• Title/Summary/Keyword: Optimal Requirement

Search Result 436, Processing Time 0.035 seconds

Optimization for Relay-Assisted Broadband Power Line Communication Systems with QoS Requirements Under Time-varying Channel Conditions

  • Wu, Xiaolin;Zhu, Bin;Wang, Yang;Rong, Yue
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.11 no.10
    • /
    • pp.4865-4886
    • /
    • 2017
  • The user experience of practical indoor power line communication (PLC) applications is greatly affected by the system quality-of-service (QoS) criteria. With a general broadcast-and-multi-access (BMA) relay scheme, in this work we investigate the joint source and relay power optimization of the amplify-and-forward (AF) relay systems used under indoor broad-band PLC environments. To achieve both time diversity and spatial diversity from the relay-involved PLC channel, which is time-varying in nature, the source node has been configured to transmit an identical message twice in the first and second signalling phase, respectively. The QoS constrained power allocation problem is not convex, which makes the global optimal solution is computationally intractable. To solve this problem, an alternating optimization (AO) method has been adopted and decomposes this problem into three convex/quasi-convex sub-problems. Simulation results show the fast convergence and short delay of the proposed algorithm under realistic relay-involved PLC channels. Compared with the two-hop and broadcast-and-forward (BF) relay systems, the proposed general relay system meets the same QoS requirement with less network power assumption.

An analysis of bolted opening structure and development of analysis expert system using ANSYS (원자력 주기기용 볼트 개폐구조물의 해석과 ANSYS를 이용한 전용 해석 프로그램의 개발)

  • Jeon, Seong-Mun;Seo, Ui-Gwon;Sim, Hyeon-Bo;Kim, Tae-Hwan;Lee, Bu-Yun
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.22 no.4
    • /
    • pp.731-742
    • /
    • 1998
  • Bolted opening structures is widely applied for class 1 machinery of nuclear plant with strict design requirement. As the shape of the bolted opening structure is non-axisymmetric due to the existence of stud bolts although it is almost axi-symmetric, 3D analysis is required to satisfy such kind of design requirements. Because as much as possible trial computations are need to get an optimal design condition in the limited period of basic design, an easy and fast analysis tool is useful in the design stage. In the paper, a transformation technique of non-axisymmetric problem into quasi-axisymmetric has been proposed based on the general purpose commercial code ANSYS. Both the pre-processor which incorporates the technique and prepares data and post-processor which prepares arranged results from the huge output of commercial code have been developed to help the design engineers.

Recovery of Lactic Acid from Fermentation Broth by the Two-Stage Process of Nanofiltration and Water-Splitting Electrodialysis

  • Lee, Eun-Gyo;Kang, Sang-Hyeon;Kim, Hyun-Han;Chang, Yong-Keun
    • Biotechnology and Bioprocess Engineering:BBE
    • /
    • v.11 no.4
    • /
    • pp.313-318
    • /
    • 2006
  • A two-stage process of nanofiltration and water-splitting electrodialysis was investigated for lactic acid recovery from fermentation broth. In this process, sodium lactate is isolated from fermentation broth in the first stage of nanofiltration by using an NTR-729HF membrane, and then is converted to lactic acid in the second stage by water-splitting electrodialysis. To determine the optimal operating conditions for nanofiltration, the effects of pressure, lactate concentration, pH, and known added impurities were studied. Lactate rejection was less than 5%, magnesium rejection approximated 45%, and calcium rejection was at 40%. In subsequent water-splitting electrodialysis, both the sodium lactate conversion to lactic acid and sodium hydroxide recovery, were about 95%, with a power requirement of $0.9{\sim}1.0\; kWh$ per kg of lactate.

