• Title/Summary/Keyword: Operation Set Time

Search Result 531, Processing Time 0.034 seconds

An AT2 Optimal Reconfigurable Mesh Algorithm for The Constrained Off-line Competitive Deletion Problem (제한된 오프라인 경쟁삭제 문제를 해결하기 위한 AT2 최적의 재구성 가능 메쉬 알고리즘)

  • Lee, Kwang-Eui
    • The KIPS Transactions:PartA
    • /
    • v.9A no.2
    • /
    • pp.225-230
    • /
    • 2002
  • The constrained off-line competitive deletion problem is a simple form of the set manipulation operations problem. It excludes the insertion operation from the off-line competitive deletion problem. An optimal sequential algorithm and a CREW PRAM algorithm which runs $O(log^2nloglogn)$ time using O(n/loglogn) processors were already presented in the literature. In this paper, we present a reconfigurable mesh algorithm for the constrained off-line competitive deletion problem. The proposed algorithm is executed in a constant time on an $n{\times}n$ reconfigurable mesh, and the result is $AT^2$ optimal.

A Study of Over Voltage Ground Relay Operation Status at Opening of No-load Charged Cable (무부하 충전케이블 개방시 잔류전압에의한 과전압계전기 동작현상 연구)

  • Kim, Yeong-Han;Choi, Jong-Hyuck;Yoon, Ki-Seob
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.185-187
    • /
    • 2000
  • Fault current is flowed into 154/23kV M. Tr when line-to-ground fault occurs in power system. NGR(Neutral Grounded Reactor) is set up in order to prevent M.Tr fault by limiting magnitude of fault currents. Here, disconnection of NGR causes voltage increase by L-C resonance and line-to-ground fault in an unearthed system results in voltage increase at healthy phases. So Over Voltage Ground Relay(OVGR) is used for tripping M.Tr. Also, buses at second phases of M.Trs are all connected with section circuit breakers closed for the purpose of parallel operation and load shedding. In case of speciality buses are comprised of power cable in part for GIS connection. When no-load charged cable or bus is open by a section CB, unbalanced voltage charged on the bus is induced. Also discrepant opening time for circuit breakers on different phases gives rise to unbalanced zero sequence voltage. It was observed that this zero sequence voltage detected in the 22.9kV P.T (Potential Transformer for bus) mal-operated 59GT and tripped M.Tr. The zero sequence voltage of which vanishing time is longer than relay operating time came out by EMTDC simulation. Also, it was shown that the voltage waves of actual test are similar to those of simulation. On the basis of above results, R-C circuit complement on the relay without any effect on a power system made operating time of the relay longer than vanishing time of distorted waves. Consequently, operating time of the relay was delayed and magnitude of distorted waves was decreased by increasing time constant of the relay.

  • PDF

Acceleration of Building Thesaurus in Fuzzy Information Retrieval Using Relational products

  • Kim, Chang-Min;Kim, Young-Gi
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 1998.06a
    • /
    • pp.240-245
    • /
    • 1998
  • Fuzzy information retrieval which uses the concept of fuzzy relation is able to retrieve documents in the way based on not morphology but semantics, dissimilar to traditional information retrieval theories. Fuzzy information retrieval logically consists of three sets : the set of documents, the set of terms and the set of queries. It maintains a fuzzy relational matrix which describes the relationship between documents and terms and creates a thesaurus with fuzzy relational product. It also provides the user with documents which are relevant to his query. However, there are some problems on building a thesaurus with fuzzy relational product such that it has big time complexity and it uses fuzzy values to be processed with flating-point. Actually, fuzzy values have to be expressed and processed with floating-point. However, floating-point operations have complex logics and make the system be slow. If it is possible to exchange fuzzy values with binary values, we could expect sp eding up building the thesaurus. In addition, binary value expressions require just a bit of memory space, but floating -point expression needs couple of bytes. In this study, we suggest a new method of building a thesaurus, which accelerates the operation of the system by pre-applying an ${\alpha}$-cut. The experiments show the improvement of performance and reliability of the system.

