• 제목/요약/키워드: Optimal construction cost

검색결과 368건 처리시간 0.025초

대형공공공사에 J/V(Joint Venture)시스템의 합리적 도입을 통한 건설사업 효율화 전략 (A Strategy of Construction through Rationally Adapting JV(Joint Venture) in Large Public Constructions)

  • 이태식;김용천;박동찬;선우강;김열규
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 춘계학술대회 논문집
    • /
    • pp.24-29
    • /
    • 2001
  • Despite of the introduction some sorts of the contract and the bid method like CM(Construction management) that will be efficient to manage the construction project. Korean agencies limit to control project management to do large public constructions. In the case of Taiwan, THSRC is apply J/V system in the public construction project, they are accomplishing that expend optimal the cost and save the construction time. To success J/V it has two factors, one is risk management and another is sharing information of construction project. Therefore, we will study to introduce J/V system to our construction project.

  • PDF

8-Bay 주차모듈을 적용한 아파트 지하주차장 구조의 경제성 분석 (The Economic Analysis of Underground Parking Lot Frames adopting 8-Bay Parking Modules)

  • 유용신;윤보형;김민수;김태완;이찬식
    • 한국건설관리학회논문집
    • /
    • 제20권1호
    • /
    • pp.52-61
    • /
    • 2019
  • 2017년 6월 30일 국토교통부는 주차단위구획의 최소 크기를 확대하는 것을 입법 예고하였다. 주차단위구획의 확대는 주차장 연면적의 증가를 초래하여 아파트 분양가를 상승시킬 우려가 있다. 그러므로 주차장의 기둥 간격과 개수를 조정하고, 주차효율이 좋은 8-Bay 장스팬 주차모듈을 적용할 필요가 있다. 연구결과, 주차단위구획을 확대한 6-Bay 주차모듈과 8-Bay 주차모듈의 공사비는 거의 비슷한 수준이었으나, 8-Bay 주차모듈의 연면적 감소 효과가 확인되어 8-Bay 주차모듈이 더 경제적인 것으로 나타났다. 8-Bay 주차모듈의 공사비를 분석한 결과, 탈형데크플레이트 RC공법을 적용한 모듈이 가장 경제성이 있는 것으로 나타났다. PC 복합화공법은 부재의 체적 증가로 인해 비교적 공사비가 높게 나타났으나, 프리스트레스를 적용하여 보 춤을 감소시키면 경제성을 확보할 수 있을 것으로 확인되었다. 또한 중공슬래브 공법 모듈은 가장 공사비가 높게 나타났으나, $1m^2$당 공사비가 가장 낮아 비용적 측면에서 아파트 주차장의 구조공법으로 적용 가능성을 확인하였다. 이 연구는 8-Bay 주차모듈의 공사비를 분석하고 비용적 측면에서 경제성을 확인하였다는 점에서 의의를 가지며, 향후에 8-Bay 주차모듈을 적용한 최적의 공법을 도출하는데 기초자료로 활용될 것으로 기대된다.

동적계획법을 이용한 유수체계의 최적설계 (Optimal Design of Datention System using Incremental Dynamic Programming)

  • 이길성;이범희
    • 물과 미래
    • /
    • 제28권1호
    • /
    • pp.153-168
    • /
    • 1995
  • 본 연구의 목적은 다지점 유수체계의 최소비용 설계를 위한 효율적 모형을 개발하려는 것이며,로서 제안된 IDP 모형은 수문-수리학적 모형(강우-유출모형과 유역 및 하도 공수추적모형)과 최적화모형 등 2개의 부모형을 포함하고 있다. 목적함수는 대지구입비용과 유수지 설치비용 및 펌핑 시스템의 설치비용의 합으로 구성되며, 모형의 입력자료로는 각 하도자료와 수문 매개변수 및 설계강우와 비용함수등이 제시되어야 한다. 본 모형은 다지형 하도의 유수체계를 포함하고 있는 서울의 중랑천 유역에 적용되었으며, 모형의 적용결과 여러 조건의 변화에 대해서도 합리적인 유수체계의 설계가 가능하며, 다지점 유수체계의 설계에 대한 적용이 가능함을 보여주고 있다.

