• Title/Summary/Keyword: Operation technology

Search Result 10,939, Processing Time 0.05 seconds

The Study of Operation provision for lightrail of tram formats (노면전철형식의 경량전철 운전규정에 관한 연구)

  • Lee, Soo-Hwan;Kim, You-Ho;Lee, Hoon-Koo;Pyeon, Seon-Ho;Hwang, Hyeon-Chyeol
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1023-1024
    • /
    • 2008
  • The road surface scripture season must be interpreted with hitherto whole aspect line scripture season different. TRAM (street cars) it respects an operation it stands and back must be operated the bus which runs place and riding grade different public transportation means and to be mixed. With the numerous crossroads zebra crossing and the coat platform must operate back. The role of the operation article most is important. It undergoes the influence of traffic signal specially directly. It considers each facility etc. of the road and must construct a proper equipment in him with connection method of the signal system which it follows in the middle urethra. Must secure the fixed time characteristic of the operation which road surface scripture season is efficient and expression speed and operation. In order the [le] according to interface plan with traffic signal it does to consider a traffic signal first of all. This the research of operation provision is necessary.

  • PDF

A Study on Decision-making of Equipment Procurement for Plant Operations & Maintenance (O&M) - Focused on Technology Strategy perspective - (플랜트 O&M을 위한 기자재 조달방식 의사결정에 관한 연구 - 기술전략 관점을 중심으로 -)

  • Hong, Daegeun;Lim, Yongtaek
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.15 no.1
    • /
    • pp.25-33
    • /
    • 2019
  • In the plant industry, the share of equipment accounts for 45 ~ 75%, which is very high. It is a traditional plant centered on processes and reactions like petroleum and chemical plants. Renewable energy generation plants such as wind power generation and solar power generation are equipment-centric plants. Equipment-centric plants are very important not only in the EPC phase but also in the operation and management phase. The procurement of equipment for plant operation and management can be divided into make and buy. Make is a method of producing equipment itself, and buy is a method of procuring equipment from the outside. The procurement method of the equipment directly affects the plant operation and management cost. In this study, the decision making of equipment procurement method for plant operation and management is defined as 4 phase. Each phase is selection of procurement decision-making objects, technology strategy perspective, finance perspective, and production perspective. In detail, we defined selection process of procurement decision-making objects and technology strategy perspective process. We will contribute to the enhancement of the competitiveness of the plant operation and management area by carrying out researches on the process and application examples of financial and production perspectives in the future.

A Study in the Directory Service Protocol in Distributed Environment (분산환경에서의 디렉토리 서비스 프로토콜에 관한 연구)

  • Lee, Jie-Young
    • The Journal of Information Technology
    • /
    • v.9 no.3
    • /
    • pp.59-66
    • /
    • 2006
  • This paper proposes directory service protocol in distributed environment. By adding an condition retrieval function to Modify operation, the ExtModify operation improves the inconvenience to transfer a search operation and resume a Modify operation. The method suggests how to correct all the entries which require retrieval condition out of other entries designated by LDAPND.

  • PDF

A study on advanced EMU's maintenance program on test operation in Dabul line (차세대 전동차 대불선 시운전 시 유지보수방안 연구)

  • Kim, Young-Kyu;Park, Se-Young;Song, Jeong-Hun;An, Cheon-Heon;Lee, Han-Min
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.2215-2222
    • /
    • 2010
  • Advanced EMU have been enhanced in terms of safe transport and maintainability. It is a new urban railway technology that enables an operation institution to cut repair and maintenance costs and customers to use convenient service at lower costs based on IT technology. If a development vehicle of Advanced EMU is completed, it will be used to test the entire advanced EMU system through sufficient performance check and reliability check prior to operation in commercial line. It will also verify efficiency, safety, punctuality and energy efficiency of transport. Accordingly, it is necessary to figure how to repair and maintain vehicles to enhance safety of Advanced EMU system in cooperation with operation during the period of comprehensive evaluation on the operation of a development vehicle in a test line. In this paper, we investigated the maintenance program of Advanced EMU on test operation in Dabul line. The test condition and operation environment of Advanced EMU in Daebul line was analyzed.

  • PDF

The study of effect for bending operation having working hardening on hydroforming parts (하이드로포밍 제품의 가공경화를 가지는 벤딩공정에 의한 영향분석)

  • Kim, Kwang-Soon;Kim, Yun-Gyu;Park, Du-Su
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2007.10a
    • /
    • pp.209-214
    • /
    • 2007
  • This study is concerned with working hardening of bending operation on hydroforming parts. Generally, hydroforming parts having the complicated shape of the automobile, require a 3-dimentional bending operation. This operation involves several variations in the tube which are the thickness, the mechanical characteristics, the hardness, the circumference etc., on original tube. So, we study those variations and the affect on the hydroforming operation and hydroforming parts. We used two methods, one of which was computer simulation and the other the actual test in the plant.

