This study analyzed the outlook for aviation demand for the recovery of the aviation industry, focusing on airlines facing difficulties in management due to the Covid-19 crisis. Although the timing of the recovery in aviation demand is uncertain at the moment, this study is based on prior research related to Covid-19 and forecasts by aviation specialists, and analyzed by SWOT technique to a group of aviation experts to derive and suggest implications for the prospects of aviation demand. Looking at the implications based on the analysis results, first, customer trust to prevent infection should be considered a top priority for recovering aviation demand. Second, promote reasonable air price policy. Finally, it seeks to try various research and analysis techniques to predict long-term aviation demand to overcome Covid-19.
A comprehensive review for the selection of urban rail vehicle systems that best suit Gimpo railway line is taking place with consideration of the project area characteristics in light of line planning, passenger demand, supply of rolling stock, and railway construction and operation. Various aspects of vehicle systems including passenger demand on concerned lines, regional characteristics, vehicle types, and railway construction and operational settings should be taken into consideration. In addition, request for the introduction of customized vehicle systems reflecting the convenience of transit users such as wide and hospitable inner space, low noise, flexible operation of 2 to 4 car train-set and eye catching slim bridge piers is increasing. A study on alternatives to place an order to opt for optimum rolling stock systems considering line characteristics of Gimpo City's urban railway and future passenger demand while meeting the needs of Gimpo City has been conducted.
Part load operation usually covers large periods of the total operation time on the economic ground and electricity demand in small-scale boilers. Performance analysis of part load behavior is very important for the purpose of boiler operation optimization. A simple thermal calculation approach is applied to predict performance of a pilot-scale circulating fluidized bed (CFB) boiler at part load operation. Verification has been carried out by comparing between calculation results an operation data of the boiler.
The region trunk line railroad route undergoes an influence on a large scale in train operation systematic reorganization. This keynote of the train operation not being to the consumer and not to be is because being to the supplier. The trunk line route user of region supply change of the supplier sensitively, accepts but, the demand unit will be able to change the supply massive demanders does not become and like that to accept this back is not the railroad the mean of transportation which grudge is different a mean of transportation mainly makes use. This hits to neither the gist of GLORY promotions of the railroad public corporation which pursues the railroad use which is ordinary even in the basis of governmental policy of stock of coal small green growth and not to be is arranged. For the railroad use activation of the region trunk line route consequently and to excavate the demand hindrance element and a demand lure element the inside and the outside defines and to observe the fluctuation of use importing in existing train operation systematic fluctuation, with the user tries analyzes the instance of the overseas railroad enterprise about the process which reflects the opinion of the area and improvement under preparing boil.
First phase section of line 9 which had been constructed by first private capitalization business of Seoul city was opened on July 24, 2009. There are 25 stations of 25.5km operation distance between Gaehwa and Sinnonhyeon, running regular and express trains on the same track. The number of daily passenger demand has risen to above 200thousand passengers with record above 90% of anticipatied transport demand in 2010. The construction of second phase section(Sinnonhyeon~Bohoon Hospital : 14km, 13 stations) is currently under construction for opening in 2016. This study aims to suggest optimal operating patterns taking into consideration theoretical operating headways for regular and express trains, demand of rolling stocks mainly analyzed on record of first phase demand of line 9 and anticipated transport demand of second phase basic plan.
불확실한 저수지 유입량과 수요량 때문에 최적의 저수지 조작기준은 정량화하기 쉽지 않다. 그렇지만 저수지 조작에 일정 수요를 충족시키면서 모의 발생시킨 유입량 시계열을 반영함으로써 음해 추계적 최적화 접근법을 이용하면 조작기준은 작성 가능하다. 이에 본 연구에서는 한강수계 7개 저수지 계통에 적절하도록 수력발전 최대화를 선형추적으로 모형화하고 최적제어를 이용하여 최적조작을 수행하였다. 이 때 2001년 수도권 용수수요를 만족시키도록 한 최적 조작 모형에는 다지점 마코브 모형에 의해 모의 발생된 유입량 자료가 입력된다. 그리고 최적 결과에 대하여 회구 분석과 통계 분석을 수행하여 월별 조작기준을 작성하고 계절별 저수위별 확률을 제시하였다. 이때 상대적으로 저수용량이 커서 조절능력이 좋은 화천댐, 소양강댐, 충주댐은 저류와 방류의 회귀 관계가 잘 형성되었다. 작성된 조작기준으로 실제 운영 기간동안에 대하여 모의조작을 수행하여 그 효율성을 검증하였다.
