• 제목/요약/키워드: Optimal Operation

검색결과 2,809건 처리시간 0.027초

분할법을 이용한 최적 무효전력 설비계획 (Optimal Reactive Power Planning Using Decomposition Method)

  • 김정부;정동원;김건중;박영문
    • 대한전기학회논문지
    • /
    • 제38권8호
    • /
    • pp.585-592
    • /
    • 1989
  • This paper presents an efficient algorithm for the reactive planning of transmission network under normal operating conditions. The optimal operation of a power system is a prerequisite to obtain the optimal investment planning. The operation problem is decomposed into a P-optimization module and a Q-optimization module, but both modules use the same objective function of generation cost. In the investment problem, a new variable decomposition technique is adopted which can operate the operation and the investment variables. The optimization problem is solved by using the gradient projection method (GPM).

  • PDF

고분자 전해질 연료전지 발전 시스템의 병렬 운전을 위한 PCS 전력 분배 구동 알고리즘 (A PCS Power-sharing Operation Algorithm for Parallel Operation of Polymer Electrolyte Membrane Fuel Cell (PEMFC) Generation Systems)

  • 강현수
    • 전기학회논문지
    • /
    • 제58권9호
    • /
    • pp.1706-1713
    • /
    • 2009
  • In this paper, a parallel operation algorithm for high power PEMFC generation systems is proposed. According to increasing the capacity of fuel cell systems with several fuel cell stacks, the different dynamic characteristics of each fuel cell stack effect on imbalance of load sharing and current distribution, so that a robust parallel operation algorithm is desired. Therefore, a power-sharing technique is developed and explained in order to design an optimal distributed PEMFC generation system. In addition, an optimal controller design procedure for the proposed parallel operation algorithm is introduced, along with informative simulations and experimental results.

Goal Programming을 이용한 홍수기 저수지 최적 운영 (Optimal Reservoir Operation Using Goal Programming for Flood Season)

  • 김혜진;안재황;최창원;이재응
    • 한국방재학회 논문집
    • /
    • 제11권2호
    • /
    • pp.147-156
    • /
    • 2011
  • 홍수기 다목적댐 운영의 목적은 홍수조절용량을 최대한 이용하여 하류 주요 지점의 첨두홍수량을 저감시키거나, 계획홍수량을 초과하지 않도록 방류량과 방류시점을 조절함으로써 홍수피해규모를 최소화하는 것이다. 따라서 홍수기 다목적댐 운영에 있어 가장 중요한 것은 최적의 방류시점과 방류량의 결정이며 이를 통해 홍수기말 이수용량을 최대로 확보 하는 점이다. 본 연구에서는 다목적 최적화기법의 하나인 goal programming을 이용하여 홍수기 저수지 최적운영을 실시하였다. goal programming은 선형계획법 또는 비선형계획법을 이용하여 두 개 이상의 목적을 가진 문제의 최적 대안을 구하기 위해, 목표값으로부터의 편차의 합을 최소화하여 최적화하는 기법이다. 홍수기 다목적댐 운영에서 goal programming의 적용성을 검토하기 위해 실제 홍수 사상을 이용하여, 단일저수지 운영과 저수지 연계운영을 실시하였다. 단일저수지 운영을 적용하기 위한 시험유역으로는 충주댐 유역을 선정하였고 저수지 연계운영을 적용하기 위한 시험유역으로는 안동댐과 임하댐 유역을 선정하였다. goal programming의 결과 분석을 위해 저수지 모의운영 모형인 HEC-5 모형의 결과와 비교, 분석하였다. 검토 결과 goal programming을 이용할 경우 홍수기 말에 저수지 수위를 홍수기제한수위로 유지할 수 있었으며 주요 지점의 홍수량을 매 시간 적절히 계획홍수량 아래로 유지할 수 있었다. goal programming을 이용한 최적 운영의 경우 전 구간의 유입량을 알고 있다고 가정한 점에서 실제 저수지 운영과는 차이가 있으나, 적절한 제약조건을 적용하고 홍수예경보를 이용하여 예보된 유입량을 활용하면 최적의 방류량 시점과 방류량을 산정하여 홍수기 다목적댐을 효율적으로 운영할 수 있으며 주요 지점의 홍수량도 저감할 수 있을 것으로 판단된다.