A Single Feedback Based Interference Alignment for Three-User MIMO Interference Channels with Limited Feedback

  • Chae, Hyukjin;Kim, Kiyeon;Ran, Rong;Kim, Dong Ku
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.7 no.4
    • /
    • pp.692-710
    • /
    • 2013
  • Conventional interference alignment (IA) for a MIMO interference channel (IFC) requires global and perfect channel state information at transmitter (CSIT) to achieve the optimal degrees of freedom (DoF), which prohibits practical implementation. In order to alleviate the global CSIT requirement caused by the coupled relation among all of IA equations, we propose an IA scheme with a single feedback link of each receiver in a limited feedback environment for a three-user MIMO IFC. The main feature of the proposed scheme is that one of users takes out a fraction of its maximum number of data streams to decouple IA equations for three-user MIMO IFC, which results in a single link feedback structure at each receiver. While for the conventional IA each receiver has to feed back to all transmitters for transmitting the maximum number of data streams. With the assumption of a random codebook, we analyze the upper bound of the average throughput loss caused by quantized channel knowledge as a function of feedback bits. Analytic results show that the proposed scheme outperforms the conventional IA scheme in term of the feedback overhead and the sum rate as well.

Optimal Channel Modeling for Multicasting in VOD (VOD에서 멀티캐스팅을 위한 최적 채널 모델링)

  • Kim, Hyoung-Joong;Yeo, In-Kwon;Jitendra K. Manandhar
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.6 no.8
    • /
    • pp.623-628
    • /
    • 2000
  • Video-on-demand system in which users can request any video through the network at any time is made possible by rapid increase in network bandwidth and capacity of the media server. However true video-on-demand system cannot support all requests since bandwidth requirement is still too demanding. Therefore efficient bandwidth reduction algorithm is necessary. both the piggybacking method and the batching method are novel solutions that can provide more logical number of streams than the physical system can support. Of course each of them has its pros and cons. hence piggybacking with batching-by-size can take advantage of both the schemes. Some parameters such as the size of batch and the size of the catch-up window should be adjusted and order to maximize the bandwidth reduction for piggybacking with batching-by-size method. One of the most important parameters is decided optimally in this paper. Simulation shows that the optimized parameter can achieve considerable reductionand consequently remarkable enhancement in performance.

  • PDF

A Low-Power Portable ECG Touch Sensor with Two Dry Metal Contact Electrodes

  • Yan, Long;Yoo, Hoi-Jun
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.10 no.4
    • /
    • pp.300-308
    • /
    • 2010
  • This paper describes the development of a low-power electrocardiogram (ECG) touch sensor intended for the use with two dry metal electrodes. An equivalent ECG extraction circuit model encountered in a ground-free two-electrode configuration is investigated for an optimal sensor read-out circuit design criteria. From the equivalent circuit model, (1) maximum sensor resolution is derived based on the electrode's background thermal noise, which originates from high electrode-skin contact impedance, together with the input referred noise of instrumentation amplifier (IA), (2) 60 Hz electrostatic coupling from mains and motion artifact are also considered to determine minimum requirement of common mode rejection ratio (CMRR) and input impedance of IA. A dedicated ECG read-out front end incorporating chopping scheme is introduced to provide an input referred circuit noise of 1.3 ${\mu}V_{rms}$ over 0.5 Hz ~ 200 Hz, CMRR of IA > 100 dB, sensor resolution of 7 bits, and dissipating only 36 ${\mu}W$. Together with 8 bits synchronous successive approximation register (SAR) ADC, the sensor IC chip is implemented in 0.18 ${\mu}m$ CMOS technology and integrated on a 5 cm $\times$ 8 cm PCB with two copper patterned electrodes. With the help of proposed touch sensor, ECG signal containing QRS complex and P, T waves are successfully extracted by simply touching the electrodes with two thumbs.

Available Transfer Capability Enhancement with FACTS Devices in the Deregulated Electricity Market

  • Manikandan, B.V.;Raja, S. Charles;Venkatesh, P.
    • Journal of Electrical Engineering and Technology
    • /
    • v.6 no.1
    • /
    • pp.14-24
    • /
    • 2011
  • In order to facilitate the electricity market operation and trade in the restructured environment, ample transmission capability should be provided to satisfy the demand of increasing power transactions. The conflict of this requirement and the restrictions on the transmission expansion in the restructured electricity market has motivated the development of methodologies to enhance the available transfer capability (ATC) of existing transmission grids. The insertion of flexible AC transmission System (FACTS) devices in electrical systems seems to be a promising strategy to enhance single area ATC and multi-area ATC. In this paper, the viability and technical merits of boosting single area ATC and multi-area ATC using Thyristor controlled series compensator (TCSC), static VAR compensator (SVC) and unified power flow controller (UPFC) in single device and multi-type three similar and different device combinations are analyzed. Particle swarm optimization (PSO) algorithm is employed to obtain the optimal settings of FACTS devices. The installation cost is also calculated. The study has been carried out on IEEE 30 bus and IEEE 118 bus systems for the selected bilateral, multilateral and area wise transactions.