The purpose of this study were to a) investigate operation of human resource in contract foodservice management company (CFMC), b) identify the staffing indices for the establishment an labor productivity for CFMC, and c) develop standardized model of staffing demand as foodservice's scale in CFMC. The data was collected using FS intra-net system from 138 contract-managed foodservice operations in A CFMC and statistical analysis was completed using the SAS/win package (ver. 8.0) for description analysis, ANOVA, Duncan multiple comparison, pearson correlation analysis, and regression analysis. The types of operation were included factory (45%), small scale operation (26%), office (11%), department store (10%), training institute (4%), and hospital (3%). The distribution of foodservice scale was classified by meal served was as follows; 'less than 500 meals (47%)', 'from 500 to 1500 meals (25%)', 'from 1500 to 2500 meals (17%)', and 'more than 2500 meals (12%)'. There was two types of contract method, fee-contract (53%) and profit-and-loss contract (46%) Some variables were significantly high operation indices such as selling price, food cost, monthly sales, net profit and others were significantly low operation indices such as labor, meal time a day in the small foodservice on meal scale (p<.001). The more foodservice was large, the more human resource was disposed on dietitian, cook, cooking employee altogether (p<.001). Foodservice in A CFMC was divided into 2 groups by 500 meals a day, according to comparative analysis of labor productivity as meal scale per working hour, meal scale a day and operation indices as meal per foodservice employee, meal per cooking employee (p<.001). The regression equation model was developed as 'the number of employees=1.82+0.014 ${\times}$ meal served' in the operation of less than 500 meals, 'the number of employees=9.42+0.013 ${\times}$ meal scale a day -0.94 ${\times}$ meal scale per working hour' in the operation over 500 meal scale using labor productivity indices and operation indices. Therefore, CFMC could be enhanced efficiency of human resource arrangement using the standardized model of staffing demand and would be increased effectiveness of profit.
The important requirement for microgrid operation is to meet the balance between supply and demand. To meet, Combined Heat and Power (CHP) generation should be considered in microgrid scheduling. CHP generation is economical on the side of a consumer because it products heat and power. Therefore, it is high efficient. This paper presents a mathematical model for optimal microgrid operation including CHP generation using the optimal ratio of heat and power due to demand. The objective function and constraints are modeled by linear program (LP). Through the case study, the validation of the proposed model is shown.
One important objective of the electricity market is to decrease the price by ensuring stability in the market operation. Interconnected to this is another objective; namely, to realize sustainable consumption of electricity by equitably distributing the effects and benefits of participating in the market among all participants of the industry. One method that can help achieve these objectives is the ^{(R)}$demand-response program, - which allows for active adjustment of the loadage from the demand side in response to the price. The demand-response program requires a customer baseline load (CBL), a criterion of calculating the success of decreases in demand. This study was conducted in order to calculate undistorted CBL by analyzing the correlations between such external or seasonal factors as temperature, humidity, and discomfort indices and the amounts of electricity consumed. The method and findings of this study are accordingly explicated.
Smart Grid has two main objectives on both supply and demand aspects which are to distribute the renewable energy sources on supply side and to develop realtime price responses on demand side. Renewable energy does not consume fossil fuels, therefore it improves the eco-friendliness and saves the cost of power system operation at the same time. Demand response increases the flexibility of the power system by mitigating the fluctuation from renewable energies, and reduces the capacity investment cost by shedding the peak load to off-peak periods. Currently Smart Grid technologies mainly focus on energy monitoring and display services but it has been proved that enabling technologies can induce the higher demand responses through many pilot projects in USA. On this context, this paper provides a price responsive algorithm for HEMS (home energy management system) on the real time pricing environment. This paper identifies the demand response as a core function of HEMS and classifies the demand into 3 categories of fixed, transferable, and realtime responsive loads which are coordinated and operated for the utility maximization or cost minimization with the optimal usage combination of three kinds of demand.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.