• Title/Summary/Keyword: On-site performance test

Search Result 455, Processing Time 0.031 seconds

Site Calibration for the Wind Turbine Performance Evaluation (풍력발전기 성능실증을 위한 단지교정 방법)

  • Nam, Yoon-Su;Yoo, Neung-Soo;Lee, Jung-Wan
    • Journal of Industrial Technology
    • /
    • v.22 no.A
    • /
    • pp.49-57
    • /
    • 2002
  • The accurate wind speed information at the hub height of a wind turbine is very essential to the exact estimation of the wind turbine power performance testing. Several methods on the site calibration, which is a technique to estimate the wind speed at the wind turbine's hub height based on the measured wind data using a reference meteorological mast, are introduced. A site calibration result and the wind resource assessment for the Taekwanryung test site are presented using a one-month wind data from a reference meteorological mast and a temporal mast installed at the site of wind turbine. From this analysis, it turns out that the current location of the reference meteorological mast is wrongly determined, and the self-developed codes for the site calibration are working properly. Besides, an analysis on the uncertainty allocation for the wind speed correction using site calibration is performed.

  • PDF

A Study on the Problem and Improvement of Fire Detector Test in the Field Inspection (화재감지기 현장점검의 문제점 및 개선방안에 관한 연구)

  • Cha, Ha-Na;Ok, Kyung-Jae;Kim, Shi-Kuk;Lee, Chun-Ha;Jee, Seung-Wook
    • Fire Science and Engineering
    • /
    • v.22 no.4
    • /
    • pp.50-53
    • /
    • 2008
  • This study has been conducted for the purpose of considering the problems expected when checking the smoke detector at site and how to improve the smoke detector. We have conducted this study focused on checking the problems expected upon site inspection and finding out the way of improving the site inspection by analyzing the reliability and performance of instrument used upon site inspection. The test results show that some problems exist in the reliability and performance of instrument used for the site inspection of smoke detector way of inspecting the inspection instrument.

Site Calibration for the Wind Turbine Performance Evaluation

  • Nam, Yoon-Su;Yoo, Neung-Soo;Lee, Jung-Wan
    • Journal of Mechanical Science and Technology
    • /
    • v.18 no.12
    • /
    • pp.2250-2257
    • /
    • 2004
  • The accurate wind speed information at the hub height of a wind turbine is very essential to the exact estimation of the wind turbine power performance testing. Several methods on the site calibration, which is a technique to estimate the wind speed at the wind turbine's hub height based on the measured wind data using a reference meteorological mast, are introduced. A site calibration result and the wind resource assessment for the TaeKwanRyung test site are presented using three-month wind data from a reference meteorological mast and the other mast temporarily installed at the site of wind turbine. Besides, an analysis on the uncertainty allocation for the wind speed correction using site calibration is performed.

Design of Test Site for Large-Scale Wind Turbine Performance Verification (초대형 풍력터빈 시험을 위한 실증시험장 설계)

  • Sang-Man Kim;Tae-Yoon Jeong;Chae-Joo Moon
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.18 no.3
    • /
    • pp.397-404
    • /
    • 2023
  • This paper designs a wind turbine test site based on international regulations for the certification of wind turbine prototypes. The maximum height of the meteorological mast installed at the test site is 140m, and power facilities capable of testing up to three wind turbines of 5MW or more are installed. The weather resources measured at the mast can be recorded and analyzed using a monitoring system. Wind turbine manufacturers can use this test site during the certification period, and the installed wind turbines can be used for continuous power generation projects. Therefore, this test site can provide fundamental data for measuring the long-term performance and durability of wind turbines, which can be used to improve models or develop new wind turbines.

A Study on the Site Acceptance Test(SAT) Evaluation Algorithm of Energy Storage System using Li-ion Battery (리튬이온전지를 이용한 전기저장장치의 SAT용 성능평가 알고리즘에 관한 연구)

  • Park, Jea-Bum;Kim, Byung-Ki;Kim, Mi-Sung;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.6
    • /
    • pp.26-37
    • /
    • 2019
  • Recently, standardization of installation progress and technology of site acceptance test(SAT) for energy storage system(ESS) are being required due to performance of ESS depending on working condition and environment even though the quality and safety of each component of ESS is guaranteed. And also, it has been required to perform not only performance testing by H/W equipments but also performance verification by S/W tool, in order to more accurately and reliably validate the performance of the ESS in advanced countries. Therefore, this paper proposes evaluation algorithm for SAT to evaluate performance of ESS and presents modeling of SAT test equipment for ESS by using PSCAD/EMTDC. Furthermore, 30[kW] scaled portable test equipments is implemented based on the proposed algorithm and modeling. From the various simulation and test results, it is confirmed that performance of ESS related to characteristics of capacity and Round-trip efficiency, Duty-cycle efficiency, low voltage ride through(LVRT) and Anti-islanding can be accurately evaluated and that the simulation results of PSCAD/EMTDC are identical to test results of 30[kW] test equipment.