  • PDF

Ground Software Validation Test for Wheel Off-loading of COMS (통신해양기상위성의 휠오프로딩 지상국 소프트웨어 검증시험)

  • Park, Young-Woong;Yang, Koon-Ho
    • Aerospace Engineering and Technology
    • /
    • v.9 no.2
    • /
    • pp.51-56
    • /
    • 2010
  • There are two main software in COMS ground station at the normal mode operation - stationkeeping and wheel off-loading. In this paper, ground software validation test for wheel off-loading is summarized and described. The wheel off-loading was performed the design change from E3000 heritage and analyzed. The wheel off-loading of ground software has two part; one is wheel off-loading management for parameters change at the thruster set switching time and the other is wheel off-loading set-point being sent to satellite for the reference momentum.

Optimization Method for Patient Placement by Floor in Elderly Care Hospital for Evacuation Safety (피난안전성을 위한 요양병원의 층별 환자배치에 대한 최적화방안)

  • Lee, Hong-Sang;Kong, Ha-Sung
    • Journal of the Korea Safety Management & Science
    • /
    • v.22 no.3
    • /
    • pp.43-51
    • /
    • 2020
  • This study analyzed the appropriate placement method by floor for evacuating all occupants during the nighttime through evacuation simulation. The analysis results are as follows. First, when non-self evacuating patients were placed on the first floor, 266 patients and 6 workers were found to be evacuated after 460 seconds. This result shows that it is meaningful to place non-self evacuating patients on the lower floor with a time that is faster than 540 seconds, which is an evaluation criterion set using life Safety standards for human. This result is a time faster than the evaluation criteria of 540 seconds, which is set using the life safety standards, and it can be confirmed that it is meaningful to place non-self evacuating patients on the lower floor. Next, as a result of placing non-self evacuating patients from the first floor to the fourth floor, it was found that evacuation of all occupants required 460 seconds for the first floor, 834 seconds for the second floor, 1,508 seconds for the third floor, and 1,915 seconds for the fourth floor. These results indicate that the placement of non-self evacuating patients on the rest of the floors, except for the first floor, can lead to dangerous results in excess of 540 seconds, which is a flashover time. As a result, it is necessary to place non-self evacuating patients on a lower floor for safe evacuation. The study has limitations except for comparative analysis of changes in evacuation time due to changes in the number of workers at eldery care hospitals and situations in which fire-fighting facilities such as sprinkler facilities operated. It is necessary to study the evacuation time linked to the operation of the fire-fighting facilities and the evacuation time according to the change in the number of workers in the future.

A Novel Instruction Set for Packet Processing of Network ASIP (패킷 프로세싱을 위한 새로운 명령어 셋에 관한 연구)

  • Chung, Won-Young;Lee, Jung-Hee;Lee, Yong-Surk
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.34 no.9B
    • /
    • pp.939-946
    • /
    • 2009
  • In this paper, we propose a new network ASIP(Application Specific Instruction-set Processor) which was designed for simulation models by a machine descriptions language LISA(Language for Instruction Set Architecture). This network ASIP is aimed for an exclusive engine undertaking packet processing in a router. To achieve the purpose, we added a new necessary instruction set for processing a general ASIP based on MIPS(Microprocessor without Interlock Pipeline Stages) architecture in high speed. The new instructions can be divided into two groups: a classification instruction group and a modification instruction group, and each group is to be processed by its own functional unit in an execution stage. The functional unit was optimized for area and speed through Verilog HDL, and the result after synthesis was compared with the area and operation delay time. Moreownr, it was allocated to the Macro function ana low-level standardized programming language C using CKF(Compiler Known Function). Consequently, we verified performance improvement achieved by analysis and comparison of execution cycles of application programs.

Design of RF coupler for KIRAMS-13;Korea Institute of Radiological & Medical Sciences-13

  • Jung, In-Su;An, Dong-Hyun;Kim, Yu-Seok;Yang, Tae-Gun;Kim, Jea-Hong;Jang, Hong-Seok;Hong, Bong-Hwan;Lee, Min-Yong;Hong, Sung-Seok;Chai, Jong-Seo;Oh, Bong-Hun
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.2203-2205
    • /
    • 2003
  • KIRAMS-13, the first medical cyclotron developed by domestic technique, is used to produce radio-isotope such as $^{18}F$ whose life time is relatively short through test operation. For high-power operation of charged particle accelerators, the power coupler must withstand enormous stresses due to charging induced by high RF power passing through. High-power RF testing with peak power in excess of 30kW has been performed on prototype power coupler for KIRAMS-13 normal conducting cavities. CST MICROWAVE STUDIO(CST MWS) is used for fundamental RF Design, and power coupler is manufactured according to fundamental power coupler design requisite. The qualification of the couplers has occurred for the time being only in a limited set of conditions as the available RF system and control instrumentation are under improvement.

