• Title/Summary/Keyword: On-line Stations

Search Result 269, Processing Time 0.026 seconds

A Study on the Rationality for Choosing Proper Routes & Stations of the KTX Gyeongbu Line (Daegu, Gyeongju, Ulsan and Busan) (경부고속철도 대구~경주~울산~부산 구간 노선 및 역사 선정의 합리성에 관한 연구)

  • Kim, Sungdeuk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.2D
    • /
    • pp.181-190
    • /
    • 2010
  • The purpose of this study is to propose an effective approach of making route decisions for the large-scale national project (i.e. the KTX Gyeongbu line between Daegu and Busan) by analyzing the conflicts that had occurred in the process of selecting the routes and stations. This study investigated policy making processes and conflicts during the construction of the KTX Gyeongbu line. The five contentious issues were 1) selecting the route between Daegu~Busan line, 2) developing a new route through Gyeongju areas, 3) making decisions of the first and second phases of construction, 4) setting up an extra station in Ulsan, and 5) conflicts of the Mt. Cheonseong route in Yangsan. In terms of analyzing these issues, the current study focuses on dealing with notions of technical, economical, legal, social, and practical rationality. Based on such analyses and implications, this study proposes a relatively reasonable model of line decision making especially for long-distance intercity routes. It also turns out that the large-scale project like the development of KTX Gyeongbu line should be conducted after receiving enough quantitative evaluation by reviewing relevant technical research studies and economic analyses, and having social agreements to prevent plausible conflicts.

Evaluation and Model Development of Transfer Resistance Factors for Bulk Freight Transportation (벌크화물운송의 환적저항요인 평가 및 모형 개발)

  • Choi, Chang-Ho
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.15 no.3
    • /
    • pp.1-11
    • /
    • 2016
  • The present study aims to evaluate transfer resistance factors in railway stations and draw new implications. The data used for the model estimation are RP (revealed preference) data and SP (stated preference) data. Two types of models were used for the analysis: integration model which combined line-haul stage, transfer stage and shuttle stage and separation model which assessed the three stages separately. The results revealed that while bulk freight shippers mainly focused on line-haul stage, they put emphasis on transfer stage as well. It's especially notable that transfer stage was considered more important than shuttle stage. Therefore, in future transportation policies concerning rail freight, it would be crucial not only to enhance the competitiveness of line-haul stage but also make improvements in transfer stage regarding railway stations.

Line Balancing for the Mixed Model Assembly Line Considering Processing Time and Physical Workloads (작업시간과 육체적인 작업부하를 고려한 혼합모델 조립공정의 라인밸런싱)

  • Moon, Sung-Min;Kwon, Keun-Seob;Choi, Gyung-Hyun
    • IE interfaces
    • /
    • v.17 no.3
    • /
    • pp.282-293
    • /
    • 2004
  • Line Balancing is the problem to assign tasks to stations while satisfying some managerial viewpoints. Most researches about the Mixed-Model Line Balancing problems are focused on the minimizing the total processing time or the number of workstations. Independently, some research reports consider the balance issues of the physical workloads on the assembly line. In this paper, we are presenting a new mathematical model to accomplish the line balance considering both the processing time and the workloads at the same time. To this, end, we propose an zero-one integer program problem, and we use the Chebyshev Goal Programming approach as the solution method. Some computational test runs are performed to compare the pay-offs between the processing time and the workloads. And, the test results show us that the reliable balanced work schedules can be obtained through the proposed model.

A Simulation Study of Urban Public Transport Transfer Station Based on Anylogic

  • Liu, Weiwei;Wang, Fu;Zhang, Chennan;Zhang, Jingyu;Wang, Lei
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.15 no.4
    • /
    • pp.1216-1231
    • /
    • 2021
  • With the increase in the population of our cities and the rapid increase in the number of private cars, urban traffic has become more and more congested. At this stage, urban public transportation has become one of the main ways to improve urban traffic congestion. Aiming at the problem of how to improve the basic capacity of buses in multi-line transfer stations, this paper conducts simulation research based on anylogic software. Through micro-simulation analysis of vehicles entering, stopping, and exiting the station, combined with the delay model theory, the vehicle is given Stop organization optimization and station layout improvement methods, so that vehicles can run in the station more stably, smoothly and safely. Case analysis shows that applying this method to the roadside parking problem, the main and auxiliary bus stations have a significant improvement in operating capacity compared with the conventional tandem double bus stations, and the service level of the main and auxiliary bus stations has been significantly improved.