  • PDF

A Study on the Automatic Operation Performance Control of Urban Rail Vehicle Using an Optimal Control (최적제어를 이용한 도시철도 차량 자동주행 제어 연구)

  • Tak, Kil-Hun;Kim, Dong-Hwan;Kim, Chi-Tae
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.15 no.1
    • /
    • pp.29-37
    • /
    • 2007
  • In the automatic operation of an urban rail vehicle, a conventional PID control algorithm is applied to run the vehicle between stations within time limit and jerk limit. But the energy consumption in the automatic operation is much higher than in the manual operation. In this study, the optimal control algorithm for automatic operation is proposed to minimize energy consumption, which satisfies automatic operation for the urban rail vehicle, compared with the conventional PID control algorithm.

Examining Importance of Urban Rotorcraft Operations Using Analytic Hierarchy Process

  • Hye-Jin, Hong;Yong-og, Kim;Sungkwan, Ku
    • International Journal of Advanced Culture Technology
    • /
    • v.10 no.4
    • /
    • pp.487-498
    • /
    • 2022
  • This study aims to determine the importance of each factor considered when operating a rotorcraft in a city. After identifying factors that could affect urban air mobility, we reviewed the influencing factors by applying an analytic hierarchy process (AHP). Level 1 classifies the essential factors of the urban operation of rotorcraft in nominal and off-nominal situations. The factors corresponding to the characteristics of each were composed of lower levels, such as Levels 2 and 3. Using this, the importance of influencing factors was analyzed and the most important factors were determined. The most influential factors of the urban operation of rotorcraft included engine failure, fire situations, and vehicle safety. Accordingly, an environment that can guarantee safe operation by considering the most influential factors in advance in an actual operation stage must be constructed.

A Process Planning System for Machining of Dies for Auto-Body Production-Operation Planning and NC Code Post-Processing

  • Dongmok Sheen;Lee, Chang-Ho;Noh, Sang-Do;Lee, Kiwoo
    • International Journal of Precision Engineering and Manufacturing
    • /
    • v.2 no.3
    • /
    • pp.69-78
    • /
    • 2001
  • This paper presents a process and operation planning system and an NC code post-processor for effective machining of press dies for production of cars. Based on the machining feature, major parts of press dies are categorized into 15 groups and a standard process plan is defined for each group. The standard process plan consists of a series of processes where a process is defined as a group of operations that can be done with one setup. Details such as cutting tools, cutting conditions, and tool paths are decided at the operation planning stage. At the final stage of process and operation planning, the NC code post-processor adjusts feedrates along the tool path to reduce machining time while maintaining the quality. The adjustment rule is selected based on the machining load estimated by virtual machining.

  • PDF

Operation Principle and Topology Structures of Axial Flux-Switching Hybrid Excitation Synchronous Machine

  • Liu, Xiping;Wang, Chen;Zheng, Aihua
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • v.1 no.3
    • /
    • pp.312-319
    • /
    • 2012
  • The operation principle of an axial flux-switching hybrid excitation synchronous machine (AFHESM) is analyzed and its topology structures are proposed in this paper. After some comprehensive analysis of the operation principle to axial flux electrical machine, flux-switching electrical machine and hybrid excitation electrical machine, the operation principle of AFHESM is given. Combined with some typical topological structures of hybrid excitation electrical machine, some possible topological structures are proposed and some comprehensive comparisons are carried out. The analysis results show that the stator-separated AFHESM has some advantages such as less AM turns, less impact on the demagnetization of PM, less magnetic flux-leakage and higher efficiency compared to other topologies.

Characteristics of 5 kW Class Proton-Exchange-Membrane Fuel Cell(PEMFC) Stack according to the Long-Term Operation (장기운전에 따른 5 kW급 고분자 전해질 연료전지 스택의 특성)

  • Kim, Jae-Dong;Lee, Jung-Woon;Park, Dal-Ryung
    • Journal of the Korean Institute of Gas
    • /
    • v.11 no.3
    • /
    • pp.40-43
    • /
    • 2007
  • The performance of PEMFC stack can be improved significantly by optimizing the design and operating conditions. As a result, the performance of daily operation showed slight deviation (0.02-0.9%) after accumulated DSS operation for 500 hrs but the stack performance was stable. Therefore, it is confirmed that it would be improved the life-time of stack and operation reliability for the commercialization of PEMFC system.

  • PDF