  • PDF

건설현장 철근작업 프로세스상의 적정 자재재고 관리 방안에 관한 연구 (Optimal Inventory Management for Rebar Fabrication Process in Construction Process)

  • 정도영;박상혁;곽수남;김형관;한승헌
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.702-707
    • /
    • 2006
  • 건설자재의 경우 물량 확보 차원과 소량 반입의 어려움, 공정 지연 등의 이유로 인하여 현장에 상당량의 재고를 보유하여 왔다. 특히 철근의 경우 변동요인이 많아 일반적으로 1개월 이상의 여유 재고를 보유하여 왔다. 하지만 이렇게 재고의 규모가 필요이상으로 과도할 경우 재고유지비용이 증가하게 되고 자재적치에 많은 공간이 소요되어 현장 내 이동에 불편을 겪을 수도 있으며 생산성이 저하 되어 낭비요인으로 작용하게 된다. 반면에 재고량이 부족할 경우에는 예상치 못했던 수요가 발생하거나 자재수급에 어려움이 생기는 경우 대응하기가 어려우며 자재부족에 따라 작업수행에 지연을 가져오게 되어 추가비용을 발생시킨다. 본 연구는 건설현장의 여러 가지 자재 중에서 구성 비율이 가장 높고 지속적인 수요에 의해 작업이 이루어지는 철근자재를 대상으로 재고관리 현황을 살펴보고 적정 재고관리 방안을 제시하였다. 먼저 일반적인 재고의 개념 및 재고관리 시스템에 대하여 살펴보고 철근 가공 ${\cdot}$ 조립과정의 적용성 여부를 판단하였다. 이후 자재의 리드타임 변이와 리드타임 동안의 자재의 수요율 변이를 고려하여 자재의 재주문 시점을 언제로 할 것인지를 결정하고 주문비용 및 재고유지비용, 자재 수요량을 고려하여 주문량을 얼마로 할 것인지를 결정하는 방법을 제시하였다.

  • PDF

교량의 생애주기비용 분석을 위한 비용함수 모델 및 시스템 개발 (Development of System and Cost Function Model for Life Cycle Cost Analysis of Bridge)

  • 박미연;선종완;엄인수;조효남
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.704-711
    • /
    • 2005
  • Recently Life Cycle Cost Analysis for civil infrastructures such as pavements, bridges, and dams has been emphasized However, so far, there are few systems available for life cycle cost analysis of bridges at design stage. Therefore, the objective of this paper is to develop a user-friendly life-cycle cost analysis system for LCC-effective optimal design decision making at design stage. The program is based on the proposed LCC model, formulation, analysis modules and systematic procedure that suit Korean construction conditions. It is expected that the developed system can be effectively utilized for more LCC-effective design of bridges. It is applied to an actual bridge design project in order to demonstrate its effectiveness and applicability.

  • PDF

물리적 통신망의 이중연결성을 위한 확장 문제에 관한 연구

  • 이희상;안광모
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1996년도 춘계공동학술대회논문집; 공군사관학교, 청주; 26-27 Apr. 1996
    • /
    • pp.83-86
    • /
    • 1996
  • In this paper we study the problem of augmenting a physical network to improve the topology for new survivable network architectures. We are given a graph G=(V,E,F), where V is a set of nodes that represents transmission systems which be interconnected by physical links, and E is a collection of edges that represent the possible pairs of nodes between which a direct transmission link can be placed. F, a subset of E is defined as a set of the existing direct links, and E/F is defined as a set of edges for the possible new connection. The cost of establishing network $N_{H}$=(V,H,F) is defined by the sum of the costs of the individual links contained in new link set H. We call that $N_{H}$=(V,H,F) is feasible if certain connectivity constrints can be satisfied in $N_{H}$=(V,H,F). The computational goal for the suggested model is to find a minimum cost network among the feasible solutions. For a k edge (node) connected component S .subeq. F, we charactrize some optimality conditions with respect to S. By this characterization we can find part of the network that formed by only F-edges. We do not need to augment E/F edges for these components in an optimal solution. Hence we shrink the related component into a node. We study some good primal heuristics by considering construction and exchange ideas. For the construction heuristics, we use some greedy methods and relaxation methods. For the improvement heuristics we generalize known exchange heuristics such as two-optimal cycle, three-optimal cycle, pretzel, quezel and one-optimal heuristics. Some computational experiments show that our heuristic is more efficient than some well known heuristics.stics.

