Development of Cost Data Prototype in Reinforced Concrete work based on Productivity Analysis (생산성 분석을 통한 철근콘크리트공사의 Cost Data Prototype 개발)

  • An, Soo-Bae;Ji, Seong-Min;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.135-136
    • /
    • 2011
  • A standard of estimation is used as a basis for estimating the predetermined amount of public construction. However, they raise several points of reasonable labor to be presented to a standard of estimation. For this reason, it is difficult to make a reasonable and efficient estimation of the costs, and this situation presents an urgent need for an accurate way of making such a calculation.This study analyzed the productivity of reinforced concrete work by the CYCLONE model, and the estimated optimal labor through sensitivity analysis, and presented the model on the number of optimal labor through sensitivity analysis.

  • PDF

DECISION SUPPORT SYSTEM FOR OPTIMAL SELECTION OF HAUL ROUTES BASED ON TIME SLOTS IN EARTHMOVING OPERATION

  • Sang-Hyeok Kang;Kyeong-Geun Baik;Hyun-Gi Baek;Hyeong-Gi Park;Jong-Won Seo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1134-1139
    • /
    • 2009
  • Haul routes for earthmoving operation need to be carefully selected because the decision on the haul routes could make a significant difference in the project's cost and time. This paper proposes a decision support system for improving productivity of earthmoving operation that helps construction managers choose the best haul routes of trucks based on time slots. Also, a methodology for optimal selection of haul routes considering traffic conditions and topographic conditions of the routes is explained. Raster data model is used to find an available shortest path based on cost weighted distance. A system was developed on a geographic information system environment for efficient database management and easy manipulation of graphical data. A real-world case study was conducted to verify the applicability of the proposed system.

  • PDF

Analyzing the Cost Variances by the Changes of Grades in the Long-life Housing Certification System (장수명주택 인증등급 변화에 따른 공사비 변동 분석)

  • Song, Sang-Hoon;Park, Ji-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.222-223
    • /
    • 2019
  • Many attention have been paid to the innovative technologies aiming at the paradigm shift such as the modular housing, pre-fabrication method, or long-life housing. Despite the government's efforts to diffuse the long-life housing, few case gained the high grades by applying various technologies required in the Long-life Housing Certification System. The concerns of cost increase and low profit are the main reason why most of the construction firms avoid the adoption of long-life housing. In this study, the variations of construction costs were analyzed according to the grades in the Long-life Housing Certification System. The results of this study will help the decision makers find the optimal solution in employing the long-life housing technologies during planning.

  • PDF

Design of Multi-Regional Water Supply System Based on the Optimization Technique (최적화 기법을 이용한 광역상수도 관로시스템 설계)

  • Kim, Ju Hwan;Kim, Zong Woo;Park, Jae Hong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.13 no.1
    • /
    • pp.95-112
    • /
    • 1999
  • In this research, it is proposed that optimization method is introduced and applied to the design of pipeline system in multi-regional water supply project, which has been constructed to settle the regional unbalance problems of available water resources. For the purpose, interface programs are developed to integrate linear programming model and KYPIPE model which is used for optimization and hydraulic analysis, respectively. The developed program is applied to the pipeline system design of multi-regional water supply project. The optimal diameters from the application of linear programming technique are compared with those from conventional method that is time-consuming and tedious trail and error process. Since the conventional design largely depends upon the experience of designers and the results of general hydraulic analysis, it can not be reasonable and consistent. The application of linear programming technique can make it possible to design pipeline system optimally by using same design factors of general hydraulic models. The model can select commercial discrete pipe diameter as optimal size by using pipe length as decision variables. The developed model is applied to Pohang multi-regional water supply system design with two different objective functions, which are initial construction cost and annual cost including electric cost. As results, it is calculated that the initial construction cost of 1,449,740 thousand won is saved and annual cost of 128,951 thousand won is saved for a year within study year. Also, the optimal site of pump station is selected on 5th pipe, which is located between the diverging junction to Kangdong(2) province and the diverging junction to Cheonbuk province. It is explained that pump cost is less than pipe cost in this application case study due to little pump station scale. In the case of water supply with large pump capacity, it is reasonal that the increase of pipe size is more efficient instead the increase of pump station capacity to save annual cost.

  • PDF

Development of Construction Cost Estimation Model for Elementary, Middle and High School Facilities (초·중·고등학교 시설물별 추정공사비 산정모델 개발)

  • Jung, Eui-Hyun;Yeom, Dong-Jun;Kim, Jun-Sang;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.69-78
    • /
    • 2021
  • Estimated construction cost is an important index to secure an optimal budget which needs to go into construction projects in the previous of basic design phase. In order for public institutions to calculate the estimated construction cost, the cost per unit area of public buildings is used. However, the current calculation method of the estimated construction cost in public buildings is impossible to reflect the characteristics of many facilities and combinations. The purpose of this study is to develop an estimation model in the previous of basic design phase for the elementary, middle and high school facilities. it is expected that it is possible to estimate the construction cost of the elementary, middle and high schools in a reasonable and reliable manner through the estimation model developed in this study.

