• 제목/요약/키워드: On-line Stations

검색결과 270건 처리시간 0.024초

철도 사고현장의 효율적인 동영상 전송 방안에 관한 연구 (A study on effective sending of moving picture from train accident site)

  • 조봉관;장석각
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 추계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.289-291
    • /
    • 2003
  • Railway takes an important role of transporting massive passenger and freight. Accidents which occur related to trains have a risk of serious loss of lives, so those accidents need to be controlled urgently Therefore moving picture transmission system is required which transmits exact information of moving picture of accident status to CTC and also communication line is also required with it. By using WTB line as a wayside transmission line, railway telephones, fax and train service information are provided to local offices. As transmission line improving project, optical cabling work is being processed by phases. Therefore optical fiber line is more effective way for a communicating way between stations than coaxial transmission line. This Paper considers connecting method when optical fibers is used for moving picture data transmission of train accidents and its problems.

  • PDF

사고현장과 사령실간 화상전송기술에 관한 연구(III) (A Study on the moving picture transmission method between the accident sites and control center)

  • 조봉관;장석각;최규형
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 B
    • /
    • pp.1412-1414
    • /
    • 2004
  • Railway takes an important role of transporting massive passenger and freight. Accidents which occur related to trains have a risk of serious loss of lives, so those accidents need to be controlled urgently. Therefore moving picture transmission system is required which transmits exact information of moving picture of accident status to CTC and also communication line is also required with it. By using WTB line as a wayside transmission line, railway telephones, fax and train service information are provided to local offices. As transmission line improving project, optical cabling work is being processed by phases. Therefore optical fiber line is more effective way for a communicating way between stations than coaxial transmission line. This paper consider's connecting method when optical fibers is used for moving picture data transmission of train accidents and its problems.

  • PDF

지하철역사의 호선별로 미세먼지의 노출특성에 대한 평가 (Evaluation of Exposure Characteristics of Fine Dusts by Subway Lines)

  • 황성호;김종오
    • 한국환경보건학회지
    • /
    • 제43권1호
    • /
    • pp.71-76
    • /
    • 2017
  • Objectives: This study aimed to assess the environmental factors that affect particulate matters (PM10) and to compare with outdoor PM10 concentrations in an underground subway stations. Methods: The PM10 level was determined from May 2013 to September 2013 in the Seoul subway stations in four lines. PM mini-vol portable sampler sampler was used to collect PM10 for 6 hrs. Arithmetic means of PM10 concentrations with standard deviation (SD) were calculated. Paired t-test was used to compare the differences between indoor PM10 and outdoor PM10 concentrations with correlation analysis which was used to identify the association between indoor PM10 concentrations and environmental factors. Results: There were no different PM10 concentrations significantly between line 1, 2, 3 and 4 in an underground subway stations. Passenger number was positively associated with PM10 concentration while construction year was negatively associated with PM10 concentrations. Indoor PM10 concentrations were significantly higher than those in outdoor PM10 concentrations. PM10 concentrations were higher in the stations which were constructed before 1990s rather than the stations constructed after 1990s. Conclusion: PM10 levels in the underground subway stations varied greatly depending on the construction year. Therefore, it might need to be more careful management to the stations which constructed in before 1990s.

대용폐색방식 시행방법 개선에 관한 연구 (A Study on the Improvement for the Implement Way of a Substitute Block System)

  • 송낙균;김해곤;김호순;주창훈;김대식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.1860-1871
    • /
    • 2011
  • Presently, The Regular Block System(Automatic, Interlocking block system) is usually used during the operation of block section. However, In case that the regular block system fails because of the failure of the fixed signals and block equipment or in case of the unexpected emergent situation which should drive on the single-track due to the accidents in the double-track section or the repair work of the one-track, the Substitute Block System to make use of the driving permission license(mapping ticket, mapping paper) is used. In case of the operation of the opposite line and the temporary one-track, the safety gets worse and the SBS may cause the fatal accidents such as a head-on & a rear-end collision. Also, the unmanned railroad stations has recently increased owing to the effective operation of the stations, for it is difficult to execute the SBS in their absence. As a result, the increase of the operation time made the train delayed. Being on the rise of these problems, in this study, we analyzed the problems and difficulties of the SBS on the single line which is lacking stability and safety and on the sections combined between maned and unmaned railroad stations. And we proposed the method to improve the existing drive permission license used for 50 years into the brand-new one with state-of-the art technology and scientific way. In the era of the 21th century, Carrying out the new SBS equipped with stability and safety, we will contribute to the effective operation of trains and the satisfaction of our customers in the future.

