• Title/Summary/Keyword: Offshore wind power plant

Search Result 31, Processing Time 0.022 seconds

A Study on Siting of HVAC Offshore Substation for Wind Power Plant using Submarine Cable Cost Model (해저케이블 비용 모델을 이용한 HVAC 해상변전소 적정 위치 선정에 관한 연구)

  • Won, Jong-Nam;Moon, Won-Sik;Huh, Jae-Sun;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.4
    • /
    • pp.451-456
    • /
    • 2013
  • Development of the technologies for offshore wind power is proceeding actively and the installation capacity is continuously increasing because of its many advantages in comparison with the land wind power. Accordingly, project for Southwestern 2.5GW offshore wind power plant is in progress in Korea. Design of electric power systems for offshore wind power plant is very important due to its high investment and operational costs. Hence, it needs to be designed in order to minimize costs. This way can be employed in determining the installation location of offshore substation for HVAC wind power plant. According to the offshore substation site, MV inter-array cable and HV export cable lengths vary and they change a total cost regarding submarine cable. This paper represents cost models with variables which are MV inter-array cable and HV export cable lengths to locate the offshore substation for HVAC wind power plant. It is classified into submarine cable installation cost, reactive power compensator installation cost, ohmic losses, and unsupplied energy cost. By minimizing a total cost, an appropriate installation site of the offshore substation is determined.

Economic Evaluation of Power Grid Interconnection between Offshore Wind Power Plants (해상풍력발전단지 간의 전력계통 연계에 관한 경제성 분석 연구)

  • Moon, Won-Sik;Jo, Ara;Kim, Jae-Chul
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.4
    • /
    • pp.339-344
    • /
    • 2014
  • An offshore wind power plant (WPP) is very expensive and different from an onshore wind power system in many ways. There has been a continuous increase in the capacity of the offshore WPPs. Therefore it is essential to analyze the feasibility and reliability of the offshore wind power to optimize their redundancy. Besides, it is very important to study a planning for grid interconnection of adjacent offshore WPPs. This paper proposes a economic evaluation method to interconnect with adjacent offshore substations in offshore wind power grid. Also, we suggest the probabilistic reliability method to calculate a probabilistic power output of the wind turbine and a cost of the expected energy not supplied that is used as the reliability index of the power system.

Optimal Design of Power Grid and Location of Offshore Substation for Offshore Wind Power Plant (해상풍력발전단지의 전력망과 해상변전소 위치에 대한 최적 설계)

  • Moon, Won-Sik;Won, Jong-Nam;Huh, Jae-Sun;Jo, Ara;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.7
    • /
    • pp.984-991
    • /
    • 2015
  • This paper presents the methodology for optimal design of power grid for offshore wind power plant (OWPP) and optimum location of offshore substation. The proposed optimization process is based on a genetic algorithm, where the objective cost model is composed of investment, power loss, repair, and reliability cost using the net present value during the whole OWPP life cycle. A probability wind power output is modeled to reflect the characteristics of a wind power plant that produces electricity through wind and to calculate the reliability cost called expected energy not supplied. The main objective is to find the minimum cost for grid connection topology by submarine cables which cannot cross each other. Cable crossing was set as a constraint in the optimization algorithm of grid topology of the wind power plant. On the basis of this method, a case study is conducted to validate the model by simulating a 100-MW OWF.

Installation of Meteorological Mast for the Test Bed of Offshore Wind Power (서해 100MW 해상풍력 실증단지 기상타워 구축사례)

  • Ryu, Moosung;Kang, Keumseok;Kim, Jiyoung;Lee, Junshin
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.55.2-55.2
    • /
    • 2011
  • The final site of offshore wind power plant should be decided by comprehensive examination of various conditions such as wind resource, sea depth, geology, grid connection, social circumstance and environmental issue. Wind condition is typically regarded as the most important factor because wind energy increases in proportion to wind velocity and it directly relates to the amount of power output, efficiency of power plant and profitability. Advanced countries in the offshore wind power sector such as Denmark, UK and Germany, they are analyzing wind resource accurately by installing the meteorological mast in the ocean in order to get the optimal type of wind turbine and maximum generation efficiency. Also, it is made much of designing offshore power plant on the basis of actual measurement by met-mast and those wind farms have a chance to get the loan with reduced interest rate in project financing. In Korea, the HEMOSU-1 is installed in the ocean around Wido island to analyze wind resource of test bed of 100MW offshore wind power on october last year. This paper deals with the design and construction procedure of the first met-mast in Korea and also shows the site characteristics of test bed. Therefore, this paper will give useful information to local governments and private business sector who are trying to construct offshore wind farm and it can also be a good reference for the following projects of meteorological mast in near future.

