It is very difficult to find optimal train operation plan when analyzing the economic investment using traditional railroad travel demand estimation method. Train operation plan depends on travel demand and vice versa. To solve this problem, this study suggests a demand estimation method to address an optimal train operation scheme with the modal spilt using initial train operation plan and trip assignment.
In most cities, travel demand is distributed along long corridors and its destinations tend to concentrate in a central business district. For this kind of many-to-one or one-to-many travel demand pattern, a zonal operation of buses can be an efficient bus operation technique in which a long bus-demand corridor is divided into service zones and each service zone is provided with its own bus route connecting the service zone and single destination separately. This paper develops models of the total transportation costs for a single-zone operation and 2-zonal operation of buses for a long demand corridor with single destination in terms of various cost parameters, demand density, bus operation speeds, and location of the boundary between two service zones. In this study the total transportation cost is assumed to consist of the bus operation cost, passenger waiting cost and passenger travel time cost. It was proved that a zonal operation of buses can be more efficient than a single-zone operation for certain circumstances of the system and an boundary condition between two operation techniques was obtained. Also, several case studies were performed for various values of the cost parameters.
The 6th International Conference on Construction Engineering and Project Management
/
pp.101-103
/
2015
Scientific methods that measure the physical demand requirements of a construction operation have not been arrived at maturity in construction community. It is attributed to the difficulty involved in performing controlled experiments on the operation and its' volatile jobsite environment. This paper presents a method that measures the physical demand requirement of the waterproofing activity and verifies the differences between various operations (e.g., a primer painting and a polyurethane coating) consisting of the activity. Two hypotheses, which are involved in the operations, are summarized as follows: [Hypothesis 1] when one performs the same amount of work; the one's average heart rate required for the polyurethane coating operation is higher than that required for the primer painting operation. [Hypothesis 2] when one performs the same amount of work, the one's break time required for the polyurethane coating operation is longer than that required for the primer painting operation.
Recently, technologies for efficient power grid operation have become important due to climate change. For this reason, predicting power demand using deep learning is being considered, and it is necessary to understand the influence of characteristics of each region, industrial structure, and climate. This study analyzed the power demand of New Jersey in US, with a high urbanization rate and a large service industry, and West Virginia in US, a low urbanization rate and a large coal, energy, and chemical industries. Using recurrent neural network algorithm, the power demand from January 2020 to August 2022 was learned, and the daily and weekly power demand was predicted. In addition, the power grid operation based on the power demand forecast was discussed. Unlike previous studies that have focused on the deep learning algorithm itself, this study analyzes the regional power demand characteristics and deep learning algorithm application, and power grid operation strategy.
The bus should supply an equal service to the whole community as feeder trip. However the existing bus route can not supply an effective feeder service in spite of the changes in the latent demand by the variety of regional structural change. This study aimed to establish the concept which frames the bus operation and management to cope with the latent demand to the bus. This study tackled this evidence by analyzing the transportation problems in terms of the urban growth emphasizing the following issues ; First, the strategy to improve the bus operation Second the land use control appropriate for the public transportation network Third economical range to justify the bus operation Second, the land use control appropriate for the public transportation network Third, economical range to justify the bus operation Fourth, the allowance for the private transportation mode On the latter part, the difference on the bus operation was compared to determine the range within which the bus operation could be justified. This study would provide some implications to improve the management for bus operation and fundamental information to develop the bus operation system.
Revenue management is a new approach method to solve the problem of supply and demand, and one of fields which is diffused quickly at the service enterprise to use perishable-asset like the transportation business. It is based on multiple fare policy that discount charge reservation should be received if the benefit value of current discount fare is more than expected profit of the normal fare reservation it will be able to occur in future when suitable goods is sold to the customers at discount fare, at the time they want, and at assigned seat by controlling supply and demand from market. In this research, I will review on initial operation case for special class goods that the seat which is limited is assigned at some of train and portion of KTX for demand dispersion and new demand creation at peak time, put a limit in purchase conditions, and provides discounted fare. I will also try to find implication for strategic operation.
