, reduces patient wait times, and maintains consistent production schedules, making it suitable for clinical application.