BIM-BASED TIME SERIES COST MODEL FOR BUILDING PROJECTS: FOCUSING ON MATERIAL PRICES

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.1-6
    • /
    • 2011
  • As large-scale building projects have recently increased for the residential, commercial and office facilities, construction costs for these projects have become a matter of great concern, due to their significant construction cost implications, as well as unpredictable market conditions and fluctuations in the rate of inflation during the projects' long-term construction periods. In particular, recent volatile fluctuations of construction material prices fueled such problems as cost forecasting. This research develops a time series model using the Box-Jenkins approach and material price time series data in Korea in order to forecast trends in the unit prices of required materials. Building information modeling (BIM) approaches are also used to analyze injection times of construction resources and to conduct quantity take-off so that total material prices can be forecast. To determine an optimal time series model for forecasting price trends, comparative analysis of predictability of tentative autoregressive integrated moving average (ARIMA) models is conducted. The proposed BIM-based time series forecasting model can help to deal with sudden changes in economic conditions by estimating material prices that correspond to resource injection times.

  • PDF

Computational Approach for the Trade-Off Study between the Total Cost and the Member Connections in Steel Frames (강 뼈대구조물의 총 경비와 부재연결과의 상반관계에 관한 연구)

  • Choi, Byoung Han;Lim, Jung Hwan
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.1
    • /
    • pp.15-27
    • /
    • 2007
  • Over the past decade, labor costs have increased relative to the cost of material hardware according to analysts in the construction industry. Therefore, the minimum weight design, which has been widely adopted in the literature for the optimal design of steel structures, is no longer the most economical construction approach. Presently, although connection- related costs is crucial in determining the most cost-effective steel structures, most studies on this subject focused on minimum-weight design or engaged in higher analysis. Therefore, in this study, we proposed a fabrication scheme for the most cost-effective moment-resisting steel frame structures that resist lateral loads without compromising overall stability. The proposed approach considers the cost of steel products, fabrication, and connections within the design process. The optimal design considered construction realities, with the optimal trade-off between the number of moment connections and total cost was achieved by reducing the number of moment connections and rearranging them using the combination of analysis that includes shear, displacement and interaction value based on the LRFD code and optimization scheme based on genetic algorithms. In this study, we have shown the applicability and efficiency in the examples that considered actual loading conditions.

Optimal Design of Breakwater Caisson Considering Expected Total Construction Cost and Allowable Sliding Distance (기대 총 건설비 및 허용 활동량을 고려한 방파제 케이슨의 최적설계)

  • Kim Kyung-Suk;Suh Kyung-Duck
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.17 no.4
    • /
    • pp.280-293
    • /
    • 2005
  • In this study, a model to calculate the expected total construction cost has been developed by combining a model to calculate the sliding distance of a caisson of a vertical breakwater and a model to calculate the rehabilitation cost of a caisson. The optimal cross-section of a caisson of a vertical breakwater is defined as the cross-section that requires a minimum expected total construction cost within the allowable limit of caisson sliding. Two allowable limits are considered: 0.1 m of the expected sliding distance during the lifetime of the breakwater and 0.1 of the probability that the cumulative sliding distance during the lifetime of the breakwater is greater than 0.3 m. A discount rate has also been introduced to convert the future rehabilitation cost to the present value. The introduction of the discount rate reduces the expected total construction cost for the caissons designed for shorter return periods due to frequent rehabilitations. The present design method requires a smaller cross-section than the conventional deterministic method in shallow water depths, enabling us to design a caisson more economically. On the other hand, the above-mentioned allowable limits of caisson sliding show similar results for smaller water depths, while, for larger depths, the former requires a larger cross-section than the latter.

Mathematical Optimization Models for Determination of Optimal Vertical Alignment (종단선형설계 최적화 기법에 관한 연구)

  • 강성철;전경수;박영부
    • Journal of Korean Society of Transportation
    • /
    • v.12 no.3
    • /
    • pp.5-13
    • /
    • 1994
  • In the fields of rail and road design, most vertical alignment design have been thus far heavily dependent upon trial-and-errors of experienced engineers. However, it has long been inefficient in productivity of designing process. In order to overcome this inefficiency, this paper presents the optimal vertical alignment design method using mathematical optimization techniques. For optimization, mathematical model to minimize the construction cost is formulated and the separable programming technique and the Zoutendijk method are introduced to solve it. As result, it is shown that this optimization technique can give efficient solutions to all vertical alignment design fields with properly-estimated cost function.

  • PDF

Optimum Life Cycle Cost Design of Steel Box Girder Bridges (강상형교의 최적 Life Cycle Cost 설계)

  • 조효남;민대홍;김구선
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1998.10a
    • /
    • pp.151-158
    • /
    • 1998
  • This paper presents an optimal decision model for minimizing the life-cycle cost of steel box girder bridges. The point is that it takes into account service life process as a whole, and the life-cycle costs include initial (design, testing, and construction) costs, maintenance costs and expected failure costs. The problem is formulated as that of minimization of expected total life-cycle cost with respect to the design variables. The optimal solution identifies those values of the decision variables that result in minimum expected total cost. The performance constraints in the form of flexural failure and shear failure are those specified in the design code. Based on extensive numerical investigations, it may be positively stated that the optimum design of steel box girder bridges based on life-cycle cost approach proposed in this study provides a lot more rational and economical design, and thus the proposed approach will propose the development of new concepts and design methodologies that may have important implications in the next generation performance-based design codes and standards.

  • PDF