• Title/Summary/Keyword: Offshore structure installation

Search Result 65, Processing Time 0.033 seconds

Analytical Research of Topside Installation in Mating phase with Crane Vessel

  • Lee, Jong-Hyun
    • Journal of Ocean Engineering and Technology
    • /
    • v.25 no.4
    • /
    • pp.1-6
    • /
    • 2011
  • The installation of a topside structure can be categorized into the following stages: start, pre-lifting, lifting, lifted, rotating, positioning, lowering, mating, and end of installation. The transfer of the module onto the floating spar hull occurs in the last three stages, from lowering to the end. The coupled multi-body motions are calculated in both calm water and in irregular waves with a significant wave height (1.52m). The effects of the hydrodynamic interactions between the heavy lifting vessel and the spar hull during the lowering and mating stages are considered. The internal forces caused by the load transfer and ballasting are derived for the mating phases. The results of the internal forces for the calm water condition are compared with those in the irregular sea condition. Although the effect of the pitch motion on the relative vertical motion between the deck of the floating structure and the topside module is significant in the mating phases, the internal force induced pitch motion is too small to have this influence. However, the effect of the internal force on the wave-induced heave responses in the mating phases is noticeable in the irregular sea condition because transfer mass-induced draught changes for the floating structure are observed to have higher amplitudes than the external force induced responses. The impacts of the module on the spar hull in the mating phase are investigated.

Critical Limits of Commercial Diving on the Construction of Tidal Current Power in Jangjuk Channel (장죽수로 조류발전건설시 작업특성에 따른 산업잠수 작업한계)

  • Kim, Won-Seok
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.25 no.3
    • /
    • pp.733-742
    • /
    • 2013
  • The Korea has significant tidal current energy resources, but it is so hard to work underwater for tidal turbine installation. Therefore commercial diving work is very important for tidal current generator. Also, Jangjuk channel is vary famous as proper area to generate tidal current energy. Nevertheless, no one is studied about characteristics of commercial diving works with installation of tidal current generator. The purpose of this study is to introduce commercial diving with work types and investigate critical limits of diving working under the conditions, which are working only to minutes at slack tide during the neap tide. As the results, work types are five as like mooring installation, OMAS(Offshore Maintenance Access System), support structure installation, cable and turbine installation. Here, the original construction period is expected about 4 months, but the construction take 18 months to complete. The cause of extends construction period is insufficiency of researching tidal current conditions at the site and ignorance of slack tide which need to secure diving working time. Total diving working times are 110th during 18 months, the highest percentage of diving times is turbine installation about 43.6 %, and cable, mooring installation and support structure construction are 27.3 %, 15.5 %, 13.6 %, respectively. On the basis of this study, estimation of times of commercial diving is possible with work types of tidal current power, and has a significance as basic data to determining construction period.

A Study on the optimal design of lattice boom crane for offshore plant (해양플랜트용 라티스 붐 크레인의 최적 설계에 관한 연구)

  • Kim, Hyun-ji;Kim, Ji-hye;Park, Sang-hyeok;Choi, Si-yeon;Huh, Sun-chul
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.6
    • /
    • pp.757-765
    • /
    • 2019
  • In manufacturing An offshore plant is a structure that produces resources buried in the seabed. It can be classified into fixed, floating, and hybrid methods depending on the installation method. In particular, the Lattice boom type crane is typically used because it is used for a long time in the sea and moves to other seas, which is less affected by wind. In this study, the crane was designed by using three-step optimization design in the early stage of the design of Lattice boom crane for offshore plant. Finite element analysis was performed to verify the safety factor, deflection, buckling coefficient and fatigue life of the designed crane and the results were verified.