  • PDF

Conceptual Design of Large Semi-submersible Platform for Wave-Offshore Wind Hybrid Power Generation (파력-해상풍력 복합발전을 위한 대형 반잠수식 플랫폼의 개념설계)

  • Kim, Kyong-Hwan;Lee, Kangsu;Sohn, Jung Min;Park, Sewan;Choi, Jong-Su;Hong, Keyyong
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.18 no.3
    • /
    • pp.223-232
    • /
    • 2015
  • The present paper considers the conceptual design of floating wave-offshore wind hybrid power generation system. The worldwide demand for ocean renewable energy is increasing rapidly. Wave and offshore wind energy have been attractive among the various ocean renewable energy sources, and the site to generate electricity from wave and offshore wind accords well together. This means that a hybrid power generation system, which uses wave and offshore wind energy simultaneously has many advantages and several systems have been already developed in Western Europe. A R&D project for a 10 MW class floating wave-offshore wind hybrid power generation system has been also launched in Korea. A semi-submersible platform, which has four vertical columns at each corner of the platform to be connected with horizontal pontoons, was designed for this system considering arrangements of multiple wind turbines and wave energy converters. A mooring system and power cable were also designed based on the metocean data of installation site. In the present paper, those results are presented, and the difficulties and design method in the design of hybrid power generation system are presented.

Arrangement Design and Performance Evaluation for Multiple Wind Turbines of 10MW Class Floating Wave-Offshore Wind Hybrid Power Generation System (10MW급 부유식 파력-해상풍력 연계형 발전 시스템의 다수 풍력터빈 배치 설계 및 성능 평가)

  • Park, Sewan;Kim, Kyong-Hwan;Lee, Kang-Su;Park, Yeon-Seok;Oh, Hyunseok;Shin, Hyungki;Hong, Keyyong
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.18 no.2
    • /
    • pp.123-132
    • /
    • 2015
  • In this study, an arrangement design process for multiple wind turbines, placed on the 10MW class floating wave-offshore wind hybrid power generation system, was presented, and the aerodynamic performance was evaluated by using a computational fluid dynamics. An arrangement design, which produces a maximum power in the site wind field, was found by using a commercial program, WindPRO, based on a blade element momentum theory, then the effect of wake interference on the system between multiple wind turbines was studied and evaluated by using ANSYS CFX.

Study of a Photovoltaic System as an Emergency Power Supply for Offshore Plant Facilities (해양플랜트 설비의 비상전원공급을 위한 태양광 발전시스템 연구)

  • Choi, Gun Hwan;Lee, Byung Ho;Jung, Rho-Taek;Shin, Kyubo
    • Journal of Ocean Engineering and Technology
    • /
    • v.32 no.4
    • /
    • pp.279-286
    • /
    • 2018
  • The use of eco-friendly energy in the offshore plant system is expanding because conventional generators are operated by fossil fuel or natural gas. Eco-friendly energy, which replaces existing power generation methods, should be capable of generating the power for lighting protection equipment, airborne fault indication, parameter measurement, and others. Most of the eco-friendly energy used in offshore plant facilities is solar and wind power. In the case of using photovoltaic power, because the structure must be constructed based as flat solar panels, it can be damaged easily by the wind. Therefore, there is a need for a new generation system composed of a spherical structure that does not require a separate structure and is less influenced by the wind. Considering these characteristics, in this study we designed, fabricated, and tested a unit that could provide the most efficient spherical photovoltaic power generation considering wind direction and wind pressure. Our test results indicated that the proposed system reduced costs because it did not require any separate structure, used eco-friendly energy, reduced carbon dioxide emissions, and expanded the proportion of eco-friendly energy use by offshore plant facilities.

