The pump/motor selection program for optimized selection of regional water supply facilities was developed based on a flowchart compiled from basic operational data, total head requirement, initial pump/motor specification selection etc. This program was developed in Visual Basic. The program accepts, as in the flowchart, operational requirements of pumps and other system requirements, and calculates specific speed based on flow rate, total head and rotational speed. Then the calculated specific speed is used to select pump types and speed prior to determining likelihood of cavitation occurring at the calculated NPSH. Power requirement is then calculated for safe operation of pump to assist final pump selection. Test results of the program match very closely to the design values of Paldang intake pump station(3rd stage) proving that the program can be used as an effective and practical aid for designing new regional water supply systems.
The Pump/Motor Selection Program for optimized selection of regional water supply facilities was developed based on a flowchart compiled from basic operational data, total head requirement, initial pump/motor specification selection etc.. This program was developed in Visual Basic. The program accepts, as in the flowchart, operational requirements of pumps and other system requirements and calculates specific speed based on flow rate, total head and na Then the calculated specific speed is used to select pump types and rpm Prior to determining likelihood of cavitation occurring at the calculated NPSH. Power requirement is then calculated for safe operation of pump to assist final pump selection. Test results of the program matches very closely to the design values of Paldang intake pump station(3rd stage) proving that the program can be used as an effective and practical aid for designing new regional water supply systems.
The Urban Transit Standardization Program has been supported by the Ministry of Land, Transport and Maritime Affairs. The Program consists of dozen or more projects and thus is quite complex, which implies that the program success heavily depends upon the effective management of various artifacts during the development. Particularly, in the complex systems development, developing and managing requirements is very important throughout the whole system life cycle. The requirements can be the basis of the design changes to be made later as well as the test and evaluation to be performed in the subsequent stages of the systems development. As such, the derivation of the system's requirement based on the needs from the customers, or stakeholder in a broad sense must be done properly. In particular, notice that the system is being developed but the system requirements are not fully available for some reasons. To complement this situation is the purpose of the study. To derive proper requirements effectively in the process of development, this paper proposes to draw up scenario using the output of the system under development and to utilize the use case diagrams and operational scenarios.
본 논문은 철도차량의 운영상 반복시간과 차량소요량 사이의 관계를 고찰한다. 철도차량의 운영상 반복시간은 물리적 회차시간과 대기시간으로 구별되며, 본 논문은 이 가운데 운영상 반복시간의 산정모형과 산정 결과에 대한 다양한 고찰을 제시한다. 제시된 운영상 반복시간의 산정모형을 활용하면 터미날 정거장에서의 운영상 반복시간을 최소화 할 수 있도록 설정할 수 있다. 또한 차량소요량이 감소되는 운영상 반복시간 설정조건을 제시한다. 현실적인 데이터를 활용하여 운영상 반복시간 설정조건에 따라 차량소요량이 감소하는 사례와 분석결과를 제시한다. 본 논문에서 제시하는 방법은 기존 철도운영기관의 차량소요량을 최소화 하는 열차운영계획 및 차량운용계획 수립에 활용이 가능할 것으로 기대된다.
Requirements management is one of the most essential activities of systems engineering in developing successful weapon systems. Particularly it is very important to consistently manage the traceability among the user requirements, the system requirements, the development specifications and the testing plans throughout the entire life cycle of the weapon system. However, the most part of requirements-related activities has centered around the functional and performance requirements but the integrated logistics support(ILS) requirement has not properly been managed. In this regard, a special attention is needed to develop and manage the ILS requirements. To do so, the ANSI/EIA-632 standard can be referred as a starting point since the ILS requirements of the weapon system under development are specified by the enabling products whereas the functional and performance requirements are covered by the end product requirements. Specifically, we first review and model several cases of previous weapon systems development, which reveals the problem of interest. Then, under the framework of ANSI/EIA-632, we study a hierarchical model for effectively managing ILS requirements by analyzing the features of ILS requirements. Finally, the value of the proposed model is discussed through the case study of electronic warfare equipment.
Airworthiness authorities specify the technical standards of airworthiness that propose minimum requirement of the commercial transport category and apply the rules in the certification process to ensure the safety of the aircraft. The Federal Aviation Administration and other national airworthiness authorities define the fatal accident risk levels for the safety assessment of the aircraft system and establish standard procedures to apply both qualitative and quantitative analysis techniques. However, an accident or incident may occur by the combination of various factors, although the aircraft is designed in accordance with the strict standards and approval by the Airworthiness Authorities. There are some key factors, such as human error, unpredictable complex system failures, degradation of the components reliability, improper maintenance task and intervals. Risk can be reduced by reflecting aircraft operational experience with similar types of aircraft in the process of aircraft development and safety assessment. Result of the root cause analysis for the Airbus A300-600 incident in which the aircraft engine reverser was deployed in the air have been introduced to reflect the design of system and related components. Also, this paper suggests to create a big-database in order to provide a feed-back to the FAR Part 25 transport category design and safety assessment of the operational experience.
본 연구에서는 무기체계 소요기획 단계에서 목표운용가용도를 산정할 때 활용할 수 있는 운용가용도 계산 모델을 제안한다. 운용가용도 계산 모델은 체계의 운용가용도 계산에 필요한 시간요소 정의와 시간 값 추정 방법으로 구성된다. 운용가용도 계산 시간요소는 총시간과 총비가동시간 요소로 구성된다. 시간요소는 운용형태종합 및 임무유형(OMS/MP : Operational Mode Summary/Mission Profile) 요소를 기초로 정의하였다. 총시간은 전시 작전기간 혹은 평시 365일이며, 총비가동시간은 총예방정비시간, 총고장정비시간, 총행정/군수지연시간으로 구성된다. 그리고 이러한 시간요소에 대하여 무기체계 유형별 시간 값 추정 방법을 제시하였다.
Anaerobic digestion system is getting more attractive in that it produces biogas in the process of organic waste stabilization. Net energy production is important when biogas production is concerned. In this study, net energy production was evaluated with respect to biogas production and heat losses in a hypothetical digester. Under the condition of digester operation with slurry inflow of 5% of TS, additional fuel is required to maintain digester temperature during the winder season. Substrate therefore, needs to have higher VS contents through co-digestion of silage or food waste that has greater values of methane production rate. Heating input slurry is important in cold season, which covers over 80% of heating requirement. Heat recovery from digestate is valuable to reduce the use of biogas for heating. It seems desirable to minimize slurry inflow when temperature is very low. Psychrophilic digestion may be a feasible option for reducing heating requirement.
In Weapons acquisition process, if the requirements are not clear, it leads to confusion and conflict in business. In the development of next-generation weapons, to define and derive requirements has to start from decision of operational concept. It is difficult task and has many uncertainties. This paper has goal about development of knowledge acquisition process that derive military operational scenario-based requirements acquisition process and framework that classify and save the derived requirements for next project. That framework can generate new class and category, also suggest that verification of requirements. It help to derive and manage the requirements, and make it easy to grasp the requirements. Accordingly, it can help make military requirement plan and weapon acquisition process.
The systems engineering standard process is intended to be customized for a given project environment and system characteristics. This study describes the experience gained by applying systems engineering to government-funded projects. The characteristics of government funded project are lack of common development process among the participating organizations and mechanism to determine system requirements. This study describes the contents of the systems engineering activities, including development of operational concept, system requirements, verification requirements (test cases), test verification plan, and implementation of system test and lessons learned from these activities.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.