• Title/Summary/Keyword: Once-through Boiler

Search Result 39, Processing Time 0.023 seconds

Dynamic Simulation of the Water-steam System in Once-through Boilers - Sub-critical Power Boiler Case - (관류보일러 물-증기 계통의 동적 시뮬레이션 - 아임계 동력보일러 사례 -)

  • Kim, Seongil;Choi, Sangmin
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.41 no.5
    • /
    • pp.353-363
    • /
    • 2017
  • The dynamics of a water-steam system in a once-through boiler was simulated based on the physics-based modeling approach, representing the system in response to large load change or scale disturbance simulations. The modeling considered the mass, energy conservation, and momentum equation in the water pipe and the focus was limited to the sub-critical pressure region. An evaporator tube modeling was validated against the reference data. A simplified boiler system consisting of economizer, evaporator, and superheater was constructed to match a 500 MW power boiler. The dynamic response of the system following a disturbance was discussed along with the quantitative response characteristics. The dynamic response of the boiler system was further evaluated by checking the case of an off-design point operation of the feedwater-to-fuel supply ratio. The results re-emphasized the significance of controlling the feedwater-to-fuel supply ratio and additional design requirements of the water-steam separator and spray attemperator.

A Water-Wall Model of Supercritical Once-Through Boilers Using Lumped Parameter Method

  • Go, Geon;Moon, Un-Chul
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.6
    • /
    • pp.1900-1908
    • /
    • 2014
  • This paper establishes a compact and practical model for a water-wall system comprising supercritical once-through boilers, which can be used for automatic control or simple analysis of the entire boiler-turbine system. Input and output variables of the water-wall system are defined, and balance equations are applied using a lumped parameter method. For practical purposes, the dynamic equations are developed with respect to pressure and temperature instead of density and internal energy. A comparison with results obtained using APESS, a practical thermal power plant simulator developed by Doosan Heavy Industries and Construction, is presented with respect to steady state and transient responses.

Introduction and Current Status of Ultra Supercritical Circulating Fluidized Bed Boiler (초초임계 순환유동층 보일러 기술 소개 및 현황)

  • Lee, Si-Hun;Lee, Jong-Min
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.2
    • /
    • pp.211-221
    • /
    • 2016
  • The increase of world's population and economic development are the keys drivers behind growing demand for energy. Especially the demand for electricity would eventually result in an increase of coal usage. Therefore ultra supercritical circulating fluidized bed boiler has been developed as solutions of economic eco-friendly technologies for coal and of increasing supplies of low grade fuels. Ultra supercritical circulating fluidized bed boiler has an once through type of steam cycle different from drum type in subcritical circulating fluidized bed boiler. Also, the duplication of a proven commercial module with 100-300 MWe subcritical circulating fluidized bed might be the key for design of 500~800 MWe ultra supercritical circulating fluidized bed boiler. After 2017, ultra supercritical circulating fluidized bed boiler might become standard model over subcritical circulating fluidized bed boiler. Therefore, this paper will help you to understand ultra super critical circulating fluidized bed (USC-CFB) through describing the background, status and prospect of the CFB technology.

A Study on Development of Nonlinear Low Order Models for an Once-through Type Boiler (관류형 보일러의 비선형 저자모델 개발에 관한 연구)

  • Lee, Jae-Yong;Chae, Seog;Bien, Zeungnam;Yoon, Myoung-Joong
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.36 no.1
    • /
    • pp.58-67
    • /
    • 1987
  • By use of the real recorded data obtained from a power plant, nonlinear low-order state space models are developed for an once-through type power plant boiler. In order to understand the boiler dynamics and to use for the back-up controller design, the unknown model parameters have been estimated using the nonlinear estimation technique, i.e. Extended Kalman Filter method. It is shown that the simulation results coincide with the measurement data within 5% relative error range, which are acceptable from a back-up controller design point of view.

  • PDF

Premixed VIStA Burner for an Once-Through Type Boiler (관류보일러를 위한 예혼합 VIStA 버너 개발)

  • Ahn, Joon;Kim, Hyouck-Ju;Choi, Kyu-Sung
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.1013-1018
    • /
    • 2008
  • Vortex Inertial Staged Air (VIStA) burner for an once-through type boiler has been restored to the original premixed type to reduce nitrogen oxide (NOx) emission. The premixed version yields additional de-NOx effect by 20 ppm. The flame is formed closer to the wall at the 1st stage combustion chamber compared with the non-premixed one. The combustion characteristics are more sensitive to the air distribution for the premixed type, which necessitates proper optimization.