Changes in spatial organization of Korea by the construction of Seoul-Pusan railroad (京釜線 鐵道建設에 따른 韓半島 空間組織의 變化)

  • ;Joo, Kyung-Sik
    • Journal of the Korean Geographical Society
    • /
    • v.29 no.3
    • /
    • pp.297-317
    • /
    • 1994
  • This study demonstrates the changes in the spatial organization of Korea by the construction of Seoul-Pusan railroad. This Seoul-Pusan line, which is the most important one in Korea was constructed in 1905. The original plan of the line was selected to cross the main traditional roads to control the entire Korean peninsular and to mobilize the Korean commercial potentials. It was the line to exploit the staples and to expand the Japanese market in Korea. In accordance with the contracts between Japan and Korean government, Korean government had to supply the lands for railroad, office, and service facilities. That was one of the important reasons that Korean government had been broken down. The main findings of this study are as follows: 1. The Seoul-Pusan railroad line was constructed Japanese colonial policy which emphasized three main purposes; the first was to reorganize the economic space and to collapse the traditional Korean markets for Japanese ruling, and the second was to find out the military supply routes, and the third was to search for the transcontinental line for China and Siberia. As the results, the old Korean pedestrian routes, which were the Eastern, the mid, the westren, and the Samnam route lost their functions. 2. Japanese requested for Korean government usually ten times of wider space for the site of stations than the needed one. The land was expropriated, and constructed the new centers aparted from the original Korean towns. In this process Japanese got the most developmental and windfall profits. The newly constructed centers were for Japanese immigration and the town service facilities which would be used to control the Korean financial market. At last, they easily converted the Korean spatial economy into Japanese colonial one, which made to reinforce the sphere of Seoul-Pusan line. 3. Japanese planned the stations as the central points in Korea. So the railroad stations were located apart from the centers of towns, to avoid the Korean resistances, and to maximize their profits. The mean distance from staiton to 'the town center is about 1km while the Japanese case is 0.6km. 4. The pattern of present Korean railroads is not the 'X type'. Because the Honam line is not the trunk one. So, we could call the Korean railroad pattern as the 'Ip(Chinese character 入) type' . The operational effects of Seoul-Pusan line brought out the concentration of the national economy to this line as Japanese planned. And the polorization had occurred between this line and the other parts of Korea. For twenty years (1910-1930), the transported freights were increased about 5 times. In 1930, the total freight of Seoul-Pusan line became 2, 010, 444 metric tons. If we examine this process, the underconstructing Seoul-Pusan express electric railroad should avoid adjacent this line to reduce the regional and ecological imbalance. 5. The forms of centers on the Seoul-Pusan line were classified into six types in relation to station, town center, and built-up area; the compact (integrated) type, the elongated one, the splited (independent) one, the absorbed one, the consolidated one, and the declined one. All types of these towns might be developed in accordance with the centrality, railroad function, and the other transportational functions. 6. The Seoul-Pusan line plays the most important role among Korean railroads but the ratio of passenger and freight become lower because the effiects of other inaugurated railoads the different transportation modes such as trucks and cars would be got more merits in competition. 7. The results of cluster analyses on the cities of railroad stations showed the rudimentary urban systems in 1910 and 1930. In 1930, the cities were classified into three groups; the group of small cites, the intermediate (developing) city-group, and the special city-group. In 1930s the spatial organization and urban system of Korea were similar to the present ones. We call appreciate that these were the effects of the Seoul-Pusan line.

  • PDF

A Modified Heuristic Algorithm for the Mixed Model Assembly Line Balancing

  • Lee, Sung-Youl
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.15 no.3
    • /
    • pp.59-65
    • /
    • 2010
  • This paper proposes a modified heuristic mixed model assembly line (MMAL) balancing algorithm that provides consistent station assignments on a model by model basis as well as on a station by station. Basically, some of single model line balancing techniques are modified and incorporated to be fit into the MMAL. The proposed algorithm is based on N.T. Thomopoulos' [8] method and supplemented with several well proven single model line balancing techniques proposed in the literature until recently. Hoffman's precedence matrix [2] is used to indicate the ordering relations among tasks. Arcus' Rule IX [1] is applied to generate rapidly a fairly large number of feasible solutions. Consequently, this proposed algorithm reduces the fluctuations in operation times among the models as well as the stations and the balance delays. A numerical example shows that the proposed algorithm can provide a good feasible solution in a relatively short time and generate relatively better solutions comparing to other three existing methods.