가변 열전비를 갖는 열병합 발전설비가 포함된 마이크로그리드의 최적 운용 (Optimal Microgrid Operation Considering Combined Heat and Power Generation with Variable Heat and Electric Ratio)

  • 이지혜;박재세
    • 전기학회논문지
    • /
    • 제61권10호
    • /
    • pp.1548-1553
    • /
    • 2012
  • The important requirement for microgrid operation is to meet the balance between supply and demand. To meet, Combined Heat and Power (CHP) generation should be considered in microgrid scheduling. CHP generation is economical on the side of a consumer because it products heat and power. Therefore, it is high efficient. This paper presents a mathematical model for optimal microgrid operation including CHP generation using the optimal ratio of heat and power due to demand. The objective function and constraints are modeled by linear program (LP). Through the case study, the validation of the proposed model is shown.

회분식 증류장치의 최적 제어 (Optimal control of batch distillation)

  • 이주엽;정상헌;이광순
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1992년도 한국자동제어학술회의논문집(국내학술편); KOEX, Seoul; 19-21 Oct. 1992
    • /
    • pp.941-946
    • /
    • 1992
  • Three different reflux policies are compared for a batch distillation process in which a fixed recovery with a given average purity of the distillate is required ; the first, for the constant distillate purity ; the second, for the constant reflux ratio ; finally, for the optimal reflux policy which gives the minimum operation time. The optimal reflux policy was obtained using pontryagin's maximum principle. Througy the numerical simulations for the three different binary mixtures, it was found that the time advantage of the optimal reflux operation over the constant overhead composition operation varies form 10.0 to 22.4% and the advantage over the constant reflux operation varies from 1106 to 36.6% in the three cases considered.

  • PDF

퍼지선형계획법을 이용한 열병합발전시스템의 최적운전계획수립 (Optimal Operation Scheduling of Cogeneration Systems Using Fuzzy Linear Programming Method)

  • 이종범;정장호;류승현
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1995년도 하계학술대회 논문집 B
    • /
    • pp.516-518
    • /
    • 1995
  • This paper presents the optimal short-term operation scheduling by using fuzzy linear programming method on cogeneration systems connected with auxiliary equipments. Simulation is performed in case of the bottomming cycle. Modeling of cogeneration systems and auxiliary equipments is done, the effectiveness of modeling is evaluated through the detailed simulation. After the optimal operation scheduling is established by using linear programming method, the last optimal operation scheduling is established by using fuzzy linear programming method. The results of simulation show the auxiliary equipments can be effeciently operated in case of the bottomming cycle by modeling proposed in this paper.

  • PDF

Optimal Operation for Reverse Supply Chain Incorporating Inspection Policy into Remanufacturing of Used Products

  • Yamaguchi, Shin;Kusukawa, Etsuko
    • Industrial Engineering and Management Systems
    • /
    • 제16권1호
    • /
    • pp.1-21
    • /
    • 2017
  • This paper discusses a reverse supply chain (RSC) which consists of the process flows from procurement of used products collected from a market, through remanufacturing products from the used products, to sales of the products in a market. In general, it is conceivable for the RSC to face the uncertainty in quality of used products collected from a market. Inspection is one of efficient methods to deal with the problem regarding quality of used products. However, there is a trade-off between inspection cost and inspection accuracy. This paper focuses on the following five types of inspection: (1) 100% inspection, (2) sampling inspection, (3) sampling inspection with screening of rejected lots, (4) sampling inspection with screening of acceptable lots, and (5) no inspection, and determines the optimal operation consisting of the optimal number of procured used products and the optimal inspection policy. Numerical analysis clarifies not only how changes of conditions of the RSC affect the manufacturer's optimal operation but also features of each inspection type. In addition, from the results of numerical analysis, this paper shows the usability to add the proposed inspection in this paper, the sampling inspection with screening of acceptable lots, to choices of inspection type.

