• Title/Summary/Keyword: Operation plan

Search Result 2,204, Processing Time 0.037 seconds

Knowledge-based Decision Support System for Process Planning in the Electric Motor Manufacturing (전동기 제조업의 지식기반 공정계획 지원시스템에 관한 연구)

  • Song, Jung-Su;Kim, Jae-Gyun;Lee, Jae-Man
    • IE interfaces
    • /
    • v.11 no.2
    • /
    • pp.159-176
    • /
    • 1998
  • In the motor manufacturing system with the properties of short delivery and order based production, the process plan is performed individually for each order by the expert of process plan after the completion of the detail design process to satisfy the specification to be required by customer. Also it is hard to establish the standard process plan in reality because part routings and operation times are varied for each order. Hence, the production planner has the problem that is hard to establish the production schedule releasing the job to the factory because there occurs the big difference between the real time to be completed the process plan and the time to be required by the production planner. In this paper, we study the decision supporting system for the process plan based on knowledge base concept. First, we represent the knowledge of process planner as a database model through the modified POI-Feature graph. Then we design and implement the decision supporting system imbedded in the heuristic algorithm in the client/server environment using the ORACLE relational database management system.

  • PDF

Energy Efficiency Evaluation of IT based Ship Energy Saving System-(2) : Ship Test Results (IT기반의 선박에너지절감시스템 성능평가 방법-(2) : 해상시험 수행 결과)

  • Yoo, Yun-Ja
    • Journal of Navigation and Port Research
    • /
    • v.40 no.4
    • /
    • pp.165-171
    • /
    • 2016
  • SEEMP (Ship Energy Efficiency Management Plan) has entered into force since 2013 for the reduction of GHG emission of operating ships. SEEMP guidelines include the hardware modification or installation of energy-saving device on ship. It also includes software based energy-saving technology such as optimum routing, speed optimization, etc. Hardware based technologies are not easy to apply to ongoing vessel due to the operational restriction. Therefore, IT based energy-saving technology was applied and its energy efficiency was evaluated using before and after energy-saving system applied voyage data. SEEMP advises a voluntary participation of EEOI (Ship Energy Efficiency Operation Indicator) use as an indicator of ship energy efficiency operation, and those results were also shown to evaluate the improvement efficiency of energy-saving system.

A Study on Objective Functions for the Multi-purpose Dam Operation Plan in Korea (국내 다목적댐 운영계획에 적합한 목적함수에 관한 연구)

  • Eum, Hyung-Il;Kim, Young-Oh;Yun, Ji-Hyun;Ko, Ick-Hwan
    • Journal of Korea Water Resources Association
    • /
    • v.38 no.9 s.158
    • /
    • pp.737-746
    • /
    • 2005
  • Optimization is a process that searches an optimal solution to obtain maximum or minimum value of an objective function. Many researchers have focused on effective search algorithms for the optimum but few researches were interested in establishing the objective function. This study compares two approaches for the objective function: one allows a tradeoff among the objectives and the other does not allow a tradeoff by assigning weights for the absolute priority between the objectives. An optimization model using sampling stochastic dynamic programming was applied to these two objective functions and the resulting optimal policies were compared. As a result, the objective function with no tradeoff provides a decision making process that matches practical reservoir operations than that with a tradeoff allowed. Therefore, it is more reasonable to establish the objective function with no a tradeoff among the objectives for multi-purpose dam operation plan in Korea.

An Analysis on the Pre-Feasibility Evaluation Factors of Activation for Welfare Facilities for the Residents in Apartment Building (공동주택 주민복지시설의 활성화를 위한 사전 타당성 평가요인 분석)

  • Kim, Young-Hoon;Kang, Hyun-Wook;Won, Yoo-Man;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.160-167
    • /
    • 2011
  • An Analysis on the Pre-Feasibility Evaluation Factors of Activation for Welfare Facilities for the Residents in Apartment Building. The adapted research method of selected case five apartment building in D new town and carried out questionnaire survey to residents and user for draw items of feasibility evaluation. Drew items of feasibility evaluation classify as Plan section, Design section, and Operation section and evaluate the weight of each section utilizing analytical hierarchy process (AHP). Depending on the purpose and methods. The results of this study are as follows: Such as Plan section, Composition of Program Facility, User Charge Survey, Arrangement of Program Room were analyzed highest. Such as Design section, Arrangement of Program Room, Circulation planning, Educational Equipment were analyzed highest. And such as Operation section, Operation costs, Operation Plan, Review of Program Facility were analyzed highest.