A Study on the Two-sided and Mixed Model Assembly Line Balancing Using Genetic Algorithm (유전알고리듬을 이용한 양면.혼합모델 조립라인 밸런싱)

  • 이내형;조남호
    • Journal of the Korea Safety Management & Science
    • /
    • v.4 no.2
    • /
    • pp.83-101
    • /
    • 2002
  • In this thesis presents line balancing problems of two-sided and mixed model assembly line widely used in practical fields using genetic algorithm for reducing throughput time, cost of tools and fixtures and improving flexibility of assembly lines. Two-sided and mixed model assembly line is a special type of production line where variety of product similar in product characteristics are assembled in both sides. This thesis proposes the genetic algorithm adequate to each step in tow-sided and mixed model assembly line with suitable presentation, individual, evaluation function, selection and genetic parameter. To confirm proposed genetic algorithm, we apply to increase the number of tasks in case study. And for evaluation the performance of proposed genetic algorithm, we compare to existing algorithm of one-sided and mixed model assembly line. The results show that the algorithm is outstanding in the problems with a larger number of stations or larger number of tasks.

On-line Fussy Performance Management of Profibus Networks

  • Lee, Kyung-Chang;Song Kang;Kim, Dong-Wook;Lee, Suk
    • International Journal of Precision Engineering and Manufacturing
    • /
    • v.1 no.2
    • /
    • pp.5-13
    • /
    • 2000
  • Most networks for automation are tuned to an expected traffic condition ar their design stage. During their actual operations, however, the networks experience considerable changes in traffic from time to time. These traffic changes caused by common events like machine failure and production schedule change may adversely affect th network performance and, in turn , the performance of the connected devices. This paper presents experimental results for performance management of a Profibus-FMS network. The performance management aims to maintain a uniform level of network performance at all stations under changing network traffic. The performance management algorithm monitors the performance of individual network stations and commands the stations to change their timer values in order to have comparable performance at all stations. In order to determine the amount of timer change, the algorithm employs a set of fuzzy rules. The algorithm has been evaluated on a Profibus network.

  • PDF

Seismic response of single-arch large-span fabricated subway station structure

  • He, Huafei;Li, Zhaoping
    • Earthquakes and Structures
    • /
    • v.23 no.1
    • /
    • pp.101-113
    • /
    • 2022
  • A new type of fabricated subway station construction technology can effectively solve these problems. For a new type of metro structure form, it is necessary to clarify its mechanical properties, especially the seismic performance. A soil-structure elastoplastic finite element model is established to perform three-dimensional nonlinear dynamic time-history analysis based on the first fabricated station structure-Yuanjiadian station of Changchun Metro Line 2, China. Firstly, the nonlinear seismic response characteristics of the fabricated and cast-in-place subway stations under different seismic wave excitations are compared and analyzed. Then, a comprehensive analysis of several important parameters that may affect the seismic response of fabricated subway stations is given. The results show that the maximum plastic strain, the interlayer deformation, and the internal force of fabricated station structures are smaller than that of cast-in-place structure, which indicates that the fabricated station structure has good deformation coordination capability and mechanical properties. The seismic responses of fabricated stations were mainly affected by the soil-structure stiffness ratio, the soil inertia effect, and earthquake load conditions rarely mentioned in cast-in-place stations. The critical parameters have little effect on the interlayer deformation but significantly affect the joints' opening distance and contact stress, which can be used as the evaluation index of the seismic performance of fabricated station structures. The presented results can better understand the seismic responses and guide the seismic design of the fabricated station.

Temporal Reaction of House Price Based on the Distance from Subway Station since Its Operation - Focused on 10-year Experience after Opening of the Daejeon Urban Transit Line - (개통 이후의 지하철역 거리에 기반한 주택가격의 시간적 반응 - 개통 후 10년의 대전 도시철도를 중심으로 -)

  • Kang, Jae-Won;Sung, Hyungun
    • Journal of Korea Planning Association
    • /
    • v.54 no.2
    • /
    • pp.54-66
    • /
    • 2019
  • This study analyzed whether a subway accessibility impact on house price is constant since its operation over time or not. The study was approached specifically to answer two research questions. One is "Are there significant temporal variations in the relationship between subway accessibility and housing price transacted after its opening?" The other one is "How the pattern of its temporal variation in housing price is formed as a function of the distance from the nearest station?" The study area is the subway station areas in the Daejeon metropolitan city, South Korea. Its first subway line has started to be opened in 2006 with 12 stations and then opened its additional 10 stations in 2007. It can be more appropriate to observe its impacts of subway accessibility on housing price because it has only one transit line with more than 10-year reaction term to its operation. The study employed alternative models to estimate yearly variation of subway accessibility on house price for the station areas with 500-meter and 1-kilometer radius respectively. While the study originally considered both a hedonic price model with interaction terms of its access distance to yearly transacted housing and a time-variant random coefficient model, the former model was finally selected because it is better fitted. Based on our analysis results, the reaction of house price to its transit line had significant temporal variation over time after opening. In addition, the pattern in its variation from our analysis results indicates that its capitalization impact on house price is over-estimated in its first several years after the opening. In addition, its positive capitalization impact is more effective in the 1000-meter station area than in the 500-meter one.