• Title/Summary/Keyword: Offshore projects

Search Result 90, Processing Time 0.025 seconds

Case Study on Offshore Wind Resource and Energy Yield Assessment in South Korea According to International Standard Guidelines (국제 표준 지침에 따른 국내 풍력자원 및 연간발전량 평가 방법에 관한 사례 분석 연구)

  • Geonhwa Ryu;Dohee Lee;Hyojeong Kim;Okan Sargin
    • Journal of Wind Energy
    • /
    • v.15 no.3
    • /
    • pp.38-61
    • /
    • 2024
  • The purpose of this study is to introduce in detail an universal methodology of wind resource and energy yield assessment for feasibility studies of offshore wind projects. To conduct a preliminary feasibility study for offshore wind projects, an assessment of wind resources and energy yield are usually performed at an early stage, and this can be an essential process for deriving an economic feasibility evaluation of the project. However, many domestic case studies and preliminary feasibility studies are still conducted using methodologies that lack valid evidence and professionalism. Accordingly, this study introduces methods for general wind resource assessments, wind farm layout (design), and energy yield assessments, and gives detailed reasons why the analysis procedure is necessary. In other words, it was carried out to support to improve the quality and level of basic research related to domestic offshore wind studies.

Big data-based piping material analysis framework in offshore structure for contract design

  • Oh, Min-Jae;Roh, Myung-Il;Park, Sung-Woo;Chun, Do-Hyun;Myung, Sehyun
    • Ocean Systems Engineering
    • /
    • v.9 no.1
    • /
    • pp.79-95
    • /
    • 2019
  • The material analysis of an offshore structure is generally conducted in the contract design phase for the price quotation of a new offshore project. This analysis is conducted manually by an engineer, which is time-consuming and can lead to inaccurate results, because the data size from previous projects is too large, and there are so many materials to consider. In this study, the piping materials in an offshore structure are analyzed for contract design using a big data framework. The big data technologies used include HDFS (Hadoop Distributed File System) for data saving, Hive and HBase for the database to handle the saved data, Spark and Kylin for data processing, and Zeppelin for user interface and visualization. The analyzed results show that the proposed big data framework can reduce the efforts put toward contract design in the estimation of the piping material cost.

A Study on Landscape Quality Assessment Techniques for Offshore Wind Farms - Focusing on Overseas Guidelines Cases - (해상풍력발전단지 경관의 질 평가 기법에 관한 연구 - 해외가이드라인 사례를 중심으로 -)

  • Jin-Oh Kim;Byoungwook Min;Kyung-Sook Woo;Jin-Pyo Kim
    • Journal of Environmental Impact Assessment
    • /
    • v.32 no.4
    • /
    • pp.230-241
    • /
    • 2023
  • At a time when it is urgent to establish a management system for landscape quality assessment of offshore wind farms in Korea, we analyzed foreign cases to draw implications for improving the landscape quality assessment of offshore wind farms in Korea and to explore the direction of efficient landscape assessment. The main contents derived from the analysis of overseas cases and systems are as follows. First, offshore wind farms are large-scale projects, and it is necessary to consider the landscape from the pre-planning stage, as in overseas cases. Second, the evaluation items for marine landscape quality should be expanded and systematized. Third, a flexible evaluation system that can consider new landscape impacts is required. In order to identify the landscape impacts of offshore wind farm projects, we refer to the landscape assessment items and procedures derived from overseas cases, but reflect them appropriately to the domestic maritime conditions, and specifically introduce a plan to minimize the landscape impacts that may occur during offshore wind farm projects to contribute to the sustainable use of offshore wind power.

Economic Valuation of the Off-Shore Fisheries Stock Enhancement Project (근해 수산자원 증대사업의 경제적 타당성 평가)

