• Title/Summary/Keyword: Operational Scheduling

Search Result 116, Processing Time 0.026 seconds

Heuristics for Scheduling Wafer Lots at the Deposition Workstation in a Semiconductor Wafer Fab (반도체 웨이퍼 팹의 흡착공정에서 웨이퍼 로트들의 스케쥴링 알고리듬)

  • Choi, Seong-Woo;Lim, Tae-Kyu;Kim, Yeong-Dae
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.36 no.2
    • /
    • pp.125-137
    • /
    • 2010
  • This study focuses on the problem of scheduling wafer lots of several product families in the deposition workstation in a semiconductor wafer fabrication facility. There are multiple identical parallel machines in the deposition workstation, and two types of setups, record-dependent setup and family setup, may be required at the deposition machines. A record-dependent setup is needed to find optimal operational conditions for a wafer lot on a machine, and a family setup is needed between processings of different families. We suggest two-phase heuristic algorithms in which a priority-rule-based scheduling algorithm is used to generate an initial schedule in the first phase and the schedule is improved in the second phase. Results of computational tests on randomly generated test problems show that the suggested algorithms outperform a scheduling method used in a real manufacturing system in terms of the sum of weighted flowtimes of the wafer lots.

Multi-functional Fighter Radar Scheduling Method for Interleaved Mode Operation of Airborne and Ground Target (전투기탑재 다기능 레이다의 공대공 및 공대지 동시 운용 모드를 위한 스케줄링 기법)

  • Kim, Do-Un;Lee, Woo-Cheol;Choi, Han-Lim;Park, Joontae;Park, Junehyune;Seo, JeongJik
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.49 no.7
    • /
    • pp.581-588
    • /
    • 2021
  • This paper deals with a beam scheduling method in fighter interleaving mode. Not only the priority of tasks but also operational requirements that air-to-ground and air-to-air search tasks should be executed alternatively are established to maximize high-quality of situational awareness. We propose a real-time heuristic beam scheduling method that is advanced from WMDD to satisfies the requirements. The proposed scheduling method is implemented in a simulation environment resembling the task processing mechanism and measurement model of a radar. Performance improvement in terms of task delay time is observed.

Gain scheduled control of magnetic suspension system

  • Kim, Young-Chol;Ryu, Seung-Ki;ryu, Jeong-Woong
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1993.10b
    • /
    • pp.321-326
    • /
    • 1993
  • A gain scheduling approach for the suspension control of a nonlinear MAGLEV System is presented. We show that this technique is ver useful for improving not only performance to the operational disturbances originating aerodynamic force but also robustness to the uncertainty of payload. As a scheduling variable, even though the external disturbance need to be estimated in real time, but the additive measurement is not required to do it. Some simulations show that the gain scheduling control system performs very well comparing with other method using a nonlinear feedback linearization or a fixed gain linear feedback.

  • PDF

Genetic algorithms with a permutation approach to the parallel machines scheduling problem

  • Han, Yong-Ho
    • Korean Management Science Review
    • /
    • v.14 no.2
    • /
    • pp.47-61
    • /
    • 1997
  • This paper considers the parallel machines scheduling problem characterized as a multi-objective combinatorial problem. As this problem belongs to the NP-complete problem, genetic algorithms are applied instead of the traditional analytical approach. The purpose of this study is to show how the problem can be effectively solved by using genetic algorithms with a permutation approach. First, a permutation representation which can effectively represent the chromosome is introduced for this problem . Next, a schedule builder which employs the combination of scheduling theories and a simple heuristic approach is suggested. Finally, through the computer experiments of genetic algorithm to test problems, we show that the niche formation method does not contribute to getting better solutions and that the PMX crossover operator is the best among the selected four recombination operators at least for our problem in terms of both the performance of the solution and the operational convenience.

  • PDF

Genetic Algorithms with a Permutation Approach to the Parallel Machines Scheduling Problem

  • 한용호
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.14 no.2
    • /
    • pp.47-47
    • /
    • 1989
  • This paper considers the parallel machines scheduling problem characterized as a multi-objective combinatorial problem. As this problem belongs to the NP-complete problem, genetic algorithms are applied instead of the traditional analytical approach. The purpose of this study is to show how the problem can be effectively solved by using genetic algorithms with a permutation approach. First, a permutation representation which can effectively represent the chromosome is introduced for this problem . Next, a schedule builder which employs the combination of scheduling theories and a simple heuristic approach is suggested. Finally, through the computer experiments of genetic algorithm to test problems, we show that the niche formation method does not contribute to getting better solutions and that the PMX crossover operator is the best among the selected four recombination operators at least for our problem in terms of both the performance of the solution and the operational convenience.

