• Title/Summary/Keyword: Operation Set Time

Search Result 536, Processing Time 0.027 seconds

Spatio- Temporal Join for Trajectory of Moving Objects in the Moving Object Database

  • Lee Jai-Ho;Nam Kwang-Woo;Kim Kwang-Soo
    • Proceedings of the KSRS Conference
    • /
    • 2004.10a
    • /
    • pp.287-290
    • /
    • 2004
  • In the moving object database system, spatiotemporal join is very import operation when we process join moving objects. Processing time of spatio-temporal join operation increases by geometric progression with numbers of moving objects. Therefore efficient methods of spatio-temporal join is essential to moving object database system. In this paper, we propose spatio-temporal join algorithm with TB-Tree that preserves trajectories of moving objects, and show result of test. We first present basic algorithm, and propose cpu-time tunning algorithm and IO-time tunning algorithm. We show result of test with data set created by moving object generator tool.

  • PDF

A Study on the Tension of a Purseline in the Process of Catch of the Purse Seine Fishing Methods-I -Model Experiment on the Tension of a Purseline by Net Shapes- (선망어법의 어획과정에 있어서 죔줄의 장력-I -망형별 죔줄의 장력에 관한 모형실험-)

  • 박정식
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.35 no.1
    • /
    • pp.1-10
    • /
    • 1999
  • The north-west sea area of Cheju Island is where originate two layer current in the summer season. The case of the fishing operations in this sea area is almost impossible for normal expansion of the net gear for shooting net, and is happened to be frequent occasions for rise of tension suddenly in purseline by changes of the net shapes in the operation. Therefore, the safety of the operations is often obstructed by the above mentioned. In connection with the above, model experiments on the purse seine in the circulating water tank was carried out in comparison and analysis on the changes of tension in the pruseline by deformation of purse seine in the sea area of two layer current. THe results obtained are as follows;In the case of the required time for pursing of 20 minutes in the no current set, the increasing curve for tension of purseline can be expressed as:Y=0.0004x3+0.0098x2+0.3000x(r=0.9989)where Y is tension(metric tons) of a purseline, x is required time(minutes) for pursing. And, the maximum value of tension in this time was an increase of 31.3 percent at 15 minutes, and was a decrease of 30.3 percent at 30 minutes than that of 20 minutes.When the bottom margin of net is held on the position in velocity of 0.5 knot at three-eighths of net in the bottom current to the net height, the maximum tension of the required time for pursing of 30 minutes in tight set and loose set were decrease of 29.5 percent and 28.7 percent respectively than that of 20 minutes.The work load during the required time for pursing of 20 minutes were calculated 5.79×106 kgf·m in no current set, 7.89×106 kgf·m in tight set and 5.15×106 kgf·m in loose set, therefore it was an increase of 22.3 percent in tight set, and was a decrease of 11.1 percent in loose set than that of the no current set. Where tight set and loose set is a range of the bottom current with velocity of 0.5 knot at three-eighths of net to the net height.

  • PDF

STUDY ON THE REAL TIME VOLTAGE-REACTIVE POWER CONTROL USING THE FUZZY THEORY (FUZZY 이론을 이용한 전압.무효전력의 순서제어에 관한 연구)

  • Song, K.Y.;Kim, S.Y.;Cho, J.W.
    • Proceedings of the KIEE Conference
    • /
    • 1990.11a
    • /
    • pp.231-234
    • /
    • 1990
  • This paper shows real-time control technique of voltage-reactive power using the fuzzy theory. Here, major benefits of applying the fuzzy set theory as follow. First, heuristic knowledge of operator has been used in the operation and control of power system. Second, difficulties in traditional multi-objective numerical solution methods have been solved. Also, to achieve optimizing process on the voltage-reactive power control conventional search method have been used.

  • PDF

Formulation and optimization of cubic polynomial joint trajectories for industrial robots (산업용 로보트를 위한 3차 다항식 조인트궤적의 구성과 최적화)

  • 김태산;배준경;박종국
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1988.10a
    • /
    • pp.92-97
    • /
    • 1988
  • The path planning is done at the joint level. Cubic spline functions are used for constructing joint trajectories for industrial robots. For N-joint robot, Cartesian knots are transformed into N sets of joint displacements, with one set for each joint. For industrial application the speed of operation affects the productivity. An algorithm is developed to schedule the time intervals between each pair of adjacent knots such that the total traveling time is minimized subject to the physical constraints on joint velocties acceleration and jerks.

  • PDF

Real-Time Two Hands Tracking System

  • Liu, Nianjun;Lovell, Brian C.
    • Proceedings of the IEEK Conference
    • /
    • 2002.07c
    • /
    • pp.1491-1494
    • /
    • 2002
  • The paper introduces a novel system of two hands real-time tracking based on the unrestricted hand skin segmentation by multi color systems. After corer-based segmentation and pre-processing operation, a label set of regions is created to locate the two hands automatically. By the normalization, template matching is used to find out the left or right hand. An improved fast self-adaptive tracking algorithm is applied and Canny filter is used for hand detection.

