• 제목/요약/키워드: Operating and maintenance

검색결과 799건 처리시간 0.029초

A Study on Life Cycle Cost on Railway Locomotive Systems

  • Egamberdiev, Bunyod;Lee, Kookchan;Lee, Jongwoo;Burnashev, Shamil
    • International Journal of Railway
    • /
    • 제9권1호
    • /
    • pp.10-14
    • /
    • 2016
  • Life cycle cost analysis is compulsively required for the system operation. System operation costs are consisted of acquisition, operation, maintenance and so on. In the beginning of the system planning, we need to take into account of various costs following the system operating. To implement LCC, we need to analyze system life cycle to identify all costs during system life. The costs can be divided into three parts. The first part is purchasing cost, the second for operating cost and the last for disposal cost. The second operating cost can be decomposed of operating cost included labor, energy consumption cost for system running, maintenance costs to keep systems healthy, delay cost caused from maintenance and hazard cost, and so on. In this paper, we carried out for railway locomotives which operate over more 30years and which cost about 10 million USD. We decompose the life cycle of the locomotives and break down the locomotives into subsystems to require maintenance or not, and subsystems to need energy or not. We showed how to decide optimal locomotives through cost identification and system breakdown.

일반철도 유지보수 합리화를 위한 궤도틀림 기준 연구방향 (A Study of Track Irregularity Standard for Rational Track Maintenance)

  • 김수정;이병혁;이두재;엄종우
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1624-1630
    • /
    • 2011
  • Currently the train operating environment to affect track irregularity is changed rapidly such as speed-up, linear improvement and rolling stack upgrade. The recent track maintenance criteria of track irregularity was quoted from past Japan's, and the needs of revision of criteria are increased because of the rapid change in train operating environment. In case of enhance the track irregularity criteria, it secure driving safety and riding comfort but maintenance cost are increase. And also decrease ballast durability by frequent corrective work. In case of mitigate the criteria, it decrease driving safety and riding comfort, but save the maintenance cost. The study for enacting rational criteria did not carry out so far. In this study, survey the domestic and international track irregularity and case study for track irregularity inspection results and maintenance history for guideline of enacting irregularity criteria study.

  • PDF

비파괴기술을 이용한 발전설비 예측정비 기법 도입과 적용 (Adaptation and Implementation of Predictive Maintenance Technique with Nondestructive Testing for Power Plants)

  • 정계조;정남근
    • 비파괴검사학회지
    • /
    • 제30권5호
    • /
    • pp.497-502
    • /
    • 2010
  • 발전회사는 설비 신뢰성과 이용율 저하없이 운영 및 정비비용을 낮추라는 요구를 받고 있다. 설비 운영자는 이러한 요구사항에 부합하기 위하여 현재의 정비기술에 대하여 다시 평가를 하고 있다. 정비비용을 낮추고 효율적인 운영 기간을 늘리기 위하여 설비의 최적 운영상태를 확인할 수 있는 비파괴기술을 이용하여 예측정비 기법을 적용할 수 있다. 예측정비 프로그램에는 내부운영 프로그램과 외부프로그램 그리고 혼용 프로그램이 있으며, 현명한 신뢰 (smart thrust)개념을 사용하면 예측정비 프로그램을 성공적으로 적용할 수 있다.

송전계통을 고려한 계통운용자의 발전기 예방정비계획 알고리즘에 관한 연구 (An Algorithm for Generator Maintenance Scheduling Considering Transmission System)

  • 한석만;신영균;김발호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제54권7호
    • /
    • pp.352-357
    • /
    • 2005
  • In competitive electricity markets, the System Operator (SO) coordinates the overall maintenance schedules when the collective maintenance schedule reported to 50 by Gencos not satisfy the specified operating criteria, such as system reliability or supply adequacy. This paper presented a method that divides generator maintenance scheduling of the 50 into a master-problem and a sub-problem. Master-problem is schedule coordination and sub-problem is DC-optimal power flow. If sub-problem is infeasible, we use the algorithm of modifying operating criteria of master-problem. And, the 50 should use the open information only, because the information such as cost function of a generator and bidding Price is highly crucial for the strategies of profit maximization.

지상 기동 및 고정 환경하 고장률 특성 분석 (Failure Rate Characteristics Analysis under Ground Mobile and Ground Fixed Environments)

  • 윤희성;정다운;윤종성;이승헌
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제11권3호
    • /
    • pp.293-303
    • /
    • 2011
  • Reliability Prediction using MIL-HDBK-217F has some restrictions due to its one modeling basis. One of the restrictions is caused by selecting one operating environment of a system, which is chosen regardless of its detailed conditions, e.g., external impact and vibration. Especially, an equipment, which is installed on a mobile vehicle though its movement is quasi-static, is controversial to designate its environment as ground mobile($G_M$), rather than ground fixed($G_F$). In this paper, failure rates were compared, which are computed using several moving time rates to total operating time. RiAC-HDBK-217Plus was used as the basic calculation model. In addition, $G_F$ conditioned failure rate was evaluated by comparing with that under $G_M$ environment but fixed state.

