• Title/Summary/Keyword: Operation status

Search Result 2,203, Processing Time 0.029 seconds

Development of Interface Inspection System for On-board Signal Equipment (열차 차상신호 인터페이스 검사 시스템 개발)

  • Park, Jae-Young;Lim, In-Taek
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.4
    • /
    • pp.2324-2329
    • /
    • 2014
  • The inspection of distance to go train control system conducted only when train is in main line or inspecting line, that affects low work efficiency and hazard elements to safe operation. Before or after train operation, the interface test between on-board and wayside signal system must be conducted. In this paper, onboard signal interface inspection system based on the real-time automatic analysis of onboard system status information that is transmitted to the wayside system and the operation status check of the onboard signal device operates as a virtual train information that is transmitted to the onboard system have been proposed. And after building the inspection system to the inspecting track of Daejeon Subway Line 1, Panam Depot, the verification algorithm of proposed interface test and the results was presented. therefore, it has enhanced work efficiency to do not carry train operation of a half hour in test line to test on-board system.

A Study on the Status and Utilization of Computed Tomography Units in Pusan Area (전산화(電算化) 단층촬영기(斷層撮影機)의 보유현황(保有現況) 및 이용실태(利用實態) (부산시내(釜山市內) 병원(病院)을 중심(中心)으로))

  • Oh, Moon-Young
    • Journal of radiological science and technology
    • /
    • v.14 no.1
    • /
    • pp.29-44
    • /
    • 1991
  • A Study on the distribution and types of the total 40 CT units, as of 1st October 1990, in Pusan area(29 for whole body CT units, 11 for brain CT units) were carried out during the period from January 1989 to December 1989 to find out the status of operation and utilization of whole body CT units. The results were as following ; 1. As of 1st October 1990 in Pusan area, a total of 40 CT units(29 for whole body CT units, 11 for brain CT units) were set up and operated. The number of cases of CT examination performed per day per unit were appeared to be less than 5 cases among 59.5% of CT units, and 2.7% of the total units has peformed more than 16 examinations. 2. The CT units under operation occupied 93.5% of the total and 2.6% of the total units was not properly been operated due to mechanical breakdown. This results is appeared to be better than other reports. 3. The average number of scanning per week for each CT were 35 cases and the average days under operation of the unit per week were 6.7 days. Consequently, the average days under operation of units was higher than that of the other reports, but the average number of scanning was lower. 4. The cases referred from other institutes to hospitals were 6.4% of total cases. 5. As a site of scanning, the brain appeared most frequently with 71.2% of the total cases and followed by spine 12.4%, abdomen 8.5%, and thorax 3.6%, respectively. 6. Positive rate by scanning was 70.8% of total cases, and it was 98.9% with thorax, abdomen 96.3%, spine 93.1%, and brain 38.4%, respectively. According to the results of this study, it is highly recommended that the regulations and the guidelines for setting-up of such high cost medical equipments as CT units be provided in order to ensure the cost-effectiveness of the system.

  • PDF

A Case Study on the Appealing Dementia Rest Area in Our Village for Regional Specialization Province in Gyeongsangbuk-do ("우리마을 예쁜치매쉼터" 운영에 관한 사례연구; 일 개도의 지역특화사업 중심)

  • Ha, Tae Hee;Hyung, Na Kyum;Kwak, Kyung Phil
    • Journal of Korean Public Health Nursing
    • /
    • v.34 no.2
    • /
    • pp.182-197
    • /
    • 2020
  • Purpose: This study undertook to qualitatively investigate the operation status, support requirements and improvement plans for establishing an appealing dementia rest area in Gyeongsankbuk-do. Methods: Data were collected from May 1 to June 20, 2019, using participation observation and in-depth interview of 8 health professionals, and were subjected to qualitative analysis. Results: Our analysis revealed 4 themes and encompassing 16sub-themes: 1) program operation status (hard to prepare and operate programs, difficulty adjusting the program level, various needs of program participants, lack of mutual understanding among program participants); 2) policy support needs (need for assistants staff and basic education, requirement of extensive training for the main operators, support program aid equipment, incentive payments and performance reflections); 3) project operation's improvement plan (improved the operation of doubles classes, improved of training materials for the main operators, improved program activities and workbooks, Increasing the number of dementia rest areas); 4) positive effects and changes (positive effects of specialized projects, changes in perceptions of dementia, strengthening community awareness through doubles classes, synergy effect on community health care post awareness) Conclusion: We believe the current study results can be applied as basic data for establishing a new model, and will positively impact the national dementia management project.

