• Title/Summary/Keyword: On-line Simulation

Search Result 2,555, Processing Time 0.031 seconds

A Study on Robustness Analysis Model for Calculating Line Capacity in Railroad System (철도선로용량 계산을 위한 강인성 분석모형에 관한 연구)

  • Lee, Chang-Ho;Kim, Bong-Sun;Kim, Hak-Sik;Lee, Byung-Kwon;Kim, Dong-Hee;Hong, Sun-Hm
    • IE interfaces
    • /
    • v.16 no.spc
    • /
    • pp.111-115
    • /
    • 2003
  • Railroad system is consisted of resources of rail track, signal system, and vehicles. Railway operation must use these limited resources and maximize resource utilization. Line capacity(number of trains throughput/day) is determined by such as parameters, line utilization rate($\alpha$), dummy rate for the break-through hour($\beta$), and dummy rate for the number of rail track intervals($\delta$). Line capacity simulation(LCS) determined the line capacity through simulation given $\alpha$, $\beta$, and $\delta$. This paper deals with the development of parameter evaluation simulation(PES). PES presents the decision maker with the relationship of line capacity and measurement of robustness for various scenarios in different parameters and then the decision maker can determine the appropriate parameters.

A Simulation on The BLU Assembly Line (시뮬레이션을 이용한 백라이트유닛의 생산공정예측)

  • Kim, Seung-Nam;Moon, Je-Chang;Rim, Suk-Chul
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.05a
    • /
    • pp.1047-1051
    • /
    • 2005
  • Many corporation invest in LCD industry because of The growth of it. Back Light Unit(BLU), LCDs' main part take 20% of its product costs. In this paper we proposed simulation model that is in the process of introducing an equipment, We try to apply a simulation model in the BLU Assembly line by using ARENA. We make BLU Assembly line with various part storage, product strorage. etc. We evaluate Logistics in Assembly Line, and forecast bottleneck and throughput

  • PDF

An Accurate and Efficient Method of the Spray Paint Simulation for Robot OLP (로봇 Off-Line Programming을 위한 페인트 스프레이 시뮬레이션 방법론 개발)

  • Lee, Seung-Chan;Song, In-Ho;Borm, Jin-Hwan
    • Korean Journal of Computational Design and Engineering
    • /
    • v.13 no.4
    • /
    • pp.296-304
    • /
    • 2008
  • Recently, various attempts are being done to apply off-line programming system to field of paint robot. But most commercial simulation softwares have problems that are slow simulation speed and not support various painting paramenters on simulation. This paper proposes enhanced paint simulation method for off-line programming system. For these, this method used the mathematical model of flux field from a previous research. The flux field has the flux distribution function, which reflects on the feature of paint spray. A previous research derived this flux distribution function for an integral function and calculated paint thickness function for an integral function. But if flux distribution function is defined as an integral function, it is inadequate to use for real-time simulation because a number of calculation is needed for estimation of paint thickness distribution. Therefore, we defined the flux distribution function by numerical method for reducing a mount of calculation for estimation of paint thickness. We derived the equation of paint thickness function analytically for reducing a mount of calculation from the paint distribution function defined by numerical method. In order to prove proposed paint simulation method this paper compares the simulated and measured thickness. From this comparison this paper show that paint thickness distribution is predicted precisely by proposed spray paint simulation process.

FMS 스케쥴링을 위한 Priority 함수의 자동 생성에 관한 연구

  • 김창욱;신호섭;장성용;박진우
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1997.04a
    • /
    • pp.93-99
    • /
    • 1997
  • Most of the past studies on FMS scheduling problems may be classified into two classes, namely off-line scheduling and on-line scheduling approach. The off-line scheduling methods are used mostly for FMS planning purposes and may not be useful real time control of FMSs, because it generates solutions only after a relatively long period of time. The on-line scheduling methods are used extensively for dynamic real-time control of FMSs although the performance of on-line scheduling algorithms tends vary dramatically depending on various configurations of FMS. Current study is about finding a better on-line scheduling rules for FMS operations. In this study, we propose a method to create priority functions that can be used in setting relative priorities among jobs or machines in on-line scheduling. The priority functions reflect the configuration of FMS and the user-defined objective functions. The priority functions are generated from diverse dispatching rules which may be considered a special priority functions by themselves, and used to determine the order of processing and transporting parts. Overall system of our work consists of two modules, the Priority Function Evolution Module (PFEM) and the FMS Simulation Module (FMSSM). The PFEM generates new priority functions using input variables from a terminal set and primitive functions from a function set by genetic programming. And the FMSSM evaluates each priority function by a simulation methodology. Based on these evaluated values, the PFEM creates new priority functions by using crossover, mutation operation and probabilistic selection. These processes are iteratively applied until the termination criteria are satisfied. We considered various configurations and objective functions of FMSs in our study, and we seek a workable solution rather than an optimum or near optimum solution in scheduling FMS operations in real time. To verify the viability of our approach, experimental results of our model on real FMS are included.

  • PDF

Effects of a Static Synchronous Series Compensator (SSSC) Based on a Soft Switching 48-Pulse PWM Inverter on the Power Demand from the Grid

  • Ustun, Taha Selim;Mekhilef, Saad
    • Journal of Power Electronics
    • /
    • v.10 no.1
    • /
    • pp.85-90
    • /
    • 2010
  • In this paper the effects of a Static Synchronous Series Compensator, which is constructed with a 48-pulse inverter, on the power demand from the grid are studied. Extensive simulation studies were carried out in the MATLAB simulation environment to observe the compensation achieved by the SSSC and its effects on the line voltage, line current, phase angle and real/reactive power. The designed device is simulated in a power system which is comprised of a three phase power source, a transmission line, line inductance and load. The system parameters such as line voltage, line current, reactive power Q and real power P transmissions are observed both when the SSSC is connected to and disconnected from the power system. The motivation for modeling a SSSC from a multi-pulse inverter is to enhance the voltage waveform of the device and this is observed in the total harmonic distortion (THD) analysis performed at the end of the paper. According to the results, the power flow and phase angle can be controlled successfully by the new device through voltage injection. Finally a THD analysis is performed to see the harmonics content. The effect on the quality of the line voltage and current is acceptable according to international standards.