  • PDF

Study of Target Tracking Algorithm using iterative Joint Integrated Probabilistic Data Association in Low SNR Multi-Target Environments (낮은 SNR 다중 표적 환경에서의 iterative Joint Integrated Probabilistic Data Association을 이용한 표적추적 알고리즘 연구)

  • Kim, Hyung-June;Song, Taek-Lyul
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.23 no.3
    • /
    • pp.204-212
    • /
    • 2020
  • For general target tracking works by receiving a set of measurements from sensor. However, if the SNR(Signal to Noise Ratio) is low due to small RCS(Radar Cross Section), caused by remote small targets, the target's information can be lost during signal processing. TBD(Track Before Detect) is an algorithm that performs target tracking without threshold for detection. That is, all sensor data is sent to the tracking system, which prevents the loss of the target's information by thresholding the signal intensity. On the other hand, using all sensor data inevitably leads to computational problems that can severely limit the application. In this paper, we propose an iterative Joint Integrated Probabilistic Data Association as a practical target tracking technique suitable for a low SNR multi-target environment with real time operation capability, and verify its performance through simulation studies.

Automation Program for Drawing and Examination of Locking Sheet (연동도표 작성 및 검토 자동화 프로그램)

  • Chang, Seung-Ho;Yoo, Keun-Su;Han, Chang-Woo;Lee, Young-Soo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1285-1293
    • /
    • 2008
  • Locking sheet is to display the contents of interlocking equipment for safe train drive in stations. It is being used as a basic information for interlocking equipment and for route control condition and the discussion for train operation between related parties. In spite of importance of this, there was no other way except depending on the work by hands from each stage(drawing, examination, discussion, approval) due to non-existing any tool. It is written it takes 30days from drawing to approval by procedures. However, it is required over the days in real time due to argument of each party. Furthermore on drawing of locking sheet, special conditions applied in accordance with situations of each station occasionally are different depending on the person in charge. Therefore, it is urgent to make up Logic Tree to accept special conditions of all stations. Automation Program for Drawing and Examination of Locking Sheet is to improve inefficient interlocking operation which was operated by hands in accordance with custom as automated system. The target of this program is to minimize the processing time and potential errors by personal work and set up standards for Logic Tree of special condition.

  • PDF

Anomaly Detection and Diagnostics (ADD) Based on Support Vector Data Description (SVDD) for Energy Consumption in Commercial Building (SVDD를 활용한 상업용 건물에너지 소비패턴의 이상현상 감지)

  • Chae, Young-Tae
    • Journal of Korean Institute of Architectural Sustainable Environment and Building Systems
    • /
    • v.12 no.6
    • /
    • pp.579-590
    • /
    • 2018
  • Anomaly detection on building energy consumption has been regarded as an effective tool to reduce energy saving on building operation and maintenance. However, it requires energy model and FDD expert for quantitative model approach or large amount of training data for qualitative/history data approach. Both method needs additional time and labors. This study propose a machine learning and data science approach to define faulty conditions on hourly building energy consumption with reducing data amount and input requirement. It suggests an application of Support Vector Data Description (SVDD) method on training normal condition of hourly building energy consumption incorporated with hourly outdoor air temperature and time integer in a week, 168 data points and identifying hourly abnormal condition in the next day. The result shows the developed model has a better performance when the ${\nu}$ (probability of error in the training set) is 0.05 and ${\gamma}$ (radius of hyper plane) 0.2. The model accuracy to identify anomaly operation ranges from 70% (10% increase anomaly) to 95% (20% decrease anomaly) for daily total (24 hours) and from 80% (10% decrease anomaly) to 10%(15% increase anomaly) for occupied hours, respectively.