Research of a Development Plan on the Integrated Weapon System Database based on Integrated Operation and Management System for the Aircraft Development Management (항공기 체계운영관리시스템 기반의 통합무기체계데이터베이스 발전 방안 연구)

  • Chung, Joon-Young;Kim, Cheon-Youn;Kim, Jong-Jin;Lee, Sang-Bum
    • Journal of the Korea Society of Computer and Information
    • /
    • v.12 no.1 s.45
    • /
    • pp.269-276
    • /
    • 2007
  • National defense research and development is trying to develop the weapon system to satisfy users' requirements at minimum cost, high quality and the shortest period. Under integrated database computer environments, development processes and tools have been developed to implement system engineering and concurrent engineering systematically. In the aerospace defense weapon system, the fixed wing development department has developed and operated the integrated operation and management information system based on web technology to manage efficiently the technical information generated by the R&D process. When this system was applied to the existing R&D project for the aircraft weapon system, it proved and verified its efficiency. In this paper, we describe the future development plan of an integrated R&D framework and an integrated weapon system database based on the integrated operation and management information system which are able to centrol the technical information of KF-X, UAV(Unmanned Aerial Vehicles) and UCAV(Unmanned Combat Aerial Vehicles) programs. We also describe an interoperability and integration plan with WISEMAN which will be operated soon in our research Institute.

  • PDF

A Study on the Operation Plan of Multi-layered Defense Interceptor Missiles considering the Korean Missile Defense System and the Strategic Strike System (한국형 미사일 방어체계 특성과 전략적 타격체계 효과를 고려한 다층방어 요격미사일 운용방안 연구)

  • Seo, Minsu;Ma, Jungmok
    • Journal of the Korea Society for Simulation
    • /
    • v.30 no.1
    • /
    • pp.31-42
    • /
    • 2021
  • In order to respond to the ballistic missile threat of North Korea, the ROK military is constructing a multi-layered defense that can minimize the vulnerability of single-layered defense. Accordingly, it is necessary to study an operation plan which can maximize the intercept rate of a multi-layered defense system. And to study the operation plan of the Korean missile defense system, it must be considered that the operational environment of the Korean military and the effects of the strategic strike system. Therefore, this study proposes a simulation model that reflects the characteristics of the Korean missile defense system and analyzes four interceptor missile operation plans. The simulation result indicates that a high intercept rate can be achieved in various situations by comprehensively considering the ballistic missile threat estimate, interceptor missile reserve, and the strategic strike system effect.

A Study on Quality Improvement Method for Manufacturing Process Plan (제조공정계획의 품질개선기법에 관한 연구)

  • Kim, In-Ho
    • Korean Journal of Computational Design and Engineering
    • /
    • v.13 no.3
    • /
    • pp.235-242
    • /
    • 2008
  • This paper proposes a method for improving the process plan quality by use of dimensional tolerances. Dimensioning and tolerancing plays a key role in manufacturing process plan because the final part must ensure conformance with the dimensions and tolerances in its drawing. As a first step for the improvement of process plan quality, two resultant tolerances in design and process plan should be compared each other, and so a tolerance chart is used for acquisition and comparison of the two tolerances. In addition to two kinds of design and manufacturing tolerances, operational sequences or paths for the resultant dimension and tolerance are additionally recognized for measuring the quality of process plan quantitatively. Rooted tree is applied to find the related paths for the manufacturing resultant tolerances. A quality coefficient is defined by the components of two tolerances and their relations, the paths related to manufacturing resultant tolerances and the difficulty of an operation. In order to improve the quality of manufacturing process plan, the paths that two kinds of tolerances are the same or different in the rooted tree are recognized respectively and a method for tolerance rearrangement is developed. A procedure for improving the quality is suggested by combining the coefficient and the tolerance rearrangement method. A case study is applied to illustrate the efficiency of improvement method.