Investment Scheduling of Maximizing Net Present Value of Dividend with Reinvestment Allowed

  • Sung, Chang-Sup;Song, Joo-Hyung;Yang, Woo-Suk
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.05a
    • /
    • pp.506-516
    • /
    • 2005
  • This paper deals with an investment scheduling problem of maximizing net present value of dividend with reinvestment allowed, where each investment has certain capital requirement and generates deterministic profit. Such deterministic profit is calculated at completion of each investment and then allocated into two parts, including dividend and reinvestment, at each predetermined reinvestment time point. The objective is to make optimal scheduling of investments over a fixed planning horizon which maximizes total sum of the net present values of dividends subject to investment precedence relations and capital limit but with reinvestment allowed. In the analysis, the scheduling problem is transformed to a kind of parallel machine scheduling problem and formulated as an integer programming which is proven to be NP-complete. Thereupon, a depth-first branch-and-bound algorithm is derived. To test the effectiveness and efficiency of the derived algorithm, computational experiments are performed with some numerical instances. The experimental results show that the algorithm solves the problem relatively faster than the commercial software package (CPLEX 8.1), and optimally solves the instances with up to 30 investments within a reasonable time limit.

  • PDF

Maximum Power Tracking Control for parallel-operated DFIG Based on Fuzzy-PID Controller

  • Gao, Yang;Ai, Qian
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.6
    • /
    • pp.2268-2277
    • /
    • 2017
  • As constantly increasing wind power penetrates power grid, wind power plants (WPPs) are exerting a direct influence on the traditional power system. Most of WPPs are using variable speed constant frequency (VSCF) wind turbines equipped with doubly fed induction generators (DFIGs) due to their high efficiency over other wind turbine generators (WTGs). Therefore, the analysis of DFIG has attracted considerable attention. Precisely measuring optimum reference speed is basis of utilized maximum wind power in electric power generation. If the measurement of wind speed can be easily taken, the reference of rotation speed can be easily calculated by known system's parameters. However, considering the varying wind speed at different locations of blade, the turbulence and tower shadow also increase the difficulty of its measurement. The aim of this study is to design fuzzy controllers to replace the wind speedometer to track the optimum generator speed based on the errors of generator output power and rotation speed in varying wind speed. Besides, this paper proposes the fuzzy adaptive PID control to replace traditional PID control under rated wind speed in variable-pitch wind turbine, which can detect and analyze important aspects, such as unforeseeable conditions, parameters delay and interference in the control process, and conducts online optimal adjustment of PID parameters to fulfill the requirement of variable pitch control system.

Design and Manufacture of CPW-fed Two Arc-shaped Antenna for WLAN Applications (WLAN 시스템을 위한 두 개 원호 형태 안테나의 설계와 제작)

  • Yoon, Joong-Han
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.19 no.4
    • /
    • pp.765-771
    • /
    • 2015
  • In this paper, a dual-band arc-shaped monopole antenna for WLAN(Wireless Local Area Networks) applications. The proposed antenna is based on CPW-fed structure, and composed of two-arc shaped of radiating patch and ground plane. To obtain the optimized parameters, we used the simulator, Ansoft's High Frequency Structure Simulator (HFSS) and found the parameters that greatly effect antenna characteristics. Using optimal parameters, the antenna is fabricated. The numerical and experiment results demonstrated that the propnosed antenna satisfied the -10 dB impedance bandwidth requirement while simultaneously covering the WLAN bands. And measured results of gain and radiation patterns characteristics displayed determined for opeating bands.