Development of PEID for Acquiring Maintenance Information during Product Lifecycle of Marine Vessels (선박해양구조물의 제품수명주기 내 유지보수 정보 획득을 위한 PEID에 관한 연구)

  • Jeon, Jeong-Ik;Lee, Jang-Hyun;Son, Gum-Jun
    • Journal of Ocean Engineering and Technology
    • /
    • v.26 no.5
    • /
    • pp.63-72
    • /
    • 2012
  • The product lifecycle of a marine vessel can be classified into the design-production, operation-maintenance, and disposal phases. During the operation and maintenance phase, status data should be gathered from the major machinery and instruments installed on the marine vessel in order to perform efficient maintenance work. Although a PLM (product lifecycle management) system can manage the product information during the design and assembly stage, a PLM based on asset management technology is more appropriate for product information management during the operation stage. Product embedded information devices (PEIDs) are suggested for gathering real-time maintenance information during the operation and maintenance lifecycle. A PEID allows PLM to provide the capability of offering active information exchange between the lifecycle management system and equipment. This study designed a PEID to effectively obtain information and interact with a PLM system. It consists of sensors, wireless communication, and a micro-processor, which allow it to accumulate status data on the PLM system. The embedded information device and PLM enable the seamless information flow, tracking, and updating of MRO (maintenance repair and overhaul) information for a product throughout the middle of the product lifecycle.

Heterogeneous Equipment Support Monitoring System for Operation and Maintenance of Solar power plant (태양광발전소 운영유지보수를 위한 이기종 장비 지원 모니터링 시스템)

  • Lim, Su-Chang;Hong, Seok-Hoon;Park, Chul-Young;Cho, Hyun-Wook;Song, Beob-Seong;Kim, Jong-Chan
    • Journal of Korea Multimedia Society
    • /
    • v.23 no.9
    • /
    • pp.1171-1180
    • /
    • 2020
  • The number of the PV systems installed in south korea has been gradually increasing. Interest of operation & management of PV System is rising up as PV System installation trends to increase. The vital function of operation & management is the monitoring system. Most monitoring systems are only available for equipment of suppliers and manufacturers. In this study, a monitoring system was implemented to support multi-domain equipment (inverter, junction box, water distribution board, environmental sensors) that are not limited to specific manufacturers. Monitoring system includes a visualization function, which makes it easy for users to check the power generation and the operation status of the equipment of PV System. In the future, this monitoring system will be utilized as an operation & maintenance foundation element in the PV system industry.

Development of Real-Time Decision Support System for the Efficient Berth Operation of Inchon Port (인천항의 효율적 선석운영을 위한 실시간 의사결정지원시스템 구축)

  • 유재성;김동희;김봉선;이창호
    • Journal of Korean Port Research
    • /
    • v.13 no.2
    • /
    • pp.189-198
    • /
    • 1999
  • The purpose of this paper is to develop a knowledge-based real-time decision support system to support decision makers for efficient berth operation of Inchon Port. In these days the berth operation problems have been many studied. The berth operation rules differ from port to port and the problem is highly dependent on natural geographical and operational environment of port. In Inchon Port the ship’s entrance into port and departure from port is extremely affected status of dock. In this paper we analyzed some effects of dock a specific character of Inchon Port with a real data of ship’s in Inchon Port. And reconstruct a previous expert’s knowledge of berth allocating problem in Inchon Port. Also the mechanism for the efficient berth operation has been studied by repeatedly dispatching in order to obtain a best effect of berth allocation, with real-time updated information for delay at service time of a specific berth and changing of a working-berth. The system is developed with graphic user interface(GUI) concept using user interactive approach. And this system will be provide decision support maker with an efficient and fast way to berth allocating and reduce wastes of time space and manpower in Inchon Port operation.