  • PDF

최적화 기법을 이용한 요트 계류장 입지분석에 관한 연구 (The study On An Yacht Moorings Establishment Location Analysis Using Optimum Spiral Method)

  • 박성현;주기세
    • 해양환경안전학회지
    • /
    • 제17권4호
    • /
    • pp.323-329
    • /
    • 2011
  • 본 연구는 최대의 효과를 달성하기 위하여 정수 계획법을 이용하여 주어진 자연조건하에서 여러 대안 후보 입지 중 최적의 요트 계류장을 결정 하기위한 문제이다. 목포시 인근의 4개의 요트 계류장 후보지 중 최적의 후보지를 선정하기 위하여 21개의 요소들이 각각의 후보지들에 대하여 분석된다. 총 21개 요소들 중 개발 기간과 초기 투자비용은 다음 요소들에 비해서 1.5배의 가중치를 갖는다. 가중치 선형모델 분석 결과 네 곳의 후보지중 평화광장 수역이 가장 합리적인 장소로 선정되었다. 본 논문에서 소개된 모델은 지금까지 요트 계류장 선정 시 적용된 적이 없는 새로운 방법이다. 본 논문은 가장 합리적인 위치를 결정하는데 공헌할 뿐만 아니라 마리나 관련된 다른 분야에도 응용 적용가능하다.

건설 산업용 판유리 운반을 위한 랙 설계 (Designing Racks for Transporting Flat Glass Products in a Construction Industry)

  • 권경진;홍순도;김갑환
    • 대한산업공학회지
    • /
    • 제42권4호
    • /
    • pp.270-279
    • /
    • 2016
  • A glass product manufacturing company transports a large number of flat glass products from a manufacturing firm to a building construction site. The products are transported using specially designed racks, which assure fewer glass breakages during the deliveries. This study determines the sizes of the racks which minimize the total logistics cost including costs for rack purchasing, handling, transportation, and inventory costs. The determination of the rack size should consider tradeoff relationships between the amount of glasses piled in a rack and the number of racks loaded on a truck, and affects the required number of racks and the truck operational cost. A truck loading algorithm is proposed to maximize a high truck utilization, and an enumeration method is proposed to determine the optimal combination of rack sizes considering the total logistics cost. The numerical example is solved by using a real data.

Optimization for trapezoidal combined footings: Optimal design

  • Arnulfo Lueanos-Rojas
    • Advances in concrete construction
    • /
    • 제16권1호
    • /
    • pp.21-34
    • /
    • 2023
  • This work presents a complete optimal model for trapezoidal combined footings that support a concentric load and moments around of the "X" and "Y" axes in each column to obtain the minimum area and the minimum cost. The model presented in this article considers a pressure diagram that has a linear variation (real pressure) and the equations are not limited to some cases. The classic model takes into account a concentric load and the moment around of the "X" axis (transverse axis) that is applied due to each column, i.e., the resultant force is located at the geometric center of the footing on the "Y" axis (longitudinal axis), and when the concentric load and moments around of the "X" and "Y" axes act on the footing is considered the uniform pressure applied on the contact surface of the footing, and it is the maximum pressure. Four numerical problems are presented to find the optimal design of a trapezoidal combined footing under a concentric load and moments around of the "X" and "Y" axes due to the columns: Case 1 not limited in the direction of the Y axis; Case 2 limited in the direction of the Y axis in column 1; Case 3 limited in the direction of the Y axis in column 2; Case 4 limited in the direction of the Y axis in columns 1 an 2. The complete optimal design in terms of cost optimization for the trapezoidal combined footings can be used for the rectangular combined footings considering the uniform width of the footing in the transversal direction, and also for different reinforced concrete design codes, simply by modifying the resisting capacity equations for moment, for bending shear, and for the punching shear, according to each of the codes.

최적 토량배분 계획을 위한 의사결정 모델 (Decision Making Model for Optimal Earthwork Allocation Planning)

  • 곽한성;서병욱;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.162-163
    • /
    • 2016
  • This paper presents a mathematical model for optimizing earthwork allocation plan that minimizes earthwork cost. The model takes into account operational constraints in the real-world earthwork such as material-type (i.e., quality level of material) and quantities excavated from cut-sections, required quality of material and quantities for each embankment layer, top-down cutting and bottom-up filling constraints, and allocation orders. These constraints are successfully handled by assuming the rock-earth material as the three dimensional (3D) blocks. The study is of value to project scheduler because the model identifies the optimal earth allocation plan (i.e., haul direction (cut and fill pairs), quantities of soil, type of material, and order of allocations) expeditiously and is developed as an automated system for usability. It is also relevant to estimator in that it computes more realistic earthworks costs estimation. The economic impact and validity of the mathematical model was confirmed by performing test cases.

  • PDF