국가적 관점에서 각 용도별 ESS 적정용량 산정을 위한 투자수리모델 수립에 관한 연구 (Study on Establishing Investment Mathematical Models for Each Application ESS Optimal Capacity in Nationwide Perspective)

  • 김정훈;윤석민
    • 전기학회논문지
    • /
    • 제65권6호
    • /
    • pp.979-986
    • /
    • 2016
  • At present, electric power industry around the world are being gradually changed to a new paradigm, such as electrical energy storage system, the wireless power transmission. Demand for ESS, the core technology of the new paradigm, has been growing worldwide. However, it is essential to estimate the optimal capacity of ESS facilities for frequency regulation because the benefit would be saturated in accordance with the investment moment and the increase of total invested capacity of ESS facilities. Hence, in this paper, the annual optimal mathematical investment model is proposed to estimate the optimal capacity and to establish investment plan of ESS facility for frequency regulation. The optimal mathematical investment model is newly established for each season, because the construction period is short and the operation effect for the load by seasons is different unlike previous the mathematical investment model. Additionally, the marginal operating cost is found by new mathematical operation model considering no-load cost and start-up cost as step functions improving the previous mathematical operation model. ESS optimal capacity is established by use value in use iterative methods. In this case, ESS facilities cost is used in terms of the value of the beginning of the year.

에너지절감을 위한 물 재이용 펌프시스템의 최적운전 제어 (Optimal Operation Control for Energy Saving in Water Reuse Pumping System)

  • 부창진;김호찬
    • 한국산학기술학회논문지
    • /
    • 제13권5호
    • /
    • pp.2414-2419
    • /
    • 2012
  • 본 논문에서는 물 재이용 펌프 시스템의 에너지 효율적 운전 방법을 제안한다. 1시간 단위의 시간대에서 최적운전제어를 위해 예측구간 스위칭방법과 선형계획법을 적용하고 에너지 비용은 경부하, 중부하, 그리고 최대부하를 포함한 TOU 요금과 피크요금을 통해 산정하도록 한다. 물 재이용 펌프시스템에서의 최적운전은 TOU 요금과 피크요금을 포함한 에너지 비용을 최대로 줄일 수 있도록 수행한다. 시뮬레이션을 통해 제안한 최적운전방법을 적용하면 많은 전력 에너지 비용의 절감과 전력계통의 안정성 향상을 확인할 수 있다.

선형추적에 의한 한강수계 복합 저수지 계통의 이수 조작기준 작성 (Development of Han River Multi-Reservoir Operation Rules by Linear Tracking)

  • 유주환
    • 한국수자원학회논문집
    • /
    • 제33권6호
    • /
    • pp.733-744
    • /
    • 2000
  • 불확실한 저수지 유입량과 수요량 때문에 최적의 저수지 조작기준은 정량화하기 쉽지 않다. 그렇지만 저수지 조작에 일정 수요를 충족시키면서 모의 발생시킨 유입량 시계열을 반영함으로써 음해 추계적 최적화 접근법을 이용하면 조작기준은 작성 가능하다. 이에 본 연구에서는 한강수계 7개 저수지 계통에 적절하도록 수력발전 최대화를 선형추적으로 모형화하고 최적제어를 이용하여 최적조작을 수행하였다. 이 때 2001년 수도권 용수수요를 만족시키도록 한 최적 조작 모형에는 다지점 마코브 모형에 의해 모의 발생된 유입량 자료가 입력된다. 그리고 최적 결과에 대하여 회구 분석과 통계 분석을 수행하여 월별 조작기준을 작성하고 계절별 저수위별 확률을 제시하였다. 이때 상대적으로 저수용량이 커서 조절능력이 좋은 화천댐, 소양강댐, 충주댐은 저류와 방류의 회귀 관계가 잘 형성되었다. 작성된 조작기준으로 실제 운영 기간동안에 대하여 모의조작을 수행하여 그 효율성을 검증하였다.

  • PDF