• Title/Summary/Keyword: Optimal preventive maintenance

Search Result 117, Processing Time 0.025 seconds

Parametric Estimation of a Renewal Function

  • Jeong, Hai-Sung;Na, Myung-Hwan
    • International Journal of Reliability and Applications
    • /
    • v.1 no.1
    • /
    • pp.81-87
    • /
    • 2000
  • One of the most important quantities in reliability theory is the expected number of renewals of a system during a given interval. This quantity, the renewal function, is used to determine the optimal preventive maintenance policy and to estimate the cost of a warranty. In this paper we study a parametric approach for a renewal function. The simulation study is presented to compare the relative performance of the introduced estimators of a renewal function. And we show that the proposed parametric estimator performs well.

  • PDF

A Maintenance Design of Connected-(r, s)-out-of-(m, n) F System Using Simulated Annealing (시뮬레이티드 어닐링을 이용한(m, n)중 연속(r,s) : F 시스템의 정비모형)

  • Lee, Sangheon;Kang, Youngtai;Shin, Dongyeul
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.34 no.1
    • /
    • pp.98-107
    • /
    • 2008
  • The purpose of this paper is to present an optimization scheme that aims at minimizing the expected cost per unittime. This study considers a linear connected-(r, s)-ouI-of-(m, n):f lattice system whose components are orderedlike the elements of a linear (m, n)-matrix. We assume that all components are in the state 1 (operating) or 0(failed) and identical and s-independent. The system fails whenever at least one connected (r, s)-submatrix offailed components occurs. To find the optimal threshold of maintenance intervention, we use a simulatedannealing(SA) algorithm for the cost optimization procedure. The expected cost per unit time is obtained byMonte Carlo simulation. We also has made sensitivity analysis to the different cost parameters. In this study,utility maintenance model is constructed so that minimize the expense under full equipment policy throughcomparison for the full equipment policy and preventive maintenance policy. The full equipment cycle and unitcost rate are acquired by simulated annealing algorithm. The SA algorithm is appeared to converge fast inmulti-component system that is suitable to optimization decision problem.

A Condition Based Maintenance Model for Systems with Weibull Distributed Deterioration (와이블 분포로 열화하는 시스템의 상태에 기초한 정비모형)

  • Kong, Myung Bock;Park, Il Gwang
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.33 no.1
    • /
    • pp.70-75
    • /
    • 2007
  • This paper discusses condition based preventive replacement for deteriorating systems. The system continuouslydeteriorates in time and fails at any deterioration level which is always monitored, It is replaced at failure or atsome deteriorated level preventively before failure. The deterioration process is represented by a Weibulldistribution with a time-linear scale parameter. The cost rate function is formed considering replacement costand opportunity loss cost and deterioration dependent failure distribution, If the system has an increasingdeterioration dependent failure rate, the optimal deterioration level for preventive replacement can be determinedfrom minimizing the cost rate. An illustrative example is given for a Weibull deterioration dependent failuredistribution.

A Simulation Study on The Discounted Cost Distribution under Age Replacement Policy

  • Dohi, Tadashi;Ashioka, Akira;Kaio, Naoto;Osaki, Shunji
    • Industrial Engineering and Management Systems
    • /
    • v.3 no.2
    • /
    • pp.134-139
    • /
    • 2004
  • During the last three decades, a few attentions have been paid for investigating the cost distribution for the optimal maintenance problems. In this article, we derive the moment of the discounted cost distribution over an infinite time horizon for the basic age replacement problem. With first two moments of the discounted cost distribution, we approximate the underlying distribution function by three theoretical distributions. Through a Monte Carlo simulation, we conclude that the log-normal distribution is the best fitted one to approximate the discounted cost distribution.