  • PDF

라인벨런싱에 있어서 'Bowl현상'에 대한 연구 (A Study on the 'Bowl Phenomenon' in Production Line Balancing)

  • 오형재
    • 한국국방경영분석학회지
    • /
    • 제22권2호
    • /
    • pp.113-125
    • /
    • 1996
  • 'Bowl Phenomenon' refers to allocating the work loads to middle stages slightly less than the outer ones in a series production system. Millier and Boling(1966) first discovered that the output rate of a production line were obtained by deliberately unbalancing, like a bowl-shape, under certain circumstances. So far quite a many researches have been studied either theory-oriented or simulation-oriented on this topic. However the papers concerning assemble production line are rather rare possibly due to the system complexity. In this paper, a simulation work on a 6-node assembly line has been conducted with the help of SLAMSYSTEM software. The simulation results have been turned out that 1) the Bowl phenemenon is still valid in the given system, 2) buffer storage between the work stations are critical measure for determining the degree of work-load unbalancing.

  • PDF

시뮬레이션 기법(技法)을 이용한 물류(物流) 시스템 개선(改善)에 관한 연구(硏究) (Material Handling System Improvement Analysis Applying Simulation Technique)

  • 신현표;박성연;이화기
    • 산업공학
    • /
    • 제5권1호
    • /
    • pp.35-46
    • /
    • 1992
  • This paper deals with analysis of material handling system efficiency of a heat-exchanger manufacturing line. This line is a typical flow shop type assembly line which consists of 10 steps of assembly stations. Each station have one or two workers who assemble and move components for the job, and no special transporters for component's movement. Therfore, all the workers are involoved in unnecessary moving activities which decrease overall production efficiencies of the line. To improve productivities, production outputs and worker's job performances for this assembly line, the several alternatives are considered such as installing new conveyor lines and automatic guided vehicle(AGV) system. Analyzing economic feasibilities and responses of the system alternatives, an experimental simulation model is built suing SIMAN Ver. 3. 5 simulation language with CINEMA package for animation of the process flow. Through this animation process a vivid picturial analysis could performed on the process flow.

  • PDF

현존하는 간이역의 평면 및 입면 유형별 특징에 관한 연구 -중앙선, 동해남부선 및 경전선을 중심으로- (A Characteristics of Plan and Elevation Types of Existing Way Stations built in the Early 20th Century Korea)

  • 권순오;손한울;김태영
    • 한국농촌건축학회논문집
    • /
    • 제13권1호
    • /
    • pp.1-8
    • /
    • 2011
  • This aim of the study is to investigate the plan and elevation types of existing way stations built in the early 20th century Korea, focused on Choong-ang, Donghae-nambu, and Kyung-jeon line of the railroad tracklines. The plans and elevations are drawn up and analyzed based on literature data and aerial photographs through the survey. These way stations are classified into various types by room layout and front elevation. The basic plan types are composed of waiting room, station service room, and administration. The station service room has a train operation room in the projecting part of corner. This room has windows on every side to see in and out of train. There are the enlarged, extended waiting room types, and linear types in the other plan types. The waiting room is lied on the right side, and has a gable roof in elevation. The elevation types are classified with side and centralized, and so on by the placement and shape of gable roofs. The basic elevation types have gable roofs in sides lied on the waiting room, and these types are transformed into centralized types by extension of waiting room The others are the linear types without gable roofs and the unusual roof types in appearance.

