• Title/Summary/Keyword: On-site monitoring

Search Result 1,210, Processing Time 0.032 seconds

Stochastic Estimation of Voltage Sags Based on Voltage Monitoring (전압 모니터링에 기반한 순간전압강하 확률적 추계 방법)

  • Son, Jeongdae;Park, Chang-Hyun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.10
    • /
    • pp.1271-1277
    • /
    • 2018
  • This paper deals with a voltage sag assessment based on a voltage monitoring program. The voltage sag performance at a specific site can be evaluated by analyzing voltage monitoring data recorded for a long time period. Although an assessment based on voltage monitoring is an effective way to understand voltage sag performance at a measurement site, the statistical confidence of voltage sag frequency estimation heavily depends on the length of monitoring period and the number of recorded events. Short monitoring period and insufficient recorded data can not provide a reliable assessment result. This paper proposes a compensation assessment method by combining a computer simulation approach for in case that monitoring period and data are not enough for a valid assessment.

A STUDY ON DEVELOPMENT OF MONITORING & ASSESSMENT MODULE FOR SITES

  • Park, Se-Moon;Yoon, Bong-Yo;Kim, Dae-Jung;Park, Joo-Wan;Kim, Chang-Lak
    • Nuclear Engineering and Technology
    • /
    • v.38 no.6
    • /
    • pp.575-584
    • /
    • 2006
  • As the development of total management systems for sites along with site environmental information is becoming standard, the system known as the Site Information and Total Environmental database management System (SITES) has been developed over the last two years. The first result was a database management system for storing data obtained from facilities, and a site characterization in addition to an environmental assessment of a site. The SITES database is designed to be effective and practical for use with facility management and safety assessment in relation to Geographic Information Systems. SITES is a total management program, which includes its database, its data analysis system required for site characterization, a safety assessment modeling system and an environment monitoring system. It can contribute to the institutional management of the facility and to its safety reassessment. SITES is composed of two main modules: the SITES Database module (SDM) and the Monitoring & Assessment (M&A) module [1]. The M&A module is subdivided into two sub-modules: the Safety Assessment System (SAS) and the Site Environmental Monitoring System (SEMS). SAS controls the data (input and output) from the SITES DB for the site safety assessment, whereas SEMS controls the data obtained from the records of the measuring sensors and facilities. The on-line site and environmental monitoring data is managed in SEMS. The present paper introduces the procedure and function of the M&A modules.

A MODEL OF CONSTRUCTION WORKER'S PERCEPTIONS ON ELECTRONIC MONITORING

  • Bill L.P. Lee;Stephen Mak
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.190-195
    • /
    • 2009
  • With the growth of information and communication technologies adoption in construction projects, it could be anticipated that more property owners and construction firms will attempt to use electronic gears and gadgets for site monitoring or surveillance purposes. As the construction workers may be the major group of project team members being monitored, from managerial perspectives and for ethical reasons, it is essential to investigate their degree of acceptance on site monitoring systems. Indeed studies on office workplace monitoring suggest that a monitoring system could shape or control the behaviors of employees. With adequate refinements, their research models could be applicable in the construction industry. This paper presents a model for analyzing the antecedences that affect workers' acceptance level on electronic monitoring, and investigating if there is any behavioral change.

  • PDF

MONITORING CONSTRUCTION PROCESSES: A SOLUTION USING WIRELESS TECHNOLOGY AND ONLINE COLLABORATIVE ENVIRONMENT

  • Sze-wing Leung;Stephen Mak;Bill L.P. Lee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.50-60
    • /
    • 2007
  • The endeavor of this paper focuses on designing a monitoring system to provide a cost-effective solution on quality assurance for construction projects. The construction site monitoring system integrates a long-range wireless network, network cameras, and a web-based collaborative platform. The users of the system could obtain the most updated status of construction sites, such as behaviors of workers, project progress, and site events anywhere with Internet connectivity. It was carefully configured in order to maintain the reliability under the reactive conditions of the construction sites. This paper reports the architecture of the monitoring system and reviews the related technologies. The system has been implemented and tested on a construction site and promising results were obtained.

