• 제목/요약/키워드: Operation plan

검색결과 2,204건 처리시간 0.028초

우편운송망 성능평가를 위한 시뮬레이션 시스템 개발 (Development of the Postal Transportation Network Simulation System)

  • 박상용;이태한;최지영;이석
    • 산업공학
    • /
    • 제18권4호
    • /
    • pp.454-464
    • /
    • 2005
  • In Postal logistics, the efficient design and operation of transportation network is very important issue. But, it is hard to operate the postal transportation network flexibly according to the change of mail volume. In Korea post, a transportation plan is pre-determined and the transportation of mail is performed through the routes in the plan. When the routes cannot transport all mail, temporary vehicles are used. In the postal transportation, it is important to make a good transportation plan and to manage the plan efficiently. But the change of transportation plan is not a simple work because hundreds of vehicles and persons are related to the plan. So, a methodology to check the effect of the change of the transportation plan in advance is required. In this paper, we develop a simulation model to evaluate the performance of a postal transportation plan. We implement the simulation model and develop an information system including user interface for managing data and simulation results. We apply our simulation model and system to the real change of transportation plan.

Development of Tunnel Asset Management (TAM) Program

  • Hamed Zamenian;Dae-Hyun (Dan) Koo
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.576-582
    • /
    • 2013
  • Typical highway infrastructure systems include roadway pavement, drainage systems, tunneling, and other hardware components such as guardrails, traffic signs, and lighting. Tunnels in a highway system have provided significant advantages to overcoming various natural challenges including crossing underneath bodies of water or through mountainous areas. While only a few tunnel failure cases have been reported, the failure rate is likely to increase as these assets age and because agencies have not emphasized tunneling asset management. A tunnel system undergoes a deterioration life cycle pattern that is similar to other infrastructure systems. There are very few agencies in the United States implementing comprehensive tunnel asset management programs. While current tunnel asset management programs focus on inspection, maintenance, and operation safety, there is an increasing need for the development of a comprehensive life cycle tunnel asset management program. This paper describes a conceptual framework for a comprehensive tunnel asset management program. The framework consists of three basic phases including a strategic plan, a tactical plan, and an operational plan to provide better information to the decision makers. The strategic plan is a basic long term approach of tunnel asset management. The tactical plan determines specific objectives and the operational plan actually applies asset management objectives in practice. The information includes operational condition, structural condition, efficiency of the system, emergency response, and life cycle cost analysis for tunnel capital improvement project planning.

  • PDF

사고대비물질 취급자를 위한 비상대응계획 작성 프로그램 연구 (A Study of Emergency Plan Making Programs for Personnel Handling Accident Precaution Chemicals)

  • 김성범;조문식;박춘화;윤이;황경섭;양상용
    • 한국재난관리표준학회지
    • /
    • 제3권2호
    • /
    • pp.27-32
    • /
    • 2010
  • 자체방제계획서는 위험물질의 등급, 주위환경의 피해, 사고대응계획 등으로 구성된 체계적인 관리제도이다. 자체 방제계획서 작성지원 프로그램의 개발 목적은 사고를 예방하고, 사고를 제어할 수 있도록 안전관리 시스템을 각 시설에 제공하는 것이다. 이 프로그램은 MSDS(Material Safety Data Sheet), SOP(Standard Operation Procedure), ERP(Emergency Response Plan) 등 일반적인 안전관련 자료를 포함하고 있다. 자체방제계획서는 위험 확인, 평가, 예방 계획, 안전 분석 등으로 구성되어있다. 또한, 자체방제계획서 작성지원 프로그램은 정부 또는 관련 기관이 중소기업에서 발생 가능한 사고를 관리하는데 유용하다.

  • PDF

오피스 건물의 실내 조명 유형 및 계획특성에 관한 연구 (A Study on the Lighting Plan Characteristics of Office Buildings)

  • 이연수;하미경
    • 한국실내디자인학회논문집
    • /
    • 제22권1호
    • /
    • pp.47-54
    • /
    • 2013
  • For the office work environmental design, the importance of the design management is increased to improve operation efficiency as well as the aesthetic environmental implementation of the function today. Lighting is a required element ineffective operation environment. It has become more important for the aesthetic, economic, and practical reasons, to consider the luminous environment and the lighting of visual tasks separately. When the brightness is insufficient, productivity deteriorates, and the layout of the lighting located by mistake causes the fatigue of eyes. Productivity rises to office in a large number of studies so as satisfaction is low in general in the dark office, and to be bright. Therefore the purpose of this research is to suggest the right direction of lighting design of office building area. 11newly renovated office buildings are selected for this luminous environment research. We could conclusions as following through this research. First, it was planned brighter than the recommended lighting level in the most space. It shows that the accurate lighting design criteria is needed in order to achieve proper lighting environment. Second, the application of the LED lighting fixtures is continuously increased in the recent office lighting environment. It is explained that it is applied for reasons of the electrical energy reduction and the maintenance efficiency with the long life time. Third, the consideration of the lighting plan for the difference of working types is not enough. with various communication configuration through an independent plan, and the effective lighting plan that appropriateness preparation design and energy saving area vailable must be applied. Fourth, the lighting environment of the lobby needs a specialized lighting plan as are presentative space of the building.