  • PDF

Integrated Operation of Power Conversion Module for DC Distribution System (직류 배전 시스템을 위한 전력 변환 모듈의 통합 운전)

  • Lee, Hee-Jun;Shin, Soo-Choel;Hong, Suk-Jin;Won, Chung-Yuen
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.19 no.3
    • /
    • pp.240-248
    • /
    • 2014
  • It is DC power that Output of renewable energy being recently developed and researched. Also, demand of DC power will expect to proliferate due to increase of digital load. Thus, DC distribution system providing high quality of power and reliability has emerged as a new distribution system. If the conventional distribution systems are substituted by proposed DC distribution system, the output of renewable energy can be connected with distribution systems under minimum power conversion. Therefore, in the event of connection with DC load, it can construct an efficient distribution system. In this paper, the integrated parallel operation of power conversion module for DC distribution system is proposed. Also, this paper proposed modularization of power conversion devices for DC distribution system and power control for parallel operation of large capacity system. DC distribution system consists of three power conversion modules such as AC/DC power conversion module 2 set, ESS module 1 set. DC distribution system controls suitable operation depending on the status of the DC power distribution system and load. Integrated operation of these systems is verified by simulation and experiment results.

Development of Multi LED type Door Status Indication Lamp for rolling stock (Multi LED를 이용한 철도차량용 Door Status Indication Lamp)

  • Seo, Bum-Won;Choi, Jae-Sung;Kim, Dong-Il
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1668-1674
    • /
    • 2011
  • Door Inside Lamp of railway rolling stock is installed on interior of the side doors and illuminated at door opening and closing, isolation and fault. So drivers or passengers can notice the door status visually. In the past, a single color or Bi-color LED Lamps have been using and one ~ multiple lamp was used to implement the feature according to client's requirements. (Example: Total of between 2 and 4 lamps are required for the Warning / Emergency operation / Isolation / Fault.) However these design is not easy to apply if there is the mounting space restrictions and the problems such as rising costs can be caused. In addition, it has vulnerability from point of view aesthetic aspects. Therefore the lamp type has been required that has small size and number of colors in order to resolve these problems. Recently multi LED type door status indication lamp have been developed that can meet the requirements and this lamp has been applied in many railway projects. In this study, I'll introduce the general characteristics and mechanical & electrical characteristics of multi LED type door status indication lamp to help development of this kinds of lamp.

  • PDF

Development of Multi LED type Door Status Indication Lamp for rolling stock (Multi LED를 이용한 철도차량용 Door Status Indication Lamp)

  • Seo, Bum-Won;Choi, Jae-Sung;Kim, Dong-Il
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1466-1472
    • /
    • 2011
  • Door Inside Lamp of railway rolling stock is installed on interior of the side doors and illuminated at door opening and closing, isolation and fault. So drivers or passengers can notice the door status visually. In the past, a single color or Bi-color LED Lamps have been using and one ~ multiple lamp was used to implement the feature according to client's requirements. (Example: Total of between 2 and 4 lamps are required for the Warning / Emergency operation / Isolation / Fault.) However these design is not easy to apply if there is the mounting space restrictions and the problems such as rising costs can be caused. In addition, it has vulnerability from point of view aesthetic aspects. Therefore the lamp type has been required that has small size and number of colors in order to resolve these problems. Recently multi LED type door status indication lamp have been developed that can meet the requirements and this lamp has been applied in many railway projects. In this study, I'll introduce the general characteristics and mechanical & electrical characteristics of multi LED type door status indication lamp to help development of this kinds of lamp.

  • PDF

Setting the Current Air Quality Concentration Using the National Atmosphere Measurement Network

  • CHO, Dong-Myung;LEE, Ju-Yeon;KWON, Lee-Seung;KIM, Su-Hye;KWON, Woo-Taeg
    • Journal of Wellbeing Management and Applied Psychology
    • /
    • v.4 no.3
    • /
    • pp.23-33
    • /
    • 2021
  • Purpose: In the course of the domestic environmental impact assessment, the current status survey was improperly conducted, and the issue of false and inaccurate environmental impact assessment reports has been raised several times recently through media reports. Research design, data and methodology: There is a continuous demand for improvement measures for the current status measurement method, such as having difficulties in securing a normal measurement date in consideration of equipment operation and rainfall days in the field. Results: In addition, in order to grasp the general air quality status of the evaluation target area, it is necessary to check the various current status concentrations by season and time series per year. However, there is a problem that is currently being carried out based on limited results such as measurement for 1 day or 3 days. Conclusions: Therefore, in this study, based on the national atmospheric measurement network, an inverse distance weighted (IDW) interpolation method was applied to calculate the current state concentration. This study suggested a method to use it in preparing the air quality item in the environmental impact assessment report.