Buckling of monopod bucket foundations-influence of boundary conditions and soil-structure interaction

  • Madsen, Soren;Pinna, Rodney;Randolph, Mark;Andersen, Lars V.
    • Wind and Structures
    • /
    • v.21 no.6
    • /
    • pp.641-656
    • /
    • 2015
  • Using large monopod bucket foundations as an alternative to monopiles for offshore wind turbines offers the potential for large cost savings compared to typical piled foundations. In this paper, numerical simulations are carried out to assess the risk of structural buckling during installation of large-diameter bucket foundations. Since shell structures are generally sensitive to initially imperfect geometries, eigenmode-affine imperfections are introduced in a nonlinear finite-element analysis. The influence of modelling the real lid structure compared to classic boundary conditions is investigated. The effects of including soil restraint and soil-structure interaction on the buckling analysis are also addressed.

Analytical Approach of Sliding Installation Method with Spar Structure

  • Lee, Jong-Hyun
    • Journal of Navigation and Port Research
    • /
    • v.35 no.7
    • /
    • pp.575-580
    • /
    • 2011
  • It is important to understand the trajectory of structure in launching process because of the short time of launching process may result in unexpected accidents or damage to structures. The high risk of structural failure is not avoidable without the fully comprehension of changing forces in launching procedure. The commercial software can evaluate the motion of launching event in calm water condition but there is the limitation of research application because of the programmed commercial software. The launching process of the spar hull is suggested with stage concept that is divided into 10 stages in time domain. A force equilibrium diagram is derived for each stage where the changes of force vector and motion characteristics take place. In particular, the effects of changes in buoyancy and drag force due to the progressive submergence of the spar hull are taken into account by means of a touch length concept. The results contained in this paper provide the valuable information of the trajectory motion evaluation with suggested methods in spar launching process with sliding barge. Furthermore, the presented stage concept and touch length concept will provide basic knowledge for understanding launching process and help to develop further research area for launching analysis.

Numerical Analysis of Offshore Installation Using a Floating Crane with Heave Compensator in Waves (Heave Compensator를 고려한 파랑 중 해상 크레인 설치작업 수치해석)

  • Nam, Bo-Woo;Hong, Sa-Young;Kim, Jong-Wook;Lee, Dong-Yeop
    • Journal of Ocean Engineering and Technology
    • /
    • v.26 no.1
    • /
    • pp.70-77
    • /
    • 2012
  • In this study, a numerical analysis of offshore installation using a floating crane with heave compensator is carried out in time domain. The motion analysis of crane vessels is based on floating body dynamics using convolution integral and the crane wire is treated as simple spring. The lifted structure is assumed as a rigid body with 3 degree-of-freedom translational motion. The heave compensator is numerically modelled by the generalized spring-damper system. Firstly, forced motion simulations of crane wire system are carried out to figure out the basic principle of heave compensator. The transfer function of crane wire system is obtained and effective wave period of heave compensator are found. Then, coupled analysis of crane vessel, crane wire, and lifted structure are performed in regular and irregular sea conditions. Two different crane vessels and two lifted structures (suction pile and manifold) are considered in this study. Through a series of numerical calculations, the effective zone of heave compensator is investigated with respect to wave period and crane wire length.

A proposal of marine geophysical exploration techniques for offshore plant installation (해양플랜트 설치를 위한 해양물리탐사 기법 제안)

  • Ha, Ji-Ho;Ko, Hwi-Kyung;Cho, Hyen-Suk;Chung, Woo-Keen;Ahn, Dang;Shin, Sung-Ryul
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.37 no.2
    • /
    • pp.242-251
    • /
    • 2013
  • Recently, while global concern over offshore resources exploration and development is being increased rapidly, offshore plant industry is highlighted as an industry of high added value. Along with this global trend, domestic concern over offshore plant development is being increased as well. In the overseas case, a marine geotechnical survey guideline for confirming characteristics of seabed sediments is available at the time of installation of offshore plant but such guideline is not available in our country. In this study, survey techniques fit for domestic marine environment was applied according to overseas guideline at southern coastal area, Korea. Among the marine geophysical survey techniques being proposed abroad, magnetic survey and seabed photograph were excluded. However, highly reliable data analysis was enabled for marine geophysical survey, which includes in-situ coring investigation and laboratory soil test. In addition, continuous ocean current survey was included to find scour potential due to the current around the offshore plant. Although coring depth is not so deep, we predicted geological structure through the analysis of amplitude features of seismic data. Characteristics of seabed sediments cold be obtained regionally and directly through combined analysis of marine geophysical survey data and coring data.