제주지역 크루즈터미널 계획 및 운영 실태에 관한 연구 (A Study on the Planning and Operation Status of Cruise Terminal in Jeju)

  • 박정근
    • 한국농촌건축학회논문집
    • /
    • 제20권1호
    • /
    • pp.85-92
    • /
    • 2018
  • Although Jeju is the best cruise Secondary port in Northeast Asia, currently there are no dedicated cruise terminals. The port international passenger terminal opened in 2015 has a ferry terminal for offshore passengers and a cruise passenger function. Jeju Island is therefore constructing a cruise only terminal with the aim of opening in 2018 to meet the growing passenger demand at the Seoguipo civilian and public ports along with construction of a naval base at Gangjeong Port in Seogwipo City. It also plans to build cruise docks and cruise terminals in the Jeju New Port according to the Jeju port construction basic plan. However, during the construction and planning process of cruise terminals in Jeju, the adequacy of the terminal size is being debated and the immigration facilities are being operated. Therefore, the study analyzed the size of terminals and operation of immigration facilities appropriate for cruise passenger demand by investigating the status of cruise related facilities and operation in Jeju area. Based on this, the Commission hopes to explore the rational direction of the cruise terminal plan to revive the cruise industry in Jeju and provide high quality service to cruise passengers.

EPR 신규 대상품목의 장기 재활용목표율 재산정에 관한 연구 (A Study on Recalculation of the Long-Term Recycling Rate of New EPR Target Items)

  • 이희남;최윤정
    • 대한안전경영과학회지
    • /
    • 제13권4호
    • /
    • pp.193-199
    • /
    • 2011
  • In the past annual recycling obligation rate calculation of Extended Producer Responsibility (EPR) system, it was difficult to operate the system efficiently, because responsible producers passively participated in the scheme only bent on achieving annual obligation without long-term plan. Thus, a new scheme of long-term recycling obligation rate began to be established every five year from 2008 in order to give the basis for the notice of annual specific operation standard and recycling obligation, thereby helping responsible producers to make a preparation with a plan and giving expectation of active operation of the scheme. However, in the operation of long-term recycling target program, while the development of prediction models and the evaluation for existing items has been conducted in various ways, applications for a new target items and the evaluation are quite insufficient. Therefore, in this study, problems in implementing long-term recycling goal of new target items will be examined, and more objective and rational long-term recycling rate calculation and the operation standard will be proposed. Thus, the long-term recycling target will play a role as a pacemaker to steadily improve the recycling performance of target items, and responsible producers will be expected to increase the achievement with the realistic capacity.

선각 내업 가공작업의 공정계획과 일정계획의 통합화 방안 연구 (Integrated Process Planning and Scheduling for Machining Operation in Shipbuilding)

  • 조규갑;오정수;김영구
    • 한국정밀공학회지
    • /
    • 제14권10호
    • /
    • pp.75-84
    • /
    • 1997
  • This paper describes the development of an integrating method for process planning and scheduling activities for block assembly in shipbuilding. A block is composed of several steel plates and steel sections with the predetermined shapes according to the ship design. The parts which constitute the block are manufac- tured by cutting and/or bending operations, which are termed as machining operation in this paper. The machining operation is the first process for block assembly which influences the remaining block assembly processes. Thus process planning and scheduling for machining operation to manufacture parts for block are very important to meet the assembly schedule in the shipyard. An integrating method for process plan- ning and scheduling is developed by introducing the concept of distributed process planning and scheduling composed of initial planning, alternative planning and final planning stages. In initial planning stage, nesting parts information and machining emthods are generated for each steel plate. In alternative plan- ning stage, machine groups are selected and workcenter dispatching information is generated. In final planning stage, cutting sequences are determined. The integrated system is tested by case study. The result shows that the integrated system is more efficient than existing manual planning system.

  • PDF

초고속 통신망에서 IP와 ATM 번호의 연동방안 (A study on the numbering plan between IP and ATM on KII)

  • 김성한;황건;오행석;최준균
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 1999년도 추계종합학술대회 논문집
    • /
    • pp.791-794
    • /
    • 1999
  • A principle requirement and technical standardization for numbering plan is required to B-lSDN network planning. Especially, internetworking high speed network with other conventional networks like PSTN, PSDN and ISDN is generally considered for integration. This paper describes the numbering plan for operation between internet and ATM. And based on the ITU-U specification, numbering plan is compared between conventional and high speed networks. Additionally, numbering plan for ATM-forum is analyzed.

  • PDF