• Title/Summary/Keyword: Oil pumping system

Search Result 24, Processing Time 0.018 seconds

On Nanometer Positioning Control of Ultra-precision Hydrostatic Bearing Guided Feeding Table (초정밀 유정압 베어링 이송 테이블의 나노미터 위치결정 제어에 관한 연구)

  • Shim, Jongyoup;Park, Chun-Hong;Song, Chang-Kyu
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.30 no.12
    • /
    • pp.1313-1320
    • /
    • 2013
  • An ultraprecision multi-axis machine tool has been designed and developed in our laboratory. The machine tool has four moving axes which are composed of three linear axes and one rotational axis. It has a gantry type structure and the Z-axis is on the X-axis and the C-axis, on which a workpiece is located, is inside the Y-axis. This paper shows control performance improving method and procedure for the ultra-precision positioning control of a hydrostatic bearing guided linear axis. Through improvements of electrical and mechanical components for the control system such as control electronics and oil pumping systems, the control disturbing noise is decreased. Also by the frequency domain analysis of control system those problem-making system components are identified and modified with analytical methods. The controller is analyzed and designed from frequency domain data and system information. In the experimental control results the nanometer order control result is successfully presented.

The Study on the Countermeasure Plans about Leakage, Explosion and Fire Accidents of Atmospheric Storage Tank (옥외저장탱크 누출, 폭발 및 화재사고 대응방안에 관한 고찰)

  • Lee, Gab-Kyoo
    • Fire Science and Engineering
    • /
    • v.30 no.6
    • /
    • pp.48-56
    • /
    • 2016
  • A crude oil leakage from a large atmospheric storage tank occurred on 4 April 2014 at 14:50 in Ulsan City, while storing the crude oil in the tank. Emergency Rescue Control Group was deployed in the scene. The company, Fire Service Headquarters and associated agencies got together in Command Post (CP) for discussing an effective corresponding strategy. Many solution plans were drafted in the debate such as power down, stopping the facilities, checking the density of inflammable gas, suppressing oil evaporation, moving the leaked crude oil to a nearby tank and a processing plant and avoiding marine pollution. All the solutions were carried out in cooperation with several agencies and partners. The oil leakage accident was successfully settled up within the process of responding, The Fire Service Headquarters and the company thought that the most important thing was the suppression of oil evaporation and the elimination of ignition source. With Fire Service Headquarters and several agencies' every effort, an explosion and a fire didn't occurred in the scene. This study suggest the improvement of the operating system in Emergency Rescue Control Group in case of petroleum leakage, explosion and fire accidents of atmospheric storage tank, different from a ordinary disaster. Assuming that petroleum leakage in atmospheric storage tank develop the explosion and fire accidents, the spreading speed of the flame and the burning time was experimented and compared with each other. Furthermore, this study concentrates on the effective field response plan prepared for the afterward explosion and fire accidents from petroleum leak in a storage tank, with the database experimented and analyzed in accordance with the angle of radiation in the foam nozzle and the pressure of pumping in a fire engine.

A Study of a Pilot Test for a Blasting Performance Evaluation Using a Dry Hole Charged with ANFO (건공화 공법의 발파 성능 평가를 위한 현장 시험에 관한 연구)

  • Lee, Seung Hun;Chong, Song-Hun;Choi, Hyung Bin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.2
    • /
    • pp.197-208
    • /
    • 2022
  • The existence of shallow bedrock and the desire to use underground space necessitate the use of blasting methods. The standard blasting method under water after drilling is associated with certain technical difficulties, including reduced detonation power, the use of a fixed charge per delay, and decoupling. However, there is no blasting method to replace the existing blasting method. In this paper, a dry hole charged with ANFO blasting is assessed while employing a dry hole pumping system to remove water from the drill borehole. Additional standard blasting is also utilized to compare the blasting performances of the two methods. The least-squares linear regression method is adopted to analyze the blasting vibration velocity quantitatively using the measured vibration velocity for each blasting method and the vibration velocity model as a function of the scaled distance. The results show that the dry hole charged with ANFO blasting will lead to greater damping of the blasting vibration, more energy dissipation to crush the surrounding rock, and closer distances for the allowable velocity of the blasting vibration. Also, standard blasting shows much longer influencing distances and a wider range of the blasting pattern. The pilot test confirms the blasting efficiency of dry hole charged with ANFO blasting.

The Study on the Confidence Building for Evaluation Methods of a Fracture System and Its Hydraulic Conductivity (단열체계 및 수리전도도의 해석신뢰도 향상을 위한 평가방법 연구)

  • Cho Sung-Il;Kim Chun-Soo;Bae Dae-Seok;Kim Kyung-Su;Song Moo-Young
    • The Journal of Engineering Geology
    • /
    • v.15 no.2 s.42
    • /
    • pp.213-227
    • /
    • 2005
  • This study aims to assess the problems with investigation method and to suggest the complementary solutions by comparing the predicted data from surface investigation with the outcome data from underground cavern. In the study area, one(NE-1) of 6 fracture zones predicted during the surface investigation was only confirmed in underground caverns. Therefore, it is necessary to improve the confidence level for prediction. In this study, the fracture classification criteria was quantitatively suggested on the basis of the BHTV images of NE-1 fracture zone. The major orientation of background fractures in rock mass was changed at the depth of the storage cavern, the length and intensity were decreased. These characteristics result in the deviation of predieted predicted fracture properties and generate the investigation bias depending on the bore hole directions and investigated scales. The evaluation of hydraulic connectivity in the surface investigation stage needs to be analyze by the groundwater pressures and hydrochemical properties from the monitoring bore hole(s) equipped with a double completion or multi-packer system during the test bore hole is pumping or injecting. The hydraulic conductivities in geometric mean measured in the underground caverns are 2-3 times lower than those from the surface and furthermore the horizontal hydraulic conductivity in geometric mean is six times lower than the vertical one. To improve confidence level of the hydraulic conductivity, the orientation of test hole should be considered during the analysis of the hydraulic conductivity and the methodology of hydro-testing and interpretation should be based on the characteristics of rock mass and investigation purposes.