A Power Quality Monitoring of The Grid-connected Wind Turbine in Daegwallyeong Test Site (계통 연계 대관령 풍력실증단지에서의 전력 품질 모니터링)

  • Kwon H. J.;Kim K. H.;Jang S. I.;Yoo N. S.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.1513-1515
    • /
    • 2004
  • This paper describe the power quality monitoring results of the grid-connected wind turbine generator in Daegwallyeong Test Site. The power quality monitoring for grid-connected wind turbine generators are important to verify their performance as the grid-connected generators. In order to measure the impacts on the grid of wind turbine generator and evaluate the performance by analyzing electrical parameters, we equipped the power quality monitoring system in the real field of the Daegwallyeong test site. The developed monitoring system gathers information by remote access through the internet. The monitoring results and the detail explanation for the developed wind turbine monitoring system is presented in the study.

  • PDF

A Study on the On-site Flame Resistant Inspection Method by X-ray Fluorescence Spectrometer (X-선 형광분석기를 이용한 현장방염검사방법에 관한 연구)

  • Kim, Hwang-Jin;Lee, Sung-Eun
    • Fire Science and Engineering
    • /
    • v.30 no.5
    • /
    • pp.124-129
    • /
    • 2016
  • According to the current law, on-site flame resistant-treated interior decorations should pass the flame resistant performance test through a 45 degree combustion test from the district fire department. Although a 45 degree combustion test is the most accurate method for determining the flame resistant performance, it can be unreliable when tested on unauthorized samples. To avoid unauthorized sampling, this study suggests on-site flame resistant inspection by X-ray fluorescence spectrometer. Ten types of flame resistant paint were spread on plywoods and MDFs and the components were analyzed by X-ray fluorescence spectrometer. As a result, due to a difference amounts of substances in each paint, each flame resistant paints showed its own characteristic spectrum and the contents of each substance could be determined. On-site flame resistant inspections can be used efficiently when institutional procedures are created.

A Study of Factors Influencing the Range of 81mm HE shells One-Shot systems based on CART Regression analysis (CART 회귀분석 기반 일회성 시스템 81mm 고폭탄 사거리에 영향을 미치는 요인 분석)

  • Myung Sung Kim;Jun Hyeok Choi;Young Min Kim
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.19 no.1
    • /
    • pp.107-113
    • /
    • 2023
  • For one-shot systems such as 81mm high-explosive ammunition, research on performance prediction is insignificant due to research manpower infrastructure and lack of interest and difficulties in securing field data, which can only be done by special task workers. In order to evaluate the actual range of ammunition, the storage ammunition reliability evaluation checks the range by firing actual ammunition through a functional test. Test evaluation is a method of extracting a sample from the population, launching it, and recording the results accordingly. As a result of these tests, the range, which is an indicator of ammunition performance, can be measured differently according to meteorological factors such as temperature, atmospheric pressure, and humidity according to the location of the test site. In this study, various environmental factors generated at the test site and storage period analyze the correlation with the range, which is the performance of ammunition, and analyze the priority of importance for each factor and the numerical standards that environmental factors affect range. Through this, a new approach to one-shot system performance prediction was presented.

Effect of Caregiver's Role Improvement Program on the Uncertainty, Stress, and Role Performance of Caregivers with Hospitalized Children (보호자역할증진 프로그램이 입원아동 보호자의 불확실성, 스트레스 및 돌보기 수행에 미치는 효과)

  • Jeong, Eun;Kwon, In Soo
    • Child Health Nursing Research
    • /
    • v.23 no.1
    • /
    • pp.70-80
    • /
    • 2017
  • Purpose: In this study a caregiver's role improvement program was developed and tested to identify the effect on uncertainty, stress, and role performance of caregivers with hospitalized children. Methods: The design of this study was a quasi-experimental study with a nonequivalent control group and a non-synchronized design. Thirty-three caregivers were assigned to the experimental group and 33 to the control group. Data were collected from March 5 2016 to April 10 2016. For the experimental treatment, each individual was given on-site education with situated learning (given 30 minutes each, for 2 sessions), and self-repetition learning activities were performed from the e-book. Data were analyzed using t-test, ${\chi}^2-test$, Fisher's exact test, paired t-test, and independent t-test. Results: The level of uncertainty and stress decreased, and role performance level improved for these caregivers with hospitalized children. Conclusion: The findings of this study show that using on-site education through situated learning and self-repetition learning with an e-book as in the caregiver's role improvement program is an effective intervention. Therefore, utilizing the caregiver role improvement program developed in this study is recommended as an effective intervention for caregivers of hospitalized children.

In-Situ Behaviors of Steel Frame-type Retaining Walls (조립식 강재틀 옹벽의 현장적응성 분석)

  • 박종배;임해식;박용부;나승민;정형식
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.06a
    • /
    • pp.93-101
    • /
    • 2003
  • Steel frame-type retaining walls(SFRW) are constructed by on site bolting of prefabricated steel frames and internal filling of materials such as rocks with the size of 150-300mm. Easy & fast construction, superior drainage performance and structural performance to rigorous site conditions are some of the merits of applying the SFRW to various construction sites. After the development of the structural details, a test construction of SFRW, with the height of 6m and 30m in length, was carried out at an apartment site. After completion, several months of monitoring was carried out on the structure to check displacement, tilting, settlement, soil pressures and drainage characteristics. The results of the structural behavior of SFRW along with its construction methods are presented in the paper.

  • PDF