  • PDF

Estimation of the Setting Time of the High Flowing Concrete Using Durometer (Durometer를 이용한 고유동 콘크리트의 응결시간 판정 방법)

  • Han, Min-Cheol;Shin, Yong-Sub;Han, In-Deok
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.9
    • /
    • pp.143-150
    • /
    • 2019
  • The purpose of this study was to propose how to determine the setting time related to the determination of the surface finish working time of the concrete using a Durometer, which is used as a rubber hardness meter. Two different types of Durometer were used to measure the setting time of the concrete. High flowing concrete with 40% of water to binder ratio was fabricated maintaining $600{\pm}100mm$ of slump flow. The test results indicated that the application of the Durometer resulted in a high correlation with the penetration resistance tester in both mortar and concrete. When measuring the setting time of the concrete, with properly used with Durometer, evaluation of the setting time of the concrete can be available. Therefore, it is thought that the measurement of the final set of the durometer C type can be useful to decide the limit time of the finishing operation and the time of the rejuvenation of the curing process by measuring the finishing set at 40 HD in the case of the initial set and 10 HD in the case of D type.

Scheduling of flexible manufacturing systems with the consideration of tool set-up times (공구셋업시간을 고려한 유연생산시스템의 스케쥴링)

  • Yim, Seong-Jin;Lee, Doo-Yong
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.22 no.1
    • /
    • pp.90-101
    • /
    • 1998
  • This paper presents a scheduling method that uses Petri net modeling and heuristic search to handle the tool setup. In manufacturing systems, a tool is attached to a particular machine to process a particular operation. The activity to attach a tool to a particular machine and detach the tool from the machine requires time. The processing time of operations varies according to the attached tool and the machine used. The method proposed in this paper uses Petri net to model these characteristics and applies a search algorithm to the reachability graph of the Petri net model to generate an optimal or near-optimal schedule. New heuristic functions are developed for efficient search. The experimental results that show the effectiveness of the proposed method are presented.

An Efficient Bit Stream Instruction-set for Network Packet Processing Applications (네트워크 패킷 처리를 위한 효율적인 비트 스트림 명령어 세트)

  • Yoon, Yeo-Phil;Lee, Yong-Surk;Lee, Jung-Hee
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.45 no.10
    • /
    • pp.53-58
    • /
    • 2008
  • This paper proposes a new set of instructions to improve the packet processing capacity of a network processor. The proposed set of instructions is able to achieve more efficient packet processing by accelerating integration of packet headers. Furthermore, a hardware configuration dedicated to processing overlay instructions was designed to reduce additional hardware cost. For this purpose, the basic architecture for the network processor was designed using LISA and the overlay block was optimized based on the barrel shifter. The block was synthesized to compare the area and the operation delay, and allocated to a C-level macro function using the compiler known function (CKF). The improvement in performance was confirmed by comparing the execution cycle and the execution time of an application program. Experiments were conducted using the processor designer and the compiler designer from Coware. The result of synthesis with the TSMC ($0.25{\mu}m$) from Synopsys indicated a reduction in operation delay by 20.7% and an improvement in performance of 30.8% with the proposed set of instructions for the entire execution cycle.

A Case study on the plan for the ESC integrating optimized train operation system for Fire & power failure accident in subway (도시철도 화재$\cdot$단전시 최적 열차운행을 위한 통합운영체계 구축방안에 관한 연구)

  • Kim Young-Wook;Choi Se-Wan;Kim Young-Kyu
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1185-1192
    • /
    • 2004
  • Recently heavy traffic is getting worse because increasing population of transportation in urban area. In order to solve this problem. subway is realized with high speed, high density, highly efficiency. When fire accident happened in Dae-Gu subway in February 2003, there happened loss of people and lots of damage because of not being able to control even though fire alarm which was set up in the station rang. This thesis has constructed a simulation integrating operation system using a Database construction, operating program analysis in order to build up the most efficient train operation system. The result of simulation integrating operation system with emergency virtual situation like station and train fire, train failure, power line failure, all trains running on the rail were secured safety by train operation control system. With integrating operation of each train control system, train system, power system, machine facility system, the most efficient integrating operation system should have been constructed at the time the subway fire and power failure broke out.

  • PDF

An Estimation method for Characteristic Parameters in a Low Frequency Signal Transformed by High Frequency Signals (고주파 신호에 의하여 변형된 저주파신호에서의 특성변수 추정 기법)

  • Yoo, Kyung-Yul
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.51 no.2
    • /
    • pp.86-88
    • /
    • 2002
  • An estimation method for the characteristic parameters in the low frequency signal is proposed in this paper. A low frequency signal is assumed to be modulated or distorted by high frequency terms. The algorithm proposed in this paper is designed to select set of local maximums in a successive manner, hence it is denoted as the iterative peak picking(IPP) algorithm. The IPP algorithm is operating in the time domain and is using only the comparison operation between two neighboring samples. Therefore, its computational complexity is very low and the delay caused by the computation is negligible, which make the real-time operation possible with economic hardware. The proposed algorithm is verified on the pitch estimation of speech signal and blood pulse estimation.