Optimal inspection frequency to mitigate the risk of building system failure

  • Au-Yong, Cheong Peng;Ali, Azlan Shah;Ahmad, Faizah;Chua, Shirley Jin Lin
    • Structural Engineering and Mechanics
    • /
    • v.64 no.3
    • /
    • pp.347-352
    • /
    • 2017
  • The poor maintenance practice increases the possibility of system failure. Subsequently, the consequences of failure fall on the aspects of output, safety and healthy, environmental integrity, system quality, and customer satisfaction. Conditionbased maintenance is seen as a potential strategy to improve performance. Whereby, the key success factor of this maintenance strategy is identified as the system inspection. This study aims to investigate the association between system breakdown rate and frequency of inspection. A mixed method approach is implemented by distributing questionnaire and interviewing for data collection. Subsequently, descriptive analysis, correlation analysis and regression are adopted to analyse the collected data from 100 respondents and the results are validated with interview data of 10 interviewees. The research result establishes significant relationship between the system breakdown rate and the frequency of inspection. Additionally, the result of regression analysis confirms that the frequency of inspection is the significant predictor of system breakdown rate. Planning of accurate inspection frequency is crucial to secure the system performance. Hence, the research signifies the importance to carry out regular inspection towards the building systems and components. As a recommendation, the maintenance personnel should assess the risk criticality of the building systems. Then, continuously monitor the condition of critical building systems; regularly inspect the condition of non-critical building systems and randomly inspect all of them.

Discounted Cost Model of Condition-Based Maintenance Regarding Cumulative Damage of Armor Units of Rubble-Mound Breakwaters as a Discrete-Time Stochastic Process (경사제 피복재의 누적피해를 이산시간 확률과정으로 고려한 조건기반 유지관리의 할인비용모형)

  • Lee, Cheol-Eung;Park, Dong-Heon
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.29 no.2
    • /
    • pp.109-120
    • /
    • 2017
  • A discounted cost model for preventive maintenance of armor units of rubble-mound breakwaters is mathematically derived by combining the deterioration model based on a discrete-time stochastic process of shock occurrence with the cost model of renewal process together. The discounted cost model of condition-based maintenance proposed in this paper can take into account the nonlinearity of cumulative damage process as well as the discounting effect of cost. By comparing the present results with the previous other results, the verification is carried out satisfactorily. In addition, it is known from the sensitivity analysis on variables related to the model that the more often preventive maintenance should be implemented, the more crucial the level of importance of system is. However, the tendency is shown in reverse as the interest rate is increased. Meanwhile, the present model has been applied to the armor units of rubble-mound breakwaters. The parameters of damage intensity function have been estimated through the time-dependent prediction of the expected cumulative damage level obtained from the sample path method. In particular, it is confirmed that the shock occurrences can be considered to be a discrete-time stochastic process by investigating the effects of uncertainty of the shock occurrences on the expected cumulative damage level with homogeneous Poisson process and doubly stochastic Poisson process that are the continuous-time stochastic processes. It can be also seen that the stochastic process of cumulative damage would depend directly on the design conditions, thus the preventive maintenance would be varied due to those. Finally, the optimal periods and scale for the preventive maintenance of armor units of rubble-mound breakwaters can be quantitatively determined with the failure limits, the levels of importance of structure, and the interest rates.

Standardization of Maintenance and Failure of Transfer Crane (Transfer Crane의 고장 및 정비 표준화)

  • Yun Won-Young;Lee You-Hyoun;Ha Young-Ju;Kim Gui-Rae;Son Bum-Shin
    • Journal of Navigation and Port Research
    • /
    • v.30 no.6 s.112
    • /
    • pp.525-531
    • /
    • 2006
  • In the port, the yard crane is very important. If a container crane or a transfer crane is broken down, it costs a lot because of the delay of work during the period of repair or reorder. But, we don't have enough spare parts because of the high cost. It is necessary to maintain high reliability of the crane through effective preventive maintenance and failure analysis. In this paper, we analyse the function and failure mechanism of the transfer crane which is a main equipment in the yard Also, we standardize failures and maintenance works using the historical data of failure and maintenance. This study which is a basic work for effective equipment operation and maintenance will support reliability engineers to decide the optimal design of the next generation equipment and operational policy of equipment.