Optimal Operational Schemes of Mailing Center based on Simulation (Simulation 기반 우편집중국 최적운영 방안)

  • Nam, Yoon-Seok;Lee, Hong-Chul
    • IE interfaces
    • /
    • v.13 no.4
    • /
    • pp.680-687
    • /
    • 2000
  • The objectives of this research are to establish the operation scheduling and the preventive maintenance system in order to optimize the operation of mailing center. For the optimal operation scheduling of mailing process, the existing workflow of mailing process and that of required time are investigated prior to simulation modeling. The simulation experiments are conducted to increase the nextday delivery rate. The best alternative whose nextday delivery rate up to 100% is selected based the AHP(Analytic Hierarchy Process) method. The optimal work scheduling of all mailing centers are also presented. In addition, the CMMS(Computerized Maintenance Management System) for preventive maintenance is introduced for efficient operation of highly automated facilities of mailing center.

  • PDF

Cost-Based Directed Scheduling : Part I, An Intra-Job Cost Propagation Algorithm (비용기반 스케쥴링 : Part I, 작업내 비용 전파알고리즘)

  • Kim, Jae-Kyeong;Suh, Min-Soo
    • Journal of Intelligence and Information Systems
    • /
    • v.13 no.4
    • /
    • pp.121-135
    • /
    • 2007
  • Constraint directed scheduling techniques, representing problem constraints explicitly and constructing schedules by constrained heuristic search, have been successfully applied to real world scheduling problems that require satisfying a wide variety of constraints. However, there has been little basic research on the representation and optimization of the objective value of a schedule in the constraint directed scheduling literature. In particular, the cost objective is very crucial for enterprise decision making to analyze the effects of alternative business plans not only from operational shop floor scheduling but also through strategic resource planning. This paper aims to explicitly represent and optimize the total cost of a schedule including the tardiness and inventory costs while satisfying non-relaxable constraints such as resource capacity and temporal constraints. Within the cost based scheduling framework, a cost propagation algorithm is presented to update cost information throughout temporal constraints within the same job.

  • PDF

Operational Optimization Analysis of Industrial Operators' Fleet (화주 직접운항 선대의 운영 최적화 분석)

  • 김시화;이경근
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.23 no.4
    • /
    • pp.33-51
    • /
    • 1998
  • The industrial operation is one of the three basic modes of shipping operation with liner and Tramp operations. Industrial operators usually control vessels of their own or on a time charter to minimize the cost of shipping their cargoes. Such operations abound in shipping of bulk commodities, such as oil, chemicals and ores. This work is concerned with an operational optimization analysis of the fleet owned by a major oil company. a typical industrial operator. The operational optimization problem of the fleet of a major oil company is divided Into two phase problem. The front end corresponds to the optimization problem of the transportation of crude oil. product mix. and the distribution of product oil to comply with the demand of the market. The back end tackles the scheduling optimization problem of the fleet to meet the seaborne transportation demand derived from the front end. A case study reflecting the practices of an international major oil company is demonstrated to make clear the underlying ideas.

  • PDF

Experimental Test Results of Nine Scheduling Operational Modes of PV and Battery Hybrid System for the Development of Automatic Control Algorithm for Continual Operation without being shut-downed (태양광 배터리 Hybrid 전력공급시스템 9가지 운전 모드 시험결과 및 무고장 연속 운전을 위한 자동제어 알고리즘 개발)

  • Song, Taek Ho;Yang, Seung Kwon;Kim, Minjeong
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.5 no.1
    • /
    • pp.25-32
    • /
    • 2019
  • K-BEMS System was introduced to reduce peak load and to save total energy of the 200 buildings that KEPCO headquarter and branch offices use. And K-BEMS system is composed of PV, battery, and hybrid PCS. KEPCO research institute has carried out this K-BEMS research project for 3 years since January 2016. In this paper, the results of the project are shown. 9 modes of test results of K-BEMS system and are operational problems were analyzed. And measures to cure the trouble are also suggested. Batteries are operated more than 20% of SOC, and less than 20% of SOC battery protection switches are automatically shutting down the system and the system no longer respond to EMS, ending the supply of PV, and so therefore to continue the PV power supply it was turn out to be necessary that the EMS should automatically change its policy to change PV only supply mode automatically when the Battery Switch automatically operated. To operate the system continuously and automatically, it is necessary to modify the minimum operational SOC value, and in addition to that the EMS computer must remember the last shut-down SOC and Voltage which interrupted the system and add some margin to reflect the measurement error in the system.