Purpose: To establish the building guidelines and to analyze the function of Regional Public Hospitals, the survey was conducted primarily on the current status focusing on the location and relationship of the department, area composition ratio, area per bed, and area per operating room. Methods: The research methods of this paper are as follows. 1) A literature survey on the function of the operating and related departments, 2) A drawing analysis for spatial composition and net area calculation. Results: The area of the Operation Department in the Regional Public Hospitals with 200 to 300 beds are as follows. Area ratio: 3.35%, area per Bed: 2.53㎡/bed, the number of beds per operating room: 64.37bed, area per operating room: 146.46㎡/n, area per operating room by plan type: integration corridor 133.84㎡/n, separation corridor 184.82㎡/n. Implications: This paper analyzed data on the current state of Operation Departments for setting up the function and role for the Regional Public Hospital. In the future, it is also required to provide size that takes into account user behavior and the user's psychological aspect in order to suggest appropriate area.
Automated Guided Vehicles(AGVs) are widely used in computer integrated manufacturing(CIM) systems for material handling purposes. Although automated guided vehicles provide higher levels of flexibility and computer integrability, the installations are limited in number and one of the critical reasons lies in the complexity involved in the operation. The main objective of this research is to alleviate this problem by proposing efficient integrated operational control methods for AGV-based CIM systems. Particularly, this research is concerned with the mixed problem of dispatching automated guided vehicles and scheduling machines operation. The proposed dynamic heuristic algorithm uses various priority schemes and relevant information concerning the load of the system, the status of queues, and the position of AGVs in the scheduling process. The scheduling decision process is hierarchical in the sense that different decision criteria are applied sequentially to identify the most appropriate part to be served. This algorithm consists of two sections, the section of part selection by AGVs for the next service whenever an AGV completes the current assignment, and the section of part selection by machines for next service whenever a machine completes the current operation. The proposed algorithm has been compared with other scheduling schemes using the performance measure of mean flow-time and mean tardiness. Simulation results indicate that the proposed algorithm can reduce the mean flow-time and mean tardiness significantly.
We reviewed our experiences on 33 patients who underwent a bidirectional cavopulmonary shunt[BCPS from February 1992 to July 1994. There were 19 male an 14 female patients, and their weight ranged from 4.4 to 13.3 Kg[mean weight 8.4 $\pm$2.9 Kg . The age ranged from 2 to 55 months [mean age 16.7 $\pm$15.5 months . Their diagnosis included single ventricle group in 16, unbalanced ventricles in 8 whose associated anomalies were double outlet right ventricle, transposition of great arteries and total anomalous pulmonary venous return, tricuspid atresia in 7, hypoplastic left heart syndrome in 1 who underwent a Norwood procedure and double outlet right ventricle with pulmonic stenosis and tricuspid stenosis in 1 who underwent biventricular repair. Among them 10 patients had received other palliative operation before [Norwood procedure 1, pulmonary artery banding 3, modified Blalock-Taussig shunt 6 . The BCPS operations were performed under the cardiopulmonary bypass. 16 patients underwent unilateral BCPS and 17 patients who had bilateral SVC underwent bilateral BCPS. Three patients whose associated anomalies were interruption of IVC underwent total cavopulmonary shunt. There were 5 operative deaths [mortality rate 15.1 % and 2 late deaths. The risk factor for the operation was high mean pulmonary artery pressure [p value<0.05 . The survivors showed good postoperative course and their postoperative oxygen saturation was increased significantly compared to that of preoperative status[p value<0.05 .Conclusively, BCPS operation is effective and safe palliative procedure for the many cyanotic complex congenital anomalies with decreased pulmonary blood flow especialy for the patients who have the high risk factors for Fontan operations.
본 논문은 한국전력 자체 연구과제로 수행된 광역 배전자동화시스템의 개발에 관한 연구 내용을 다루었다. 국내 배진계통 운영 환경에 적합한 광역 배전자동화시스템 설계기준 수립과 통합 시스템용 미들웨어 설계, 통합운영을 위한 감시화면, 회선별단선도, 자동화 응용기능 및 차 시스템 연계 등 운영 프로그램 개발이 수행되었으며, 충남사업본부와 공동으로 본부 배전센터에서 광역 배전자동화시스템을 시범운영함으로써 제반 성능검증 작업과 확대적용을 위한 운영기준이 정립되었다. 개발된 광역 배전자통화시스템은 전국 41개 배전센터에 설치되어 배전계통 운영 선진화에 기여할 전망이다.
CBTC(Communication Based Train Control) System can improve train operation efficiency by realizing moving block system which makes a continuous train interval control in accordance with the position and speed of train. Adopting radio transmission to make a continuous detection of train position and transmit the control data from the ground to a train, CBTC needs dedicated train operation and control algorithm which should be quite different from the conventional track-circuit-based train control system. This paper provides a train operation display and control algorithm for CBTC system in making train interval control, train route control and train supervision. Signalling pattern diagram is devised to analyze the train interval control mechanism of moving block system, and interlocking logic is devised to represent the train route control mechanism of moving block system. For train supervision, train occupation status on railway are displayed by using the segment which virtually divide the whole railway. The proposed method has been successfully applied to the development of CBTC system for the standardized AGT(automatic guided transit) which is under construction now in Korea, and also can be applied to any other CBTC system.