Analysis semiconductor FAB line on computer modeling & simulation (컴퓨터 모델링과 시뮬레이션을 통한 반도체 FAB Line 분석)

  • 채상원;한영신;이칠기
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2002.11a
    • /
    • pp.115-121
    • /
    • 2002
  • The growth of semiconductor industry attracted to researchers like design, facility technique and making small size chip areas. But nowadays, cause of technology extension and oversupply and price down, yield improvement is the most important point on growth. This paper describes the computer mode]ing technique as the solutions to analyze the problem, to formalize the semiconductor manufacturing process and to build advanced manufacturing environments. The computer models are built referring an existing 8' wafer production line in Korea.

  • PDF

A Simulation on the Displacement Stress of Cement in Porcelain Insulators for Transmission Line (송전용 자기재 애자의 시멘트 변위 응력에 관한 시뮬레이션)

  • Han, S.W.;Cho, H.G.;Woo, B.C.;Jung, G.C.;Lee, D.I.;Choi, I.H.
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2002.11a
    • /
    • pp.476-479
    • /
    • 2002
  • The ageing cause in many porcelain suspension insulators which occur on transmission and distribution line with dead-end stings is mechanical stress in interface between porcelain and cement materials. It is known that the principal mechanical stress which give electrical failure is the results of the displacement is due to cement growth. We studied the effect of cement displacement resulting environmental ageing parameters on porcelain insulator mechanical properties for transmission line by simulation (ANSYS/NASTRAN program) and test methods. These simulation analysis and experimental results show that cement volume growth affects severely to be mechanical failure ageing.

  • PDF

REAL-TIME SIMULATION OF A HIGH SPEED MULTIBODY TRACKED VEHICLE

  • YI K. S.;YI S.-J.
    • International Journal of Automotive Technology
    • /
    • v.6 no.4
    • /
    • pp.351-357
    • /
    • 2005
  • Development of a real-time simulation model for high-speed and multibody tracked vehicles is difficult because they involve hundreds of highly nonlinear equations. In the development of a reliable tracked vehicle model for real-time simulation, it is helpful to use an off-line tracked vehicle model developed by considering all the degrees of freedom of each element. This paper presents a step-by-step procedure for the development of a real-time simulation model based on the off-line tracked vehicle model. The road input data, Profile IV, is used for the real time simulation and simulation results are compared with vehicle test results obtained in the military test field. It is noted that the simulation results are quite close to the test results.

A Simulation Evaluation of Aisle Design and Operation Policies for an Automated Storage and Retrieval System with Narrow-/Wide-Width Racks (다품종 조립라인 자동화 물류창고의 이형 랙 배치 및 운영정책 시뮬레이션 평가)

  • Bosung Kim;Jeongtae Park;Soondo Hong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.1
    • /
    • pp.68-75
    • /
    • 2023
  • In an automotive plant, an automated storage and retrieval system (ASRS) synchronizes material handling flows from a part production line to an auto-assembly line. The part production line transfers parts on small-/large-sized pallets. The products on pallets are temporarily stored on the ASRS, and the ASRS retrieves the products upon request from the auto-assembly line. Each ASRS aisle is equipped with narrow-/wide-width racks for two pallet sizes. An ASRS aisle with narrow-/wide-width racks improves both storage space utilization and crane utilization while requiring delicate ASRS aisle design, i.e., the locations of the narrow-/wide-width racks in an ASRS aisle, and proper operation policies affect the ASRS performance over demand fluctuations. We focus on operation policies involving a common storage zone using wide-width racks for two pallet sizes and a storage-retrieval job-change for a crane based on assembly-line batch size. We model a discrete-event simulation model and conduct extensive experiments to evaluate operation policies. The simulation results address the best ASRS aisle design and suggest the most effective operation policies for the aisle design.

The Effectiveness Analysis on Set of Ramp Metering STOP-line Using Traffic Simulation Model (교통시뮬레이션 모형을 이용한 램프미터링 정지선 설정에 따른 효과분석)

  • Kim, In Su;Yang, Choong Heon
    • International Journal of Highway Engineering
    • /
    • v.16 no.1
    • /
    • pp.111-118
    • /
    • 2014
  • PURPOSES : This study performs fundamental research on ramp-metering design criteria. METHODS : We carefully review previous studies in terms of ramp-metering design criteria and then consider applicability in Korea. For this, traffic simulation model is employed to analyze actual effect according to specific location of stop-line when implementing ramp-metering. RESULTS : When a stop-line moving forward with a 50m interval, travel speed at mainline relative to current stop-line location tends to decrease. However, traveling speed at approach roads increase about 5~18% under the same condition. When a stop-line location moving backward with a 50m interval, mainline travel speed increase approximately 17~32% whereas traveling speed at approach roads decrease. All cases are compared with the current stop-line location. CONCLUSIONS : We believe that both cases are useful with respect to freeway management. For example, moving forward a stop-line case can be used management for queuing area at ramp section and approach roads. Moving backward a stop-line case can be used for traffic control, focusing on mainline of freeways.