뉴스초점 - 지하철 9호선의 급행화 및 5호선과의 직결대안 (Subway Line 9 Express Transit Service & Direct Link Proposal with Line 5)

  • 이선
    • 기술사
    • /
    • 제42권3호
    • /
    • pp.41-46
    • /
    • 2009
  • A new subway, line 9 linking Western and Eastern Seoul began its services for citizens between Gimpo airport and Gangnam area within 30 minutes by express transit service. Seoul Metro Line 9 Corporation plans to operate both local transit service which will stop at every station, and express transit service that will stop at several key stations including junctions. The passengers on line 9 will be able to transfer to lines 2, 3, 5, 8, Bundang and Incheon International Airport. The Line 9 is expected to disperse the demand for line 2, having the most number of subway users, and will provide passengers with less crowded travel. The new line will also help residents in southern Seoul outskirts and Gyeonggi provincial cities including Bundang vicinity, and Gangdong area commuters get better access to Gimpo and incheon Airports. The Corporation expects to transfer 560,000 passengers daily by the subway line 9. Seoul Development Institute conducted network reshuffle study for Seoul Metro system to sort out congestion problem due to its irrational line alignments and inconvenient transfer. Among several candidate plans of network reshuffling, the direct connection of line 9 with line 5 was chosen as a pilot study. The study found that direct connection of the 2 lines is essential for enhancing transit utility and reducing automobile commuters.

  • PDF

서울시 지하철 2호선 본선구간의 입자상물질 농도 특성 및 미세분진의 오염지도 개발 (Characterizing Par ticle Matter on the Main Section of the Seoul Subway Line-2 and Developing Fine Particle Pollution Map)

  • 이은선;박민빈;이태정;김신도;박덕신;김동술
    • 한국대기환경학회지
    • /
    • 제32권2호
    • /
    • pp.216-232
    • /
    • 2016
  • In present, the Seoul City is undergoing traffic congestion problems caused by rapid urbanization and population growth. Thus the City government has reorganized the mass transportation system since 2004 and the subway has become a very important means for public transit. Since the subway system is typically a closed environment, the indoor air quality issues have often raised by the public. Especially since a huge amount of PM (particulate matter) is emitted from ground tunnels passing through the subway train, it is now necessary to assess the characteristics and behaviors of fine PM inside the tunnel. In this study, the concentration patterns of $PM_1$, $PM_{2.5}$, and $PM_{10}$ in the Seoul subway line-2 were analyzed by real-time measurement during winter (Jan 13, 2015) and summer (Aug 7, 2015). The line-2 consisting of 51 stations is the most busy circular line in Seoul having the railway of 60.2 km length. The the one-day average $PM_{10}$ concentrations were $148{\mu}g/m^3$ in winter and $66.3{\mu}g/m^3$ in summer and $PM_{2.5}$ concentrations were $118{\mu}g/m^3$ and $58.5{\mu}g/m^3$, respectively. The $PM_{2.5}/PM_{10}$ ratio in the underground tunnel was lower than the outdoor ratio and also the ratio in summer is higher than in winter. Further the study examined structural types of underground subsections to explain the patterns of elevated PM concentrations in the line-2. The subsections showing high PM concentration have longer track, shorter curvature radius, and farther from the outdoor stations. We also estimated the outdoor PM concentrations near each station by a spatial statistical analysis using the $PM_{10}$ data obtained from the 40 Seoul Monitoring Sites, and further we calculated $PM_{2.5}/PM_{10}$ and $PM_1/PM_{10}$ mass ratios near the outdoor subway stations by using our observed outdoor $PM_1$, $PM_{2.5}$, and $PM_{10}$ data. Finally, we could develop pollution maps for outdoor $PM_1$ and $PM_{2.5}$ near the line-2 by using the kriging method in spatial analysis. This methodology may help to utilize existing $PM_{10}$ database when managing and control fine particle problems in Korea.

수서고속철도 전차선로의 설치조건의 따른 집전상태 분석 (Analysis of Current Collect Performance Depending on Installation Condition of Overhead Contact Line in Suseo High Speed Line)

  • 나경민;박영;이기원;조용현;권삼영;박철민
    • 전기학회논문지
    • /
    • 제66권4호
    • /
    • pp.727-732
    • /
    • 2017
  • This paper describes the dynamic characteristics depending on installation condition between a pantograph and an OCL (Overhead Contact Line) on a new high speed line in Korea. The current collection performance between the pantograph and the OCL was tested during train operation from Suseo to Jije stations. The current collection performance is evaluated based on the duration of an arc by using an arcing measurement system. The system consists of an optical sensor for measuring the duration of an arc and a camera for monitoring current collection performance. An arcing duration is defined as a percentage of arcing in international standards. This test aims to analyze the locations of repetitive arcing depending on installation conditions of OCLs on a new high speed line in order to use the result as reference data for correct construction and maintenance.