A Study on the Design of Database to Improve the Capability of Managing Offshore Wind Power Plant (해상풍력 풍력시스템의 관리능력 향상을 위한 데이터베이스 설계에 관한 연구)

  • Kim, Do-Hyung;Kim, Chang-Suk;Kyong, Nam-Ho
    • Journal of the Korean Solar Energy Society
    • /
    • v.30 no.3
    • /
    • pp.65-70
    • /
    • 2010
  • As for the present wind power industry, most of the computerization for monitoring and control is based on the traditional development methodology, but it is necessary to improve SCADA system since it has a phenomenon of backlog accumulation in the applicable aspect of back-data as well as in the operational aspect in the future. Especially for a system like offshore wind power where a superintendent cannot reside, it is desirable to operate a remote control system. Therefore, it is essential to establish a monitoring system with appropriate control and monitoring inevitably premised on the integrity and independence of data. As a result, a study was carried out on the modeling of offshore wind power data-centered database. In this paper, a logical data modeling method was proposed and designed to establish the database of offshore wind power. In order for designing the logical data modeling of an offshore wind power system, this study carried out an analysis of design elements for the database of offshore wind power and described considerations and problems as well. Through a comparative analysis of the final database of the newly-designed off-shore wind power system against the existing SCADA System, this study proposed a new direction to bring about progress toward a smart wind power system, showing a possibility of a service-oriented smart wind power system, such as future prediction, hindrance-cause examination and fault analyses, through the database integrating various control signals, geographical information and data about surrounding environments.

Prospects and Economics of Offshore Wind Turbine Systems

  • Pham, Thi Quynh Mai;Im, Sungwoo;Choung, Joonmo
    • Journal of Ocean Engineering and Technology
    • /
    • v.35 no.5
    • /
    • pp.382-392
    • /
    • 2021
  • In recent years, floating offshore wind turbines have attracted more attention as a new renewable energy resource while bottom-fixed offshore wind turbines reach their limit of water depth. Various projects have been proposed with the rapid increase in installed floating wind power capacity, but the economic aspect remains as a biggest issue. To figure out sensible approaches for saving costs, a comparison analysis of the levelized cost of electricity (LCOE) between floating and bottom-fixed offshore wind turbines was carried out. The LCOE was reviewed from a social perspective and a cost breakdown and a literature review analysis were used to itemize the costs into its various components in each level of power plant and system integration. The results show that the highest proportion in capital expenditure of a floating offshore wind turbine results in the substructure part, which is the main difference from a bottom-fixed wind turbine. A floating offshore wind turbine was found to have several advantages over a bottom-fixed wind turbine. Although a similarity in operation and maintenance cost structure is revealed, a floating wind turbine still has the benefit of being able to be maintained at a seaport. After emphasizing the cost-reduction advantages of a floating wind turbine, its LCOE outlook is provided to give a brief overview in the following years. Finally, some estimated cost drivers, such as economics of scale, wind turbine rating, a floater with mooring system, and grid connection cost, are outlined as proposals for floating wind LCOE reduction.

Comparative Assessment of Wind Resources Between West Offshore and Onshore Regions in Korea (서해상과 연안지역의 풍력기상자원 비교평가)

  • Kim, Dae-Young;Jeong, Hyeong-Se;Kim, Yeon-Hee;Kim, Baek-Jo
    • Atmosphere
    • /
    • v.28 no.1
    • /
    • pp.1-13
    • /
    • 2018
  • Characteristics of wind resources of offshore and coastal regions were compared using wind data obtained from HeMOSU-1 (Herald of Meteorological and Oceanographic Special Unit-1) meteorological mast located at Southwestern Sea, and ground-based LiDAR (Light Detection And Ranging) at Gochang observation site near it. The analysis includes comparison of basic wind statistics such as mean wind speed, wind direction, power law exponent and their temporal variability as well as site assessment items for the wind power plant such as turbulence intensity and wind power density at the two observation sites. It was found that the wind at HeMOSU-1 site has lower diurnal and seasonal variability than that at Gochang site, which lead to smaller turbulence intensity. Overall, the results of the comparative analysis show that the wind resource at HeMOSU-1 site located offshore has more favorable condition for wind power generation than the wind resource at Gochang which shows nature of coastal area.