To understand the financial situation of waterworks, the revenue and operation cost from 1996 have been analyzed. The budget of waterworks was 3,775 billion won in 1996 and grew up to 5,774 billion won in 2007. The budget has grown about 1.53 times during 11 years. Based on 2007, total cost for supplying water, rehabilitating old facilities and returning debt and its interest was 4146 billion won. The cost was recovered by 2,825 billion won of water revenue, 827 billion won of various fees revenue, 571 billion won of financial grant and 89 billion won of loan. Until 2007, the 15.3% of operation cost for waterworks was covered by government grant and loan. The renovation cost for old non-efficient facilities was 1,356 billion won in 1996 and was 1,486 billion won in 2007. The renovation cost was not increased remarkably during 10 years. Since the total operation cost was increased about 1.5 times, the percentage for renovating old facilities was decreased from 36% to 25.7%. This trend need to be alerted because the renovation has been slow down when the facilities for water supply need more rehabilitation.
This study was conducted to analyze the current situation of the logging operation system and to suggest an effective policy plan to secure important raw materials for the use of forest biomass. The dissemination of forestry mechanization and the establishment of the logging operation are important tasks to establish a system and reduce costs of timber production by increasing the use of forest biomass; this includes increasing the supply of timber for domestic products and increasing the production of wood chips and wood pellets. In particular, the efficiency of steep-slopes catenary system machinery for yarding such as tower-yarder and swing-yarder should be urgently supplied to cope with forest production and supply of forest biomass energy resources. In addition, it is necessary to continuously promote the dissemination of high-performance forestry machinery as is being done in Japan. At the same time, instead of distributing or retaining the spread of forestry machinery to the state and local governments, it is necessary to distribute timber production work centered on forest cooperatives or private timber producers to be carried out by wood producers, forest cooperatives and individuals.
한국철도공사는 비수익 노선과 해당 노선의 운행 열차에 대한 폐지를 통해 수익성을 개선하고 있다. 그 일환으로 통근열차 구간이 다수 폐지되었으며 현재는 경의선과 경원선의 통근열차 노선만이 운영 중에 있다. 그러나 지역 주민들의 열차운영 요청이 여전히 존재하는 바, 이에 기존의 단순한 통근열차로서의 기능에서 한단계 더 진행하여 KTX와의 연계를 꾀할 수 있는 Local선 운영 정책이 필요하다. 본 연구에서는 전체적인 과거 통근열차의 운영정책과 성과와 기존 운영정책의 문제점을 고찰한 후 외국의 고속철도와 연계한 적자 로컬선의 운영정책을 분석하고 호남선 인근 도시로 지역을 축소하여 익산-전주간 연계셔틀에 도출된 발전방향을 적용하고자 한다.
This 27 year-old male patient had severe mandibular prognathism (right and left mesio-occlusion were 0.4㎝ and 1.2㎝ , respectively). He had good oral health relatively exception of missing teeth. We examined all of his oral and skeletal status with full mouth x-ray taking, study model, and cephalogram. His general condition was good but above examination indicated the surgical operation for the mandibular prognathism. His laboratory tests were within normal limits. We determined surgical operation which was done by extraoral approach bilaterally. Incisions were made bilaterally 1.5㎝ beneath the inferior border of the mandible in the selected area and then the inferior border of the ascending rami was exposed. Retracting the periosteum to the lingual and buccal a slight amount, the cut in the bone was performed by use of bone drill. Avoiding T.M.J. troubles, the proximal segmant was not fixed to anterior segment, being in overlapping state buccally, in order to expect a natural healing by the environmental muscles and ligaments. We had immobilization with intermaxillary fixation by using the multiple Stout's method. He was discharged 17 days after operation. His general condition and operation results were good and satisfactory.
Post-tonsillectomy pain in children is a difficult problem to manage. We examined the effect of 10% aerosol lidocaine for the post-tonsillectomy analgesia. ASA physical status I or II, between five and thirteen years of age were assigned, in a randomized fashion, into two groups. The Group I, 30 patients, received a total dose of 4 mg/kg of ten percent aerosol lidocaine on the tonsillar beds. Lidocaine was administered at the end of the surgical procedure. The Group II, 30 patients, were not sprayed with lidocaine aerosol. The postoperative pain scores were assessed by a "red and white" visual analoge pain scales (VAPS). VAPS values were obtained at one and eight hours after the operation. Values of one hour after the operation in the group I and II were $20.83{\pm}10.01$ and $34.50{\pm}10.53$, values of eight hours after the operation were $17.33{\pm}9.07$ and $23.5{\pm}11.08$. The post-tonsilectomy pains were significantly lower in the group I compared with the group II at one and eight hours after the operation. In conclusion, 4 mg/kg of ten percent aerosol lidocaine applied directly on the tonsillar beds was showen a superior, immediate post-tonsillectomy analgesic technique.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.