• 제목/요약/키워드: Operations Scheduling

검색결과 588건 처리시간 0.048초

공정 네트 모델과 유전 알고리즘에 의한 공정 계획과 일정 계획의 통합 (Integration of Process Planning and Operations Scheduling by Process Net Model and Genetic Algorithm)

  • 박지형;강민형;노형민
    • 한국정밀공학회지
    • /
    • 제15권3호
    • /
    • pp.82-87
    • /
    • 1998
  • In order to provide a manufacturing system with efficiency and flexibility to cope with the changes in shop floor status, the integration of process planning and operations scheduling is required. In this paper, an integrated system of process planning and operations scheduling based on the concept of process net model and genetic algorithm is suggested. The process net model includes the alternative process plans. The integrated system is applied for prismatic parts.

  • PDF

LSB 스케줄링기법의 소개

  • 박창규;김현준
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2002년도 춘계공동학술대회
    • /
    • pp.944-948
    • /
    • 2002
  • In industrial production setting scheduling problems of detalied day-to-day operations are often ordeals to production practitioners. For those who have scheduling experience with the Gantt Chart, the job oriented heuristic scheduling has illustrated its merits in solving practically large stale scheduling problems. It schedules all operations of a job within a finite capacity before considering the next job. This paper introduces a new LSB (load smoothing backward) scheduling algorithm for the job oriented heuristic scheduling. Through the computer simulation in a hypothetical setting, this paper provides a comparison of LSB scheduling with existing algorithms and a guideline for selecting the suitable algorithm for certain industrial setting.

  • PDF

작업지향 탐색적 일정계획을 위한 LSB 기법 (LSB Algorithm for the Job Oriented Heuristic Scheduling)

  • 김현준;박창규
    • 경영과학
    • /
    • 제21권2호
    • /
    • pp.79-91
    • /
    • 2004
  • In industrial production settings, scheduling problems for detailed day-to-day operations are often ordeals to production practitioners. For those who have scheduling experiences with the Gantt Chart, the job oriented heuristic scheduling has illustrated its merits in solving practically large scale scheduling problems. It schedules all operations of a job within a finite capacity before considering the next job. In this paper, we Introduce the LSB (load smoothing backward) scheduling algorithm for the job oriented heuristic scheduling. Through a computer experiment in a hypothetical setting, we make a performance comparison of LSB scheduling algorithm with existing algorithms and also suggest a guideline for selecting the suitable algorithm for certain industrial settings.

Job Shop 통합 일정계획을 위한 유전 알고리즘 (A Genetic Algorithm for Integration of Process Planning and Scheduling in a Job Shop)

  • 박병주;최형림;강무홍
    • 한국경영과학회지
    • /
    • 제30권3호
    • /
    • pp.55-65
    • /
    • 2005
  • In recent manufacturing systems, most jobs may have several process plans, such as alternative sequence of operations, alternative machine etc. A few researches have addressed the necessity for the integration of process planning and scheduling function for efficient use of manufacturing resources. But the integration problem is very difficult and complex. Many prior researches considered them separately or sequentially. It introduces overlapping or partial duplications in solution efforts. In this paper, Integration problem of jobs with multiple process plans in a job shop environment Is addressed. In order to achieve an efficient integration between process planning and scheduling by taking advantage of the flexibility that alternative process plans offer, we designed GA(Genetic Algorithm)-based scheduling method. The performance of proposed GA is evaluated through comparing integrated scheduling with separated scheduling in real world company with alternative machines and sequences of operations. Also, a couple of benchmark problems are used to evaluate performance. The integrated scheduling method in this research can be effectively epplied to the real case.

동정 네트 모델에 의한 공정 계획과 일정 계획의 통합 (A Process-net based System for the Integration of Process Planning and Operation Scheduling)

  • 박지형;강민형;노형민
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 1997년도 춘계학술대회 논문집
    • /
    • pp.445-449
    • /
    • 1997
  • In order to provide a manufacturing system with efficiency and flexibility to cope with the changes in shop floor status, the integration of process planning and operations scheduling is required. In this paper,an integrated system of process planning and operations scheduling based on the concept of process net model is presented. The process net model includes the alternative process plans. The integrated system is applied for prismatic parts.

  • PDF

공간 일정 계획의 이슈들과 접근방법 (Issues and approaches to spatial scheduling)

  • 이경전;이재규
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1995년도 춘계공동학술대회논문집; 전남대학교; 28-29 Apr. 1995
    • /
    • pp.758-759
    • /
    • 1995
  • In large-scale industry such as shipbuilding, aircraft manufacturing, and construction industry etc., it is required to consider two or three-dimensional spatial availability as one of bottlenecked resource constraints. We call this kind of scheduling a spatial scheduling, which considers the dynamic spatial layouts of objects as well as the traditional resource constraints. Since 1991, we have researched on the spatial scheduling for shipbuilding plant (Lee & Lee, 1992; Lee et al., 1994, Lee et al., 1995). In this paper, we present the various issues of spatial scheduling for the researchers and developers attacking spatial scheduling problems.

  • PDF

휴리스틱을 이용한 초계함급 함정의 정박당직근무 일정계획 (An Watch Duty Scheduling by using Heuristic focused on Korea Navy Ship)

  • 장영천;전건욱
    • 한국국방경영분석학회지
    • /
    • 제31권2호
    • /
    • pp.60-74
    • /
    • 2005
  • The main purpose of this study is to develop an watch duty scheduling focused on Korea Navy Ship, PCC class, in port. The watch duty scheduling is a type of a scheduling problem which both considers the readiness of the ship and fair duty for each person. In this study, we analyzed the personal ability and military occupational speciality and developed a manpower scheduling by using heuristic. We find an efficient and effective watch duty schedule which improved results.

A rule-based scheduling system for automated machining

  • Ahn, Jaekyoung
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1992년도 춘계공동학술대회 발표논문 및 초록집; 울산대학교, 울산; 01월 02일 May 1992
    • /
    • pp.249-257
    • /
    • 1992
  • An automated machining system involves concurrent use of manufacturing resources, alternative process plans, and flexible routings. High investment in the installation of automated facilities requires an efficient scheduling system that is able to allocate the resources specified for operations over a scheduling horizon. The primary emphasis of this paper is to generate schedules that accurately reflect details of the automated environment and the objectives stated for the system. In this paper, a scheduling algorithm for automated machining is presented. Using the previous simulation research for this topic, a rule-based scheduling system is constructed. An architecture for an intelligent scheduling system is proposed, and the system has a high potential to provide efficient schedules based on the task-specific knowledge for the dynamic scheduling environment

  • PDF

An Operating System Design and Development for Efficient Painting Process

  • Chung, Kuy-Hoon;Baek, Tae-Hyun;Park, Ju-Chull;Cho, Kyu-Kab
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2000년도 춘계공동학술대회 논문집
    • /
    • pp.183-187
    • /
    • 2000
  • In this study, we design a scheduling system for painting shop, called HYPOS(Hyundai heavy industry Painting shop Operating System) and develop a system implementing the design. The painting shop operations are currently scheduled manually by experts. Manual scheduling is a serious time consuming job and generally can not guarantee a full optimality. Building a traditional heuristic scheduling system lot this problem, however, is not promising because there are various kinds of constraints to be satisfied including space allocation of shipbuilding blocks in a painting cell. We, therefore, adopt a spatial scheduling approach and develop scheduling algorithms based on field-oriented scheduling heuristics and computational geometry. And we show that the algorithms can successfully be applied to the painting shop scheduling problem.

  • PDF