• 제목/요약/키워드: Operation schedule

검색결과 416건 처리시간 0.025초

Launch Site Activities for the Launch of an Earth Observation Satellite

  • 임정흠
    • 천문학회보
    • /
    • 제37권2호
    • /
    • pp.195.1-195.1
    • /
    • 2012
  • Korea Aerospace Research Institute has developed an earth observation satellite whose primary mission objective is to provide high resolution electro optical earth images for Geographical Information Systems (GIS) establishment and the applications for environmental, agriculture and ocean monitoring. It was successfully launched into its mission orbit by using a commercial launch vehicle on 18th of May, 2012. This paper describes a series of launch activity at the launch site including its transportation to the launch site. Before conducting the launch site operation, satellite operation plane was prepared. Combining the satellite operation plan and launch vehicle activities, an integrated launch site operation plan and schedule have been drawn up. After arrival of the spacecraft at the launch site, post-ship check out has been conducted. And then it was fuel loaded and integrated with launch vehicle hardware. After completion of final electrical check out, count down procedure was executed. on 18th of May, it was launched into the space and was separated from the launch vehicle as planned. About 3 months of early operation and calibration/validation, now the satellite is conducting its normal mission.

  • PDF

조력발전 운영을 위한 최대 발전량 산정 모델개발 (The Development of Model to Calculate Maximum Power for Tidal Power Plant Operation)

  • 오민환;김활수;김재훈;송규석
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2006년도 춘계학술대회
    • /
    • pp.505-508
    • /
    • 2006
  • Recently, concern for tidal power is being increased by newly recycled energy. It is important to decide on the maximum power estimate operation and it's stop by applying the difference of water level between tide level and artificial reservoir for the administration of tidal development. For maximum output of power through turbine generator, administrative variables and process on efficiency of hydraulic turbine and inflow discharge of reservoir is quite complicated because it is run through the connection of discharge-gate and turbine On the development of this model, the administrative process is decided, Operation block is presented for it's maximum power estimate.

  • PDF

액티비티 기반의 EVM - PMIS 통합모델 구축 (The Establishment of an Activity-Based EVM - PMIS Integration Model)

  • 나광태;강병희
    • 한국건축시공학회지
    • /
    • 제10권1호
    • /
    • pp.199-212
    • /
    • 2010
  • 국내 건설산업에 있어서 기술과 정보의 기반구조를 확립하기 위하여 몇몇 건설정보관련 법규가 제도화되었다. 그러나 국내 건설정보 분류체계, 공정 공사비 통합관리(EVM), 프로젝트관리 정보시스템(PMIS)은 주요한 문제점을 내포하고 있다. 특히 현행 PMIS의 기능은 시공자 위주의 시스템으로 되어 있고, EVM이 적용되지 않아 발주자를 위한 보고, 분석, 예측기능이 매우 취약하다. 더욱이 EVM과 PMIS가 서로 분리된 체계로 운영되고 있어 발주자가 실시간으로 공정 및 공사비 정보를 확인할 수 없다. 본 연구의 목적은 PMIS가 EVM기능을 제공하고 사업참여자들이 제반정보를 공유할 수 있도록 WBS 구축방안과 EVM - PMIS 통합모델을 제안하여, E-비즈니스 업무환경하에서 PMIS를 효율적으로 운용할 수 있는 틀(framework)을 제공하는 것이다. EVM - PMIS 통합의 핵심은 EVM과 PMIS가 액티비티 기반의 동일한 운영체계를 갖는 것이다. 통합의 원리는 액티비티의 정보항목(field)을 PMIS의 공정 및 공사비관리 기능을 위한 하위모듈을 구성하는 관계형 데이터베이스 테이블(table)의 항목과 연계시키는 것이다. 따라서 액티비티의 계획공사비(PA), 달성공사비(EV), 실투입비(AC), 공정편차(SV), 공정수행지수(SPI), 공사비편차(CV), 공사비지출지수(CPI)는 PMIS의 공정 및 공사비 하위모듈을 위한 데이터베이스 테이블의 항목으로 연계된다.