The bus as a feeder trip should supply equality service to the whole community. But in spite of the change of latent demand to the bus by the variety of regional structural change, the existing bus route can not supply effective feeder service. For cope with the latent demand to the bus, this study establish a concept that frame of the bus operation and management. This study tackled to evidence this fact by analyzing the bus transport problems in terms of the urban growth, and following issues were discussed: 1) the strategy for improvement of bus operation, 2) the land use control which is appropriate for the public transport network, 3) the economical range to justify the bus operation, 4) the allowance for the private transport mode. On the second part of this study, the difference on the bus operation was compared to determine the range within which the bus operation can be justified. This would provide the direction to improve the management for bus operation and fundamental information to develop the bus operation system.
The Tor Tong Daeng Irrigation Project with the irrigation area of 61,400 hectares is located in the Ping Basin of the Upper Central Plain of Thailand where farmers depended on both surface water and groundwater. In the drought year, water storage in the Bhumipol Dam is inadequate to allocate water for agriculture, and caused water deficit in many irrigation projects. Farmers need to find extra sources of water such as water from farm pond or groundwater as a supplement. The operation of Bhumipol Dam and irrigation demand estimation are vital for irrigation water allocation to help solve water shortage issue in the irrigation project. The study aims to determine the smart dam operation system to mitigate water shortage in this irrigation project via introduction of machine learning to improve dam operation and irrigation demand estimation via soil moisture estimation from satellite images. Via ANN technique application, the inflows to the dam are generated from the upstream rain gauge stations using past 10 years daily rainfall data. The input vectors for ANN model are identified base on regression and principal component analysis. The structure of ANN (length of training data, the type of activation functions, the number of hidden nodes and training methods) is determined from the statistics performance between measurements and ANN outputs. On the other hands, the irrigation demand will be estimated by using satellite images, LANDSAT. The Enhanced Vegetation Index (EVI) and Temperature Vegetation Dryness Index (TVDI) values are estimated from the plant growth stage and soil moisture. The values are calibrated and verified with the field plant growth stages and soil moisture data in the year 2017-2018. The irrigation demand in the irrigation project is then estimated from the plant growth stage and soil moisture in the area. With the estimated dam inflow and irrigation demand, the dam operation will manage the water release in the better manner compared with the past operational data. The results show how smart system concept was applied and improve dam operation by using inflow estimation from ANN technique combining with irrigation demand estimation from satellite images when compared with the past operation data which is an initial step to develop the smart dam operation system in Thailand.
This study analyzed changes of train operation between Seoul~Cheonan after the introduction of new electrified rail in 2005. As expected number of passengers were reduced at specific service section and several railroad stations which were served by the Mugunghwa. Also, the statistic shows that passenter demand concentrated in a specific time, so train service frequency and level of service need to be modified to meet with changed demand pattern. The purpose of this paper is to identify critical demand pattern, especially, in several section of the railroad system. This studies provide a railroad transportation system that is significantly more efficient, with far greater capacity, by providing solutions to the problems of congestion impact.
This paper proposes Direct Load Control(DLC) operation scheme using a bidding system and the methodology to value proper quantity decided by the DLC program, which is a kind of resources for stabilization of electricity market price during peak times by managing consumer electricity demand. Since DLC program in Korea is based on the contract with the customers participating in this program, it is difficult to anticipate voluntary participation. That is, incentive for participants in DLC program is insufficient. To cope with this point, it is necessary to develop a new market mechanism and market compatible operation scheme for DLC programs. DLC market mechanism is deemed to be equipped with iterative bidding system, independent operation from energy market, and interactive with bidding information on energy market. With this market mechanism, it is important to find the optimal operation point of DLC allowing for the factors of stabilizing the electricity market price and compensating DLC implementation. This paper focuses on the mathematical approaches for the bid-based DLC operation scheme and examines several scenarios for the following technical justifications: 1) stabilization of electricity market price during peak times, 2) elasticity of demand.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.