  • Kang, Seok-Kyu;Ryu, Jeong-Gon;Sim, Seong-Hyun;Oh, Tae-Geon;Lim, Byeong-Gwon
    • The Journal of Fisheries Business Administration
    • /
    • v.52 no.2
    • /
    • pp.1-31
    • /
    • 2021
  • This study is to evaluate the prior economic feasibility of the off-shore fisheries stock enhancement project. The main findings of this study can be summarized as follows: first, offshore fisheries stock enhancement project shall be implemented by dividing them into 1st·2nd·3rd projects for efficient promotion. The 1st·2nd·3rd projects will be conducted in a total of 50 locations (the eastern sea, the western sea, the southern sea, and the jeju sea areas), and the project period per unit will be five years, which will cost 1 trillion won. Second, according to the results of the survey on public awareness, the most consumed marine species in Korea over the past year were analyzed in the order of mackerel, hairtail, squid, yellow corvina, blue crab, and cod. The dominant response to the reason for consuming marine products in Korea was healthy well-being food and safe food. In addition, 67.9% of them have hesitated to purchase offshore fish species over the past year due to high prices, indicating that they are burdened by high prices. On the other hand, 79% of the respondents said that the government's policy was insufficient, according to a survey on whether the government's coastal marine resource creation policy was sufficient. Third, as a result of preliminary economic analysis of offshore fisheries stock enhancement project, the benefit-cost ratio is 4.01, net present price is 1,283.7 billion won, and internal rate of return is 91.7% per year, which means that the economic analysis ensures the feasibility of the projects. The results of this study provide useful information on securing or organizing budgets for offshore fisheries stock enhancement project by securing economic feasibility as a national infrastructure project that increases fishery income and public benefits such as consumption of marine products.

A Study on Local Acceptance of Offshore Wind Farm: Focus on Maldo, Gunsan (해상풍력 주민수용성 연구: 군산 말도를 중심으로)

  • Lee, Sanghyuk;Park, Jaepil
    • New & Renewable Energy
    • /
    • v.16 no.2
    • /
    • pp.20-27
    • /
    • 2020
  • According to "The Renewable Energy 3020 Implementation Plan", offshore wind power accounts for 12 GW of the total new capacity of 48.7 GW. Like the south-west 2.5 GW offshore wind farm case, government-led development has had difficulty in securing the residents' acceptability. This study contributes to the study of local acceptance by analyzing the perceptions of Maldo residents. To this end, in-depth interviews were conducted with the head of a village and fishing village chief, and the entire contents of the interview were revised and analyzed. The cognitive structure of the stakeholders could be confirmed using semantic network analysis, which analyzes the network structure among words. Based on the analysis results, focusing on the identity frames related to the compensation process from previous national projects, gain vs. loss frames act as the dominant frame in terms of profits from offshore wind turbines. To invigorate offshore wind farms, the policy implications as follows. First, a negotiation organization should be organized to deal with strategic opposition by fishes. Second, installing offshore wind farms on a public water body will result in demands for compensation from various actors, and a licensed fishing territory as an offshore wind farm installation site should be considered.

Seismic response evaluation of fixed jacket-type offshore structures by random vibration analysis

  • Abdel Raheem, Shehata E.;Abdel Aal, Elsayed M.;AbdelShafy, Aly G.A.;Fahmy, Mohamed F.M.
    • Steel and Composite Structures
    • /
    • v.42 no.2
    • /
    • pp.209-219
    • /
    • 2022
  • Offshore platforms in seismically active areas must be designed to survive in the face of intense earthquakes without a global structural collapse. This paper scrutinizes the seismic performance of a newly designed and established jacket type offshore platform situated in the entrance of the Gulf of Suez region based on the API-RP2A normalized response spectra during seismic events. A nonlinear finite element model of a typical jacket type offshore platform is constructed taking into consideration the effect of structure-soil-interaction. Soil properties at the site were manipulated to generate the pile lateral soil properties in the form of load deflection curves, based on API-RP2A recommendations. Dynamic characteristics of the offshore platform, the response function, output power spectral density and transfer functions for different elements of the platform are discussed. The joints deflection and acceleration responses demands are presented. It is generally concluded that consideration of the interaction between structure, piles and soil leads to higher deflections and less stresses in platform elements due to soil elasticity, nonlinearity, and damping and leads to a more realistic platform design. The earthquake-based analysis for offshore platform structure is essential for the safe design and operation of offshore platforms.