Effects of Heat Inputs on the Mechanical Properties of FCA Weldment of YP 690MPa Grade Steels (항복강도 690MPa급 전자세용 FCA 용접와이어 개발에 있어 용접 입열의 영향 평가)

  • Jo, Young-Ju;Seo, Dae-Gon;Shin, Yong-Taek
    • Journal of Welding and Joining
    • /
    • v.34 no.6
    • /
    • pp.11-15
    • /
    • 2016
  • YP 690MPa grade steels are used as the main structural steel for offshore structure such as Jack-up Rig and WTIV(Wind Turbine Installation Vessel). Most of welding consumables applied to YP 690MPa grade steels are basic type flux cored wires that shows the poor weldability and not suitable for all position welding. For this reason, welding consumables with rutile type flux system is required. Rutile type flux cored wires show excellent weldability and apply to all position welding. This paper presents the mechanical properties of weld metal with rutile type flux cored wire developed and finally assessed the possibility for application.

Legal Issues Relating to Artificial Islands, Installations and Structures in the Exclusive Economic Zone or on the Continental Shelf and Korea's Practice (국제해양법상 인공섬, 시설 및 구조물 제도의 쟁점과 우리나라의 입법태도에 관한 고찰 -배타적 경제수역 및 대륙붕을 중심으로)

  • Lee, Yong Hee
    • Ocean and Polar Research
    • /
    • v.36 no.4
    • /
    • pp.353-365
    • /
    • 2014
  • Artificial islands, installations and structures have been used as a major means for ocean development and management since the early 20th century. The International legal regime to regulate the man-made offshore structures also have evolved and the UN Convention on the Law of the Sea (UNCLOS) acts as a basic international instrument for that purpose. Although the Convention includes more detailed provisions on man-made offshore structures, there are some legal issues regarding jurisdiction of coastal State on the man-made offshore structures in the Exclusive Economic Zone (EEZ) or on the Continental shelf. For this reason, this article begins by reviewing the 1958 Convention on the Continental shelf and the UNCLOS by focusing on the EEZ and the Continental shelf regime governing the man-made offshore structures. It next examines some controversial international legal issues that have emerged from the regulation of man-made offshore structures in the EEZ or on the Continental shelf. This is followed by a review of the Korean domestic laws regulating artificial islands, installations and structures in the EEZ or on the continental shelf. Finally, it closes by summarizing the findings of the above examinations, and suggests some recommendations for future works.

Modified Empirical Formula of Dynamic Amplification Factor for Wind Turbine Installation Vessel (해상풍력발전기 설치선박의 수정 동적증폭계수 추정식)

  • Ma, Kuk-Yeol;Park, Joo-Shin;Lee, Dong-Hun;Seo, Jung-Kwan
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.27 no.6
    • /
    • pp.846-855
    • /
    • 2021
  • Eco-friendly and renewable energy sources are actively being researched in recent times, and of shore wind power generation requires advanced design technologies in terms of increasing the capacities of wind turbines and enlarging wind turbine installation vessels (WTIVs). The WTIV ensures that the hull is situated at a height that is not affected by waves. The most important part of the WTIV is the leg structure, which must respond dynamically according to the wave, current, and wind loads. In particular, the wave load is composed of irregular waves, and it is important to know the exact dynamic response. The dynamic response analysis uses a single degree of freedom (SDOF) method, which is a simplified approach, but it is limited owing to the consideration of random waves. Therefore, in industrial practice, the time-domain analysis of random waves is based on the multi degree of freedom (MDOF) method. Although the MDOF method provides high-precision results, its data convergence is sensitive and difficult to apply owing to design complexity. Therefore, a dynamic amplification factor (DAF) estimation formula is developed in this study to express the dynamic response characteristics of random waves through time-domain analysis based on different variables. It is confirmed that the calculation time can be shortened and accuracy enhanced compared to existing MDOF methods. The developed formula will be used in the initial design of WTIVs and similar structures.