  • PDF

A Study on Efficient Operations of Industrial Boilers in Korea (우리나라 산업용 보일러의 효율적 운용에 관한 연구)

  • 조흥곤
    • Journal of the Korean Professional Engineers Association
    • /
    • v.35 no.4
    • /
    • pp.68-73
    • /
    • 2002
  • Almost every industrial plant or building has their own boiler systems, so boilers are often called "kinds of social infrastructures"In Korea, We have many indistinct problems on efficient operations of industrial boiler systems. In this paper, to elevate thermal operation efficiency and to diminish air pollutions of the boilers, especially in urban area, at present, "The muliple installation systems of small type once through boiler(gas fired)" are suggested.

  • PDF

Expert System for ABC Tuning of Once-Through Bboiler

  • Matsumura, S.;Kojima, Y.;Tozaki, T.;Shirasaka, Y.;Suzuki, M.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1989.10a
    • /
    • pp.744-748
    • /
    • 1989
  • A newly developed Expert System (ES) for the tuning of thermal power plant control equipment is described. The system is furnished with the rules for controller tuning which were obtained by analysis and arranging the data and knowledge from the experts or tuning records. Based on these rules, automatic tuning or setting of the control parameters is performed in real-time base. The performance of the test equipment, a combination of ES and a boiler simulator, was examined in the automatic tuning test for steam pressure, steam temperature, and load controllers of a constant-pressure once-through boiler model. It was confirmed from the test results that the system is quite promising for future application to actual plants, since the tuning results obtained by the proposed system were similar to those by tuning experts.

  • PDF

A comparison of steam turbine control systems according to adoption of turbine bypass system (바이패스 시스템 체용 유무에 따른 증기 터빈제어 비교)

  • Choi, I.K.;Kim, J.A.
    • Proceedings of the KIEE Conference
    • /
    • 2000.07d
    • /
    • pp.2342-2344
    • /
    • 2000
  • Many years ago, most of thermal power plants built in this country were of subcritical pressure, of medium or small size, of constant pressure operation, of drum type steam generator. But, nowadays, almost all of them were of high efficiency, of supercritical pressure, of great capacity(about 500MW), of sliding pressure operation, of once through type steam generator. Presently built once through boiler introduces turbine bypass systems to variable pressure operation which eliminates unexpected materials in boiler tube during startup, minimizes fuel loss by short startup period, eventually improves total efficiency and power system stability

  • PDF

Development of Dynamic Simulation Software for Power Plant and its Application to Once-Through Boiler (플랜트 동특성 해석용 소프트웨어 개발 및 초임계압 관류형 보일러에의 적용)

  • Lee, Ki-Hyun;Lee, Dong-Su;Cho, Chang-Ho
    • Proceedings of the KSME Conference
    • /
    • 2000.11b
    • /
    • pp.656-661
    • /
    • 2000
  • In the recent trend of electric power supply market, a variable pressure operation supercritical once-through steam generator is highlighted as a thermal power plant for cycling load because of its superiority in load regulation. Almost all thermal power plants of the future are expected to be variable pressure operation supercritical once-through units. APESS(Advanced Plant Engineering & Simulation System) is a dynamic simulation software for power plant which is under being developed by Korea Heavy Industries & Construction Co., Ltd. This paper present the introduction of APESS and the result of simulation for variable pressure operation supercritical once-through steam generator.

  • PDF

Automatic adjustment of feedforward signal in boiler controllers of thermal power plants

  • Egashira, Katsuya;Nakamura, Masatoshi;Eki, Yurio;Nomura, Masahide
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1995.10a
    • /
    • pp.83-86
    • /
    • 1995
  • This paper proposes an auto-tuning method of feedforward signal in boiler control of thermal power plants by using the neural network. The neural network produces an optimal feedforward signal by tuning the weights of the network. The weights are adapted effectively by using the teaching signal of PI control output. The proposed method was evaluated based on a detailed simulator which expressed non-linear characteristics of the 600 MW actual thermal power plant at load chaning operations, showed effectiveness in the learning of the weights of the neural network, and gave an accurate control performance in the temperature control of the system. Through the evaluation, the proposed method was proved to be effectively applicable to the actual thermal plants as the automatic adjustment tool.

  • PDF