Wind Resource Assessment on the Western Offshore of Korea Using MERRA Reanalysis Data (MERRA 재해석자료를 이용한 서해상 풍력자원평가)

  • Kim, Hyun-Goo;Jang, Moon-Seok;Ryu, Ki-Wahn
    • Journal of Wind Energy
    • /
    • v.4 no.1
    • /
    • pp.39-45
    • /
    • 2013
  • Massive offshore wind projects of have recently been driven in full gear on the Western Offshore of Korea including the 2.5 GW West-Southern Offshore Wind Project of the Ministry of Trade, Industry and Energy, and the 5 GW Offshore Wind Project of the Jeollanamdo Provincial Government. On this timely occasion, this study performed a general wind resource assessment on the Western Offshore by using the MERRA reanalysis data of temporal-spatial resolution and accuracy greatly improved comparing to conventional reanalysis data. It is hard to consider that wind resources on the Western Sea are excellent, since analysis results indicated the average wind speed of 6.29 ± 0.39 m/s at 50 m above sea level, and average wind power density of 307 ± 53 W/m2. Therefore, it is considered that activities shall be performed for guarantee economic profits from factor other than wind resources when developing an offshore wind project on the Western Offshore.

A Study on the Application of DC HTS cable systems to enhance power transfer limits of a grid-connected offshore wind farm

  • Hur, Jin
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.2
    • /
    • pp.97-103
    • /
    • 2015
  • This paper introduces two on-going projects for DC high temperature superconducting (HTS) cable systems in South Korea. This study proposes the application of DC HTS cable systems to enhance power transfer limits of a grid-connected offshore wind farm. In order to develop the superconducting DC transmission system model based on HTS power cables, the maximum transfer limits from offshore wind farm are estimated and the system marginal price (SMP) calculated through a Two-Step Power Transfer (TSPT) model based on PV analysis and DC-optimal power flow. The proposed TSPT model will be applied to 2022 KEPCO systems with offshore wind farms.

Method for determining the design load of an aluminium handrail on an offshore platform

  • Kim, Yeon Ho;Park, Joo Shin;Lee, Dong Hun;Seo, Jung Kwan
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.13 no.1
    • /
    • pp.511-525
    • /
    • 2021
  • Aluminium outfitting is widely used in offshore platforms owing to its anti-corrosion ability and its light weight. However, various standards exist (ISO, NORSOK and EN) for the design of handrails used in offshore platforms, and different suppliers have different criteria. This causes great confusion for designers. Moreover, the design load required by the standards is not clearly defined or is uncertain. Thus, many offshore projects reference previous project details or are conservatively designed without additional clarification. In this study, all of the codes and standards were reviewed and analysed through prior studies, and data on variable factors that directly and indirectly affect the handrails applied to offshore platforms were analysed. A total of 50 handrail design load scenarios were proposed through deterministic and probabilistic approaches. To verify the proposed new handrail design load selection scenario, structural analysis was performed using SACS (offshore structural analysis software). This new proposal through deterministic and probabilistic approaches is expected to improve safety by clarifying the purpose of the handrails. Furthermore, the acceptance criteria for probabilistic scenarios for handrails suggest considering the frequency of handrail use and the design life of offshore platforms to prevent excessive design. This study is expected to prevent trial and error in handrail design while maintaining overall worker safety by applying a loading scenario suitable for the project environment to enable optimal handrail design.

A Review on Environmental Impact Assessment of Offshore Wind Farms Related to the life-history of Marine Birds on the Korean Peninsula (한반도 해양성 조류의 생활사적 특성을 고려한 해상풍력발전 환경영향평가에 대한 고찰)

  • Seungyeon Lee;Who-Seung Lee
    • Journal of Wind Energy
    • /
    • v.14 no.3
    • /
    • pp.69-82
    • /
    • 2023
  • Offshore wind farms (OWFs) should be promoted as part of global efforts to respond to climate change, and efforts to preserve biodiversity in terms of climate change adaptation should also be considered. However, the ecological status of marine birds related to OWFs on the Korean Peninsula, such as habitat and reproduction, are not well known. In this study, ecological reasons for the reproductive status of Black-tailed gulls in Korea and representation related to OWFs, the evaluation direction of marine birds related to OWFs was presented. In a review of the techniques for monitoring marine birds, it was confirmed that Korea also needs to provide basic status information on marine birds at the national level. In addition, this study analyzed the reproductive status and related research status of Black-tailed gulls, an important indicator and dominant species on the Korean Peninsula, in relation to marine development projects including OWFs. Furthermore, the direction of environmental impact assessment preparation and impact prediction for various development projects promoted in the ocean, such as OWFs, was considered.