  • PDF

Application of single-well push-drift-pull tests using dual tracers (SF6 and salt) for designing CO2 leakage monitoring network at the environmental impact test site in Korea

  • Kim, Hong-Hyun;Lee, Seong-Sun;Ha, Seung-Wook;Lee, Kang-Kun
    • Geosciences Journal
    • /
    • v.22 no.6
    • /
    • pp.1041-1052
    • /
    • 2018
  • A single-well push-drift-pull tracer test using two different tracers ($SF_6$ and salt) was performed at the Environmental Impact Test (EIT) site to determine suitable locations for monitoring wells and arrange them prior to artificial $CO_2$ injection and leak tests. Local-scale estimates of hydraulic properties (linear groundwater velocity and effective porosity) were obtained at the study site by the tracer test with two tracers. The mass recovery percentage of the volatile tracer ($SF_6$) was lower than that of the non-volatile tracer (salt) and increased drift time may make degassing of $SF_6$ intensified. The $CO_2$ leakage monitoring results for both unsaturated and saturated zones suggest that the $CO_2$ monitoring points should be located near points at which a high concentration gradient is expected. Based on the estimated hydraulic properties and tracer mass recovery rates, an optimal $CO_2$ monitoring network including boreholes for monitoring the unsaturated zone was constructed at the study site.

A Stability Case on the Deep Rock Excavation Site in Urban Area by Automatic Monitoring System (도심지 대심도 암반굴착공사에서의 자동계측 활용에 의한 붕괴방지 사례)

  • Kim, Tae-Seob;Jo, Nam-Shin;Jung, Chang-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1433-1437
    • /
    • 2010
  • The deep excavation work in Korean downtown is almost excuted near by existing structures and utility lines because of the diminution of available yard for construction. So, it was required more and more that the accurate control of displacement on the earth retaining system for minimizing the popular complaint and the damage from constructional accident. Automatic monitoring system is adopted in fracture zone for real time monitoring. In addition, Face mapping is carried out on the face of fracture zone according to excavation sequence. As the result of automatic monitoring system and face mapping, we was able to take the necessary reinforcement and changing excavation method within suitable time. This paper is informed about a stability case on the deep rock excavation site with fracture zone in urban area by automatic monitoring system.

  • PDF

The Flow rate estimation of CSOs using EC Data (전기전도도를 이용한 CSO의 유량 추정)

  • Choi, Weon-Suk;Song, Chang-Soo
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.25 no.5
    • /
    • pp.751-757
    • /
    • 2011
  • The monitoring technique based on electrical conductivity (EC) can provide researchers with some advantages in maintenance management and is cost-effective as compared with existing CSOs monitoring. In this study, the flow rate estimation using EC data was executed in two sites where storm overflow chamber had installed. In the result of A-site, R2 of second order multinomial between dilution ratio of EC and observed flow rate was showed the range of 0.68 ~ 0.77. And $R^{2}$ of B-site was 0.62 ~ 0.81. On the other hand, cumulative frequency of A-site was 43.4 ~ 52.2% in the relative error level of under 20%. And B-site was 10.1 ~ 46.5%. The flow rate estimation formula was improved through consideration of some parameters including antecedent dry days and rainfall duration. And difference between estimated flow rate and observed flow rate in total rainfall event was very small.

Opportunities for construction site monitoring by adopting first personal view (FPV) of a drone

  • Kim, Seungho;Kim, Sangyong
    • Smart Structures and Systems
    • /
    • v.21 no.2
    • /
    • pp.139-149
    • /
    • 2018
  • Understanding the current status of a construction project is necessary to achieve successful on-site management. Real-time information delivery is a major concern for construction industry practitioners in order to expedite decisions and discussions. We propose the use of a first personal view (FPV) system of a quadcopter drone as a tool for monitoring on-site status and communicating between construction participants. The most important function of the drone FPV system is its ability to visually monitor construction site situations in real time. An on-site management system process is developed, verified, and applied to several construction work tasks after determining factors that affect efficient construction management. The proposed system is expected to assist the construction manager in achieving high efficiency.

Development of a Wind Turbine Monitoring System using LabVIEW (LabVIEW를 이용한 풍력발전기 모니터링 시스템 개발)

  • 남윤수;김형기;유능수;이정완
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.20 no.5
    • /
    • pp.92-98
    • /
    • 2003
  • A wind turbine monitoring system is essential equipment fur the performance evaluation and mechanical load analysis of a wind turbine. A monitoring system using LabVIEW is developed in this study. This system monitors signals from a meteorological mast, wind turbine generator, and tower. The discrete signals which are sampled at t Hz are automatically saved on a data file in the unit of a day. Besides these basic functions, the developed monitoring system has the other several capabilities. One of them is the information access from a remote PC through the internet. A vision image of the test site area and data files that are produced by LabVIBW software can be uploaded to the main computer located in a remote site. An emergency backup system using UPS fur the power loss on the monitoring HW is also prepared, A detail explanation for the developed wind turbine monitoring system is presented in this study.

On-line and Off-line Partial Discharge Monitoring System with HVAC Testing (HVAC에 의한 On-line, Off-line PD 모니터링)

  • Choi, Yong-Sung;Lee, Kyung-Sup
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2008.04c
    • /
    • pp.111-114
    • /
    • 2008
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.

  • PDF