• Title/Summary/Keyword: Offshore projects

Search Result 88, Processing Time 0.026 seconds

A Study on the Environmental Impact of Offshore Wind Farms Through Monitoring Case in Overseas Country (W국외 모니터링 사례를 통한 해상풍력발전의 환경적 영향 고찰)

  • Maeng, Jun-Ho;Cho, Beom-Jun;Lim, O-Joung;Seo, Jane
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.16 no.4
    • /
    • pp.276-289
    • /
    • 2013
  • In developing offshore wind farms, many environmental issues arise because of the concentration on supply demand and economic logic. Accordingly, community conflict is induced. Especially, recent studies regarding the capacity and location of offshore wind development have been conducted considering wind states and ocean conditions, etc. of coastal seas in Republic of Korea. Nevertheless, studies on the impact of marine environments and ecosystems are very limited so far. Environmental monitoring that follows development projects has been actively done in the offshore wind farms in many developed European countries. In contrast, there is no domestic monitoring data regarding environmental impacts caused by installing and operating offshore wind power. Therefore, the environmental impacts under construction and operation phases as well as the guidelines in the stage of environmental impact assessment suited for domestic coastal seas are well presented in this study by analyzing monitoring cases and references of overseas offshore wind farm. For this reason, this research is ultimately aimed at minimizing the environmental impact in offshore wind farm development and thus simplify administrative procedures in Korea.

The Maritime Environment Impact Assessment of Offshore Floating Wind Power in Ulsan - A Focus on Habitat Equivalence Analysis - (울산 부유식 해상풍력단지 조성에 따른 환경피해의 경제적 가치추정 - 서식지 등가성 분석법을 중심으로 -)

  • Choi, Su-Young;Moon, Beom-Sik;Kim, Tae-Goun
    • Journal of Navigation and Port Research
    • /
    • v.45 no.3
    • /
    • pp.130-137
    • /
    • 2021
  • The main purpose of this study is to provide an objective evaluation standard for the assessment of marine spatial characteristics via Ulsan floating offshore wind power project using HEA.. Various levels of damage occur in the waters (5,017.6) near the floating offshore wind power terminals in Ulsan, including commercial damage, ecological destruction and reduction in quality of life due to seascape damage. Alternative restoration projects for calculating the economic value of damage were selected including artificial reef projects and estimates based on HEA. For basic households with a 4.5% social discount rate and a 100% maturity index over four years, the damage was approximately 457 hundred million won. The HEA in this study resolves the possible irrationality in the evaluation of marine spatial characteristics, since the value is calculated based on objective and clear DATA. Therefore, the study results are intended to facilitate conflict resolution between stakeholders in the future during the implementation of the marine spatial plan.

부유식 천연액화가스(LNG) 터미널의 설계 기술 개발

  • Han Yong-Seop;Lee Jeong-Han;Kim Yong-Su
    • THE INDUSTRY AND TECHNOLOGY OF GAS
    • /
    • v.5 no.1 s.6
    • /
    • pp.39-47
    • /
    • 2002
  • With the expansion of natural gas demands in many countries, the necessity of LNG receiving terminals has been increased. The offshore LNG Floating Storage and Regasification Unit (FSRU) attracts attentions not only for a land based LNG receiving terminal alternative, but also for a feasible and economic solution. Nowadays, as the reliability of offshore oil and gas floating facilities and LNG carriers gains with proven worldwide operations, the FSRU can achieve a safety level that can be comparable to an onshore terminal. The design development related with safety features of the FSRU has been extensively carried out by oil and gas companies, shipyards, engineering companies, and equipment vendors, and has been successful so far in many fields. The construction of the FSRU can be achieved by integrating various technologies and experiences from many disciplines and many participating companies and vendors. In this paper, reviews on some of the important design features and design improvements on FSRU together with the practical construction aspects in cargo containment, vaporization system, ESD system, and operation modes, have been covered in comparison with actual LNG carrier, onshore receiving terminal, and FPSO systems. In order to materialize an FSRU project, the technical and economic justification has to be preceded. It is believed that once the safety and technical soundness is convinced, the FSRU can bring a higher project feasibility by reducing the overall construction time and cost. Through this study, an FSRU design readily applicable to an actual project has been developed by incorporating experiences gained from many marine and offshore projects. The wide use of proven standard technologies adopted in the series construction of LNG carriers and offshore FPSOs will bring the project efficiency and reliability.