Standardization of maintenance and failure of Transfer Crane (Transfer Crane의 고장 및 정비 작업 표준화)

  • Yun Won-Young;Lee You-Hyoun;Ha Young-Ju;Kim Gui-Rae;Son Beom-Sin
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2006.06b
    • /
    • pp.363-366
    • /
    • 2006
  • In the port, Yard Crane is very important. If container crane or transfer crane broke down, it costs much money for delaying of work during the period of repair or reorder. But, we can not have enough spare parts for its high cost. It is necessary for having the reliability of crane through the effective preventive maintenance and failure analysis. In this paper, we analysed the system's function and failure mechanism of transfer crane which is main equipment in the yard. Also, we standardized the failure and maintenance work using the historical data of failure and maintenance. This study which is the basic work for IT of equipment operation and maintenance is going to be new attempt for optimal design of next generation equipment and operation policy of equipment.

  • PDF

CONDITION MONITORING USING EMPIRICAL MODELS: TECHNICAL REVIEW AND PROSPECTS FOR NUCLEAR APPLICATIONS

  • Heo, Gyun-Young
    • Nuclear Engineering and Technology
    • /
    • v.40 no.1
    • /
    • pp.49-68
    • /
    • 2008
  • The purpose of this paper is to extensively review the condition monitoring (CM) techniques using empirical models in an effort to reduce or eliminate unexpected downtimes in general industry, and to illustrate the feasibility of applying them to the nuclear industry. CM provides on-time warnings of system states to enable the optimal scheduling of maintenance and, ultimately, plant uptime is maximized. Currently, most maintenance processes tend to be either reactive, or part of scheduled, or preventive maintenance. Such maintenance is being increasingly reported as a poor practice for two reasons: first, the component does not necessarily require maintenance, thus the maintenance cost is wasted, and secondly, failure catalysts are introduced into properly working components, which is worse. This paper first summarizes the technical aspects of CM including state estimation and state monitoring. The mathematical background of CM is mature enough even for commercial use in the nuclear industry. Considering the current computational capabilities of CM, its application is not limited by technical difficulties, but by a lack of desire on the part of industry to implement it. For practical applications in the nuclear industry, it may be more important to clarify and quantify the negative impact of unexpected outcomes or failures in CM than it is to investigate its advantages. In other words, while issues regarding accuracy have been targeted to date, the concerns regarding robustness should now be concentrated on. Standardizing the anticipated failures and the possibly harsh operating conditions, and then evaluating the impact of the proposed CM under those conditions may be necessary. In order to make the CM techniques practical for the nuclear industry in the future, it is recommended that a prototype CM system be applied to a secondary system in which most of the components are non-safety grade. Recently, many activities to enhance the safety and efficiency of the secondary system have been encouraged. With the application of CM to nuclear power plants, it is expected to increase profit while addressing safety and economic issues.

A Study on the Calculation of Load Resistance Factor of over Tension Anchors by Optimization Design (최적화 설계를 통한 과긴장 앵커의 하중-저항계수 산정 연구)

  • Soung-Kyu Lee;Yeong-Jin Lee;Yong-Jae Song;Tae-Jun Cho;Kang-Il Lee
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.4
    • /
    • pp.17-26
    • /
    • 2023
  • To consider the risk of damage and fracture of P.C strands, the existing post-maintenance system alone has the limitations, hence it is necessary to quantitatively evaluate and predict the deterioration, durability and safety of facilities and establish a reasonable maintenance system considering the asset value of facilities. Therefore, it is worth considering a preventive maintenance plan that allows proactive measures to be taken before a major defect occurs in the temporary anchor. This study devised a preventive over tension method, reviewed its effectiveness through design and field tests, by calculating the resistance factors by performing a reliability-based optimization design. At this time, the over tension anchor method was evaluated using the ratio of the residual tension force after the fracture of P.C strands to the effective tension force before the fracture of P.C strand, followed by the resistance factor calculated by the optimal solution for each random variables using Excel solver and applying it to the limit state equations. As a result of the study, if the over tension ratio is 125% to 130%, the remaining strands showed a high resistance effect even after the fracture of P.C strand. As a result of the optimization design, it was found that it is appropriate to apply the load factor (γ) of 1.25, and the resistance factors of Φ1, Φ2, Φ3 as 0.7, 0.5, 0.6.