A Study on the Evaluation of Strategic Plan of Academic Libraries - Focused on the Cases of National University Libraries in Korea - (대학도서관 전략적 계획의 평가에 대한 연구 - 국내 국립대학교 도서관 사례를 중심으로 -)

  • Lee, Yong-Jae
    • Journal of Korean Library and Information Science Society
    • /
    • v.46 no.4
    • /
    • pp.551-574
    • /
    • 2015
  • This study analysed the long-term plans of academic libraries to raise their usefulness at universities in Korea. Especially, this study focused the evaluation of strategic plans, and drew an evaluation guideline based on the evaluation methods of strategic plan of academic library in foreign countries. This study checked the long-term development plans of academic libraries in Korea, and evaluated how much the core elements of strategic plan are reflected in the long-term plans. As the result, it has come out that there are more characteristics of operation plans as routine services than those of strategic plan as long-term view which contributes to the development of libraries in the long-term plans of academic libraries in Korea.

Vegetation Restoration Plan for a Coastal Area through Ecosystem Conservation Fund Return Project: - focus on the Dalmaji-gil area, Haeundae-Gu, Busan Metropolitan City. - (생태계보전협력금 반환사업을 통한 해안 식생복원계획 - 부산 해운대구 달맞이 고개 일대를 대상으로 -)

  • Yoon, sung-young
    • Journal of Environmental Science International
    • /
    • v.28 no.2
    • /
    • pp.191-201
    • /
    • 2019
  • This study suggested a vegetation restoration plan for a coastal area where the ecosystem conservation fund return project, targeting the whole area of Dalmaji-gil, located in Haeundae, Busan. After distinguishing if it would be a proper site for the operation of the ecosystem conservation fund return project by analyzing the ecological environment, human environment, and the current status of land owners, the target species for vegetation restoration was determined, and the facilities and programs were selected in accordance with the spatial division of the biosphere reserve. The basic direction is as follows. First, is the expansion of green space and the securement of life habitats downtown. Second, is the conservation of core areas by separating the conserved area from the space for use. Third, is the establishment of ecological resting space and the reinforcement of an ecological educational programs. The significance of this study is to suggest a vegetation restoration plan of a coastal area, fully utilizing the existing vegetation of the subject area, by suggesting the land use and flow planning, environmental improvement (vegetation restoration) plan, life habitats establishment plan, planting plan, and hydrologic plan, facilities, maintenance, and monitoring plan based on the basic direction. This study would provide useful basic data for ecosystem conservation and restoration in the Korean Peninsula, surrounded by the ocean on three sides.

Method for increasing rail operation capacity of capital high speed rail with expanding the high speed railway service (고속철도 서비스 확대를 위한 수도권 고속철도 확충 방안 고찰)

  • Roh, Beung-Guk;Kim, Young-Bea;Shin, Dong-Won
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1254-1268
    • /
    • 2009
  • In 1998, because of the economic crisis called IMF Crisis in Korea, Kyungbu high speed railway project could run by modifying the original plan to open it as a 1st phase only by utilizing the existing railway lines from Seoul to Siheung and the other one from Daegu to Pusan. The modified plan includes that the line from Daegu to Pusan will be constructed as a second phase in next time. Starting railway operation with the changed plan, the combined application operation of high speed rail, passenger rail and freight rail was caused partly from Seoul to Siheung to run into capital area. As a result, the opinion for additional railway line construction is insisted continuously because the operation volume of passenger rail was forced to be reduced, the service quality of it was decreased and it became difficult to add new high speed services. Moreover, with regard to Honam high speed rail, the new construction plan of station in Kangnam metro area as a basement station for starting from Suseo was changed to the plan of turning out at Osong because of the economic effectiveness and this kept resident people in Kangnam metro area and southern Kyungki area unable to get the opportunity of high speed rail service benefit. After beginning of Kyungbu high speed railway operation, national transportation system developments are focused on high speed rail, and when the second phase construction of Kyungbu high speed rail, beginning operation of Kyungjeon line, Jeolla line double track construction, Honam high speed rail in 2014, is completed, the demand for high speed rail will be increased and it is unavoidable to make Kwangmyung station as a basement station and to reduce the number of passenger rail operation. At this moment, it is valuable to consider adding the railway line capacity in capital area to improve the transferring service for citizen who live in area without Kyungbu high speed rail station and to expand the service area from Kangbuk to Kangnam and southern Kyungki area. Accordingly, in this paper, the effective rail operation method, facility plan and the other issue to be reviewed for increasing capital high speed railway lines will be mentioned.

  • PDF