  • PDF

Analysis of the Legal Blind Sectors of the Large-Scale Offshore Wind Farms of Korea and Proposal to Improve Safety Management (대규모 해상풍력발전단지의 안전관리를 위한 법적 사각지대 분석 및 개선 제안)

  • Inchul Kim;Dong Nam
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.29 no.2
    • /
    • pp.127-138
    • /
    • 2023
  • A variety of decarbonized energy sources are being developed globally to realize carbon neutrality (Net Zero) by 2050 as a measure to address the global climate crisis. As the Korean government has also established a Renewable Energy 3020 policy and promoted energy development plans using solar or wind power, large-scale offshore development projects not present before in coastal waters, such as offshore wind farms, are being promoted. From ships' point of view, offshore facilities present obstacles to safe navigation, and with the installation of marine facilities, ship collisions or contact accidents between ships and marine facilities may occur in the narrowed water areas. In addition, there are concerns about environmental pollution and human casualties caused by marine accidents. Accordingly, we review overseas and domestic offshore wind farm development plans, analyze whether institutional devices are in place to ensure the safe passage of ships in wind farm areas, and study the safe operation of large-scale offshore wind farms and safe passage of ships along the Korean coast by comparing overseas legislative cases with domestic laws and presenting a proposal to illuminate the legal blind sectors.

Design of Pile-Guide Mooring System for Offshore LNG Bunkering Terminal: A Case Study for Singapore Port (해상 LNG 벙커링 터미널용 파일 가이드 계류 시스템 설계: 싱가포르 항의 사례 연구)

  • Lee, Seong-yeob;Chang, Daejun
    • Journal of Ocean Engineering and Technology
    • /
    • v.31 no.6
    • /
    • pp.379-387
    • /
    • 2017
  • In this study, a pile-guide mooring system (PGMS) was designed for an offshore liquefied natural gas bunkering terminal (LNG-BT), which is an essential infrastructure for large LNG-fuelled ships. The PGMS consisted of guide piles to restrict five motions of the floater, except for heave, as well as a seabed truss structure to support the guide piles and foundation piles to fix the system to the seabed. Singapore port was considered for a case study because it is a highly probable ports for LNG bunkering projects. The wave height, current speed, and wind speed in Singapore port were investigated to calculate the environmental loads acting on the hull and PGMS. A load and resistance factor approach was used for the structural design, and a finite element analysis was performed for design verification. The steel usage of the PGMS was analyzed and compared with the material usage of a gravity-based structure under similar LNG capacity and water depth criteria. This paper also describes the water depth limit and wave conditions of the PGMS based on estimation of the initial investment and the present value profit difference. It suggests a suitable LNG-BT support system for various design conditions.

Diagnosis for Status of Dredging and Ocean Disposal of Coastal Sediment in Korea (우리나라 연안준설 및 준설토 해양투기 현황 진단)

  • Eom, Ki-Hyuk;Lee, Dae-In;Park, Dal-Soo;Kim, Gui-Young
    • Journal of Environmental Impact Assessment
    • /
    • v.18 no.3
    • /
    • pp.185-193
    • /
    • 2009
  • This study documented and diagnosed the status and problems of coastal dredging and offshore disposal of dredged sediments in South Korea to improve assessment procedures for marine environmental impacts and develop effective management systems. A total of $729({\times}10^6)m^3$ of coastal sediment was dredged in the harbors during the period of 2001-2008. Most of dredged sediment was disposed to the land dumping sites whereas ocean disposal accounted for less than 5%. Ocean disposal areas were especially concentrated to the exclusive economic zone (EEZ) in the southeast of Busan, which is not only an important fishing area for fishermen, but also considered to be spawning and nursery ground for some commercial fish species. To minimize negative impacts of dredging and ocean disposal of coastal sediment on marine ecosystem and potential strife among coastal users, we suggest 1) in development projects involving ocean disposal, it should be mandatory to propose careful reuse plans in the land, and 2) guidelines of environmental assessment and consequence management programs should be developed and implemented.

Transmission and Substation Planning Study for Grid Connection of Floating Offshore Wind Power (부유식 해상풍력 계통연계를 위한 송변전설비계획 연구)

  • Chung-Hwan Lim;Moon-Sung Bae;Yong-Doo Shin;Chae-Joo Moon
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.19 no.1
    • /
    • pp.53-64
    • /
    • 2024
  • The Yeongnam southeastern region, with Ulsan as its focal point, is planning large-scale floating offshore wind power projects. Additionally, due to the establishment of new nuclear power plants and the extension of existing ones, there is a demand for the expansion of the power grid. The government has announced plans to establish a new power grid for this region as part of the 10th power supply plan. However, there are anticipated challenges in the actual construction phase, primarily because of the presence of national parks and cultural heritage protection zones near Gyeongju. As a result, this study presents an alternative approach that minimizes the creation of new power lines by utilizing existing ones. Using the Power System Simulator for Engineers (PSS/E), an analysis of transient stability was conducted and demonstrated its feasibility.