신규원전의 설계특성 기반 정비효과성감시 프로그램 개발 (Development of Maintenance Effectiveness Monitoring Program based on Design Characteristics for New Nuclear Power Plant)

  • 염동운;현진우;송태영
    • 한국압력기기공학회 논문집
    • /
    • 제8권1호
    • /
    • pp.25-32
    • /
    • 2012
  • Korea Hydro & Nuclear Power Co. (KHNP) has developed and implemented the maintenance effectiveness monitoring (MR) programs for the operating nuclear power plants. The MR program is developed by reflecting design characteristics of the operating nuclear power plants to monitor the plant performance for improving the safety and reliability. Recently, KHNP has built a new nuclear power plant, and developed the MR program to establish the advanced maintenance system by reflecting unique design characteristics based on the OPR1000 standard model. So, the MR program developed in this study has another characteristics in comparison with the OPR1000 standard model, and we will verify the suitability of the MR program through evaluating initial performance of the plant. The safety and reliability of the new plant will be improved by developing and implementing the MR program.

송전제약과 등가운전시간을 고려한 장기 예방정비계획 최적화에 관한 연구 (Optimization of Long-term Generator Maintenance Scheduling considering Network Congestion and Equivalent Operating Hours)

  • 신한솔;김형태;이성우;김욱
    • 전기학회논문지
    • /
    • 제66권2호
    • /
    • pp.305-314
    • /
    • 2017
  • Most of the existing researches on systemwide optimization of generator maintenance scheduling do not consider the equivalent operating hours(EOHs) mainly due to the difficulties of calculating the EOHs of the CCGTs in the large scale system. In order to estimate the EOHs not only the operating hours but also the number of start-up/shutdown during the planning period should be estimated, which requires the mathematical model to incorporate the economic dispatch model and unit commitment model. The model is inherently modelled as a large scale mixed-integer nonlinear programming problem and the computation time increases exponentially and intractable as the system size grows. To make the problem tractable, this paper proposes an EOH calculation based on demand grouping by K-means clustering algorithm. Network congestion is also considered in order to improve the accuracy of EOH calculation. This proposed method is applied to the actual Korean electricity market and compared to other existing methods.

정기보전제도에서 응급수리제품에 대한 무상수리 적용의 비용분석 모델 (A Cost Analysis Model of Minimal-Repairable Items in Free Replacement under the Periodic Maintenance Policy)

  • 김재중;김원중;조남호
    • 산업경영시스템학회지
    • /
    • 제19권39호
    • /
    • pp.89-98
    • /
    • 1996
  • This paper is concerned with cost analysis model in free -replacement policy under the periodic maintenance policy The free-replacement policy with minimal repairable item is considered as follows; in a manufacturer's view point operating unit is periodically replaced, if a failure occurs between minimal repair and periodic maintenance time, unit is remained in a failure condition. Also unit undergoes minimal repair at failures in minimal-repair interval. Then total expected cost per unit time is calculated according to maintenance period Tin a viewpoint of consumer's. The expected costs are included repair cost and usage cost: operating, fixed, minimal repair and loss cost. Numerical example is shown in which failure time of item has beta distribution.

  • PDF

지하철 유지관리 계측의 기술 및 제도 개선방안 연구 (Case Study on Technology and Regulation Improvement of Subway Maintenance Monitoring)

  • 우종태;김홍석
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 봄 학술발표회 논문집
    • /
    • pp.303-308
    • /
    • 2000
  • By means of analyzing of monitoring technology and monitoring regulation based on maintenance monitoring system installed in subway tunnel section, it needs monitoring system, development of operating program, monitoring analyzing system and development of analysis method, establishment of maintenance monitoring standard specification, and performance of responsible monitoring supervision for applying to subway monitoring maintenance effectively in future. It requires specialized monitoring and legislation of monitoring subcontract, improvement of monitoring work contract method, establishment the standard payment of monitoring, and effective calibration and correction of monitoring system in the plan of improving monitoring regulation.

  • PDF

대학 건물에 설치된 가스엔진구동 히트펌프(GHP) 실외기의 조닝 계획에 따른 운전 특성과 경제적 효과 (The Economic Effects and Operating Characteristics of the Outdoor Unit in Accordance with Zoning Plan of Gas Engine Driven Heat Pump Installed in the University Building)

  • 박강현;김수민
    • 설비공학논문집
    • /
    • 제24권1호
    • /
    • pp.70-76
    • /
    • 2012
  • The purpose of this study is to analyze of the operating characteristics of the Gas engine driven Heat Pump(GHP) and to reduce maintenance costs through the most Economical plan. As the zoning modifications that have economic effects were confirmed. Applications should be made with a similar purpose of the space. The combination of a modified space has led to reduced operating hours of the outdoor unit. The reduction of the outdoor unit operating hours, reducing maintenance costs accordingly. When analyzed at six years have elapsed, the amount of savings through zoning modifications is more than an additional construction cost. During the design phase, cost-effective operation of the GHP is required for the proper zoning plan.