혼합정수계획법에 의한 열병합발전설비의 최적운용 (Optimum Operational Schedule for Cogeneration Systems using the Mixed Integer Programming)

  • 차재상
    • 조명전기설비학회논문지
    • /
    • 제16권5호
    • /
    • pp.75-82
    • /
    • 2002
  • 본 논문에서는 열병합발전설비의 최적운용계획을 위한 새로운 수리적 모델을 제안하였다. 본 논문에서 제안한 알고리즘은 에너지생산량에 따른 비용의 비선형적인 문제를 구간별로 선형화된 함수를 이용하여 혼합정수 계획법으로 모델링하였다. 제안한 수리적 모델은 종래 제시되었던 열병합발전설비의 최적운용을 위한 모델링 기법에서 해결하지 못했던 한계사항을 극복한 것으로서, 더욱 현실에 근접한 최적운용을 위한 모델이 되었다. 또한 본 연구에서는 시뮬레이션을 통해 다양한 사례에 대한 열병합발전설비의 최적 운용계획을 제시함으로서 수리적 모델의 유용성을 입증하였다.

An Optimal Energy Storage Operation Scheduling Algorithm for a Smart Home Considering Life Cost of Energy Storage System

  • Yan, Luo;Baek, Min-Kyu;Park, Jong-Bae;Park, Yong-Gi;Roh, Jae Hyung
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권4호
    • /
    • pp.1369-1375
    • /
    • 2017
  • This paper presents an optimal operation scheduling algorithm for a smart home with energy storage system, electric vehicle and distributed generation. The proposed algorithm provides the optimal charge and discharge schedule of the EV and the ESS. In minimizing the electricity costs of the smart home, it considers not only the cost of energy purchase from the grid but also the life cost of batteries. The life costs of batteries are calculated based on the relation between the depth of discharge and life time of battery. As the life time of battery depends on the charge and discharge pattern, optimal charge and discharge schedule should consider the life cost of batteries especially when there is more than one battery with different technical characteristics. The proposed algorithm can also be used for optimal selection of size and type of battery for a smart home.

적시 생산 방식에서의 주조공정 스케줄링 (Scheduling of a Casting Sequence Under Just-In-Time (JIT) Production)

  • 박용국;양정민
    • 산업경영시스템학회지
    • /
    • 제32권3호
    • /
    • pp.40-48
    • /
    • 2009
  • In this article, scheduling of a casting sequence is studied in a casting foundry which must deliver products according to the Just-in-time(JIT) production policy of a customer. When a foundry manufactures a variety of casts with an identical alloy simultaneously, it frequently faces the task of production scheduling. An optimal casting schedule should be emphasized in order to maximize the production rate and raw material efficiency under the constraints of limited resources; melting furnaces and operation time for a casting machine. To solve this practical problem-fulfilling the objectives of casting the assigned mixed orders for the highest raw material efficiency in a way specified by the customer's JIT schedule, we implement simple integer programming. A simulation to solve a real production problem in a typical casting plant proves that the proposed method provides a feasible solution with a high accuracy for a complex, multi-variable and multi-constraint optimization problem. Employing this simple methodology, a casting foundry having an automated casting machine can produce a mixed order of casts with a maximum furnace utilization within the due date, and provide them according to their customer's JIT inventory policy.