An Assessment of Technological Competitiveness in Core Products of Foreign Design & Construction markets (해외 유망 건설상품의 기술 경쟁력 평가)

  • Choi, Seok-In;Kim, Sang-Bum;Lee, Young-Whan;Kim, Woo-Young;Jang, Hyoun-Seung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.107-117
    • /
    • 2008
  • In this study, surveys and interviews are used to evaluate technological competitiveness of each product with respect to that of foreign leading firms, for seven leading domestic construction products which have been determined to have competitive edge in offshore markets, Such evaluation provides a more in depth study than previously conducted research, and is meaningful in that corporate level, rather than industry level, perspective is projected. Major findings of such evaluations are the following. First, as expected, it has been evaluated that domestic technological competitiveness in desalination plant and power plant has reached the point where it can compete with foreign leading firms. Moreover, a noteworthy result of the evaluation is that development program sector, including urban development of satellite cities, has reached considerable level of competitiveness in offshore market. In the case of the development market, domestic firms have accumulated sufficient experience in domestic market and engineering technology is not a decisive factor as in plant sector, and these factors lead to such an evaluation. Second, in the cases of gas, oil refinery and petro-chemical plants, domestic products' technological competitiveness that can contest in offshore market is still centered around production and construction. On the other hand, there are still weaknesses in license technology and basic design capabilities, which constitute the "value added" area. Third, skyscrapers, a promising product in offshore construction market and a product group which domestic firms have much performance record and projects in progress both in domestic and offshore markets, are considered. While direct comparison between skyscrapers and plant sector is not feasible, with the exception of production and construction, overall domestic capability in this sector has been assessed to be the lowest amongst those products that were surveyed. Fourth, it has been indicated that competitiveness is relatively higher in common technology than in key technology. In project management capability, it has been assessed that there are weaknesses in procedure document area. Also, a characteristic is the point that low overall assessments have been given across all product groups for corporate and management areas, not technological areas. Especially, financing, contracting/claim, risk management and investment on research and development received low evaluations. Fifth, it has been assessed that overall corporate and governmental supports are weak. This result is especially evident for corporate management and support areas across all product groups surveyed.

Comparative Analysis on the Design Conditions for Offshore Wind Power Structures in the Coastal Sea of Korea (한국 연안 해상풍력 구조물의 설계조건 비교분석)

  • Ko, Dong Hui;Jeong, Shin Taek;Cho, Hongyeon;Kang, Keum Seok
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.26 no.1
    • /
    • pp.25-32
    • /
    • 2014
  • Offshore wind power structures are subject to coastal hydrodynamic loading such as wind and wave loads. A considerable number of turbines have been installed in Europe, but so far none in Korea. Interest in offshore wind energy is growing in Korea, and it is expected that projects will reach the design stage in the near future. This paper discusses the level of structural reliability implied by the design rules of ABS(2010, 2013) and IEC(2009). Metocean conditions in 4 Korean seas(Gunsan, HeMOSU 1, Mokpo, Jeju) were used in the calibrations to calculate the aerodynamic and hydrodynamic loads as well as the structural responses of the typical designs of offshore wind turbines. Due to the higher variability of the wind and wave climate in hurricane-prone areas, applying IEC strength design criteria in combination with Korea west sea conditions could result in a design with much lower reliability index than what is anticipated from a design in European waters. To achieve the same level of safety as those in European waters, application of ABS 100 year design standards are recommended. Level-1 reliability-based design suitable for the Korean sea state conditions should be introduced because the IEC standards does not consider the typhoon effects in depth and the ABS standards is a WSD design method. In addition, the design equation should be established based on the statistical characteristics of the wind and wave loads of the Korean sea areas.

A Study on the Optimal Site Selection by Constraint Mapping and Park Optimization for Offshore Wind Farm in the Southwest Coastal Area (서남해 연안 해상풍력 발전단지 지리적 적합지 선정 및 최적배치에 관한 연구)

  • Jung-Ho, Kim;Geon-Hwa, Ryu;Hong-Chul, Son;Young-Gon, Kim;Chae-Joo, Moon
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.17 no.6
    • /
    • pp.1145-1156
    • /
    • 2022
  • In order to effectively secure site suitability for the development of large-scale offshore wind farms, it is essential to minimize the environmental impact of development and analyze the conflicts of benefit between social, ecological, and economic core values. In addition, a preliminary review of site adequacy must be preceded in order not to collide with other used areas in the marine spatial plan. In addition, it is necessary to conduct local meteorological characteristics analysis including wind resources near Jeollanam-do area before project feasibility study. Therefore, wind resource analysis was performed using the observation data of the meteorological mast installed in Wangdeungnyeo near Anmado, Yeonggwang, and the optimal site was selected after excluding geographical constraints related to the location of the offshore wind farm. In addition, the annual energy production was calculated by deriving the optimal wind farm arrangement results suitable for the local wind resources characteristics based on WindSim SW, and it is intended to be used as basic research data for site discovery and selection of suitable sites for future offshore wind farm projects.