영남대학부속병원에서의 수술중 수혈량의 분석(1987~1988) - 수술전 혈액의뢰지침 - (Analysis of Surgical Blood Use in Operation at YUMC)

  • 김정숙;김경동;김대철
    • Journal of Yeungnam Medical Science
    • /
    • 제7권1호
    • /
    • pp.133-144
    • /
    • 1990
  • 귀중한 혈액을 적절량 수혈함으로써 불필요한 노력과 혈액의 소모를 방지하며, 필요한 수술에 맞추어 소요 혈액량을 파악함으로 해서 혈액공급의 원할을 기할 수 있다. 1987년 1월부터 1988년 12월까지 2년간 영남대학교 의과대학 부속병원에서 수술에 사용된 혈액량을 주요 수술의 방법별로 조사하여, 각 수술에서의 수혈 빈도, 평균수혈량 및 예상 적정수혈량 등을 산정하고, 수혈량과 수혈환자의 나이, 수술전 혈색소치, 체중, 성별, 혈액형과의 관계를 살펴보았으며, 이를 토대로 하여 수술전 의뢰혈액량의 지침이 되도록 하였다.

  • PDF

Li-ion 배터리 충/방전 시스템의 안정적 운영에 관한 연구 (A Study on Stable Operation of Li-ion Battery Charging/Discharging System)

  • 여성대;한철규;조태일;이경량;김성권
    • 한국전자통신학회논문지
    • /
    • 제11권4호
    • /
    • pp.395-402
    • /
    • 2016
  • DC ${\mu}$-Grid 기반의 충/방전 시스템에서 배터리의 동작 변환 시, 망 전압의 fluctuation이 발생하게 되며, 과다한 fluctuation은 충/방전 시스템의 손상 및 고장을 일으킬 수 있다. 따라서 본 논문에서는 DC ${\mu}$-Grid 기반의 충/방전 시스템에서 fluctuation 완화용 커패시터의 적용 및 설계 포인트에 대하여 연구하였다. 컴퓨터 시뮬레이션 결과, 3개의 충전 배터리 set와 5개의 방전 배터리 set의 조건으로 운영되는 DC ${\mu}$-Grid 기반 충/방전 시스템에서 600V/35mF의 초기 값을 갖는 fluctuation 완화용 커패시터를 적용하였을 때 충/방전에 의한 fluctuation을 약 66.3% 감소시킬 수 있었으며, 추가적으로 초기 망 전압 안정화 시 발생하는 fluctuation 또한 약 73% 감소시킬 수 있었다.

공동주택의 에너지 부하량 저감을 위한 블라인드 운영스케줄 검토 (Blind Optimal Operating Schedule for Reviewing the Energy Load Reduction of Apartment House)

  • 마쥔챠오;이준기;김성훈;이갑택;이경희
    • 동력기계공학회지
    • /
    • 제20권4호
    • /
    • pp.63-68
    • /
    • 2016
  • In this study, through portion of the blind control which the user can adjust the deration and the main loads, night for energy reduction during the review of the energy difference between the cooling and heating load periods in order to present the best operation schedules of the blind control. The result, Cooling period, the venetian blind is installed the day or the day and night CASE adjusted to $0^{\circ}$ was identified as optimal for the operating schedule. Heating period, the day, without installed the blinds, the Venetian blind is installed only at night CASE adjusted to $0^{\circ}$ or $45^{\circ}$ angle of the slats, which have been identified as optimal for the operating schedule.

디지털 생산 시뮬레이션 기반의 판넬라인 일정계획지원 시스템 구축 (Construction of Scheduling Support System for Panel Lines by Digital Manufacturing Simulation)

  • 이광국;최동환;한상동;박주용;신종계
    • 대한조선학회논문집
    • /
    • 제43권2호
    • /
    • pp.228-235
    • /
    • 2006
  • Nowadays, digital manufacturing has been known to be very effective method in manufacturing fields. It is aimed to estimate process time, to improve operation efficiency, and to prevent bottleneck processes in advance of real manufacturing. This paper addresses a scheduling support system for panel hues in a shipyard through digital manufacturing simulation. The proposed system supports operators to make better decisions on the shop-floor scheduling in panel lines. It ,would provide a complete schedule that is at least as good as any schedule currently obtained. Furthermore, it can evaluate the operator's schedule by simulating it with 3-dimensional models before the work orders and schedules are released.