해양플랜트 인력양성을 위한 직무능력향상 매트릭스 개발에 관한 연구 -해기사의 직업전환을 중심- (A Study on Development of Gap Competency Matrix for Offshore Workforce -Focusing on the Job Transportation for Seafarers-)

  • 이진우;이창희
    • 수산해양교육연구
    • /
    • 제28권2호
    • /
    • pp.407-416
    • /
    • 2016
  • The offshore plant industry has basically functioned with a rigid teamwork culture and many operations are managed by ship's crew, shifts and affiliates together. The marine sector of offshore plant has much similarity with ship's environment. So a person who had experienced on board will have advantages to work for offshore industry. But in spite of all that, only a few korean seafarers are able to join in the offshore industry due to lack of information about the offshore environment. This study analyze the employee's wage structure, nature of employment contract, requirements of job qualifications. Therefore, this study will assist for seafarers to set up how to get their work and also suggest to develop relevant offshore training courses by researching the gap competency matrix.

프로그램 매크로언어를 이용한 해양 플랜트 케이블 트레이의 파라메트릭 설계 도구 개발 (Development of Parametric Design Tool for Offshore Plant Cable Tray Using PML)

  • 김현철
    • 한국산학기술학회논문지
    • /
    • 제20권2호
    • /
    • pp.632-637
    • /
    • 2019
  • 해양 플랜트 전장생산설계의 케이블 트레이 설계는 구조 부재 및 각종 의장 장비들과 간섭없이 케이블이 설치될 수 있도록 3D 모델링하여 원활하게 최적 배치하는 작업으로, 대부분 PDMS(Plant design management system)를 이용하여 수행되고 있다. PDMS는 해양 플랜트 생산설계 전용 3D CAD 시스템으로 국내 조선소와 관련 설계협력업체에서 널리 사용되고 있다. 본 연구에서는 PDMS 기반 해양 플랜트 케이블 트레이 설계 지원 PML(Programmable macro language)을 개발하여, 기존 방법 대비 업무 효율성을 검토하였다. 개발된 케이블 트레이 설계 PML은 전장 템프릿 라이브러리를 이용하여 완전히 파라메트릭 설계가 가능하도록 함으로써 설계 변경으로 인한 빈번한 수정 작업에 신속히 대응할 있도록 하였고, 축적된 설계 경험를 반영하여 반복되는 작업 피로를 최소화할 수 있도록 하였다. 그리고 개발된 시스템을 해양 플랜트 구조 모듈에 적용하여 기존 방법 대비 약 50% 이상의 작업 효율성 향상이 예상됨을 확인하였다.

파력-해상풍력 복합발전을 위한 대형 반잠수식 플랫폼의 개념설계 (Conceptual Design of Large Semi-submersible Platform for Wave-Offshore Wind Hybrid Power Generation)

  • 김경환;이강수;손정민;박세완;최종수;홍기용
    • 한국해양환경ㆍ에너지학회지
    • /
    • 제18권3호
    • /
    • pp.223-232
    • /
    • 2015
  • 본 연구에서는 부유식 파력-해상풍력 연계형 발전시스템의 기반구조물 개념설계에 대한 내용을 다루고 있다. 세계적으로 해양 신재생에너지에 대한 관심이 커져가고 있다. 파력과 해상풍력은 다른 해양에너지원과 더불어 주요 관심이 되는 에너지원으로서 발전적지가 대체로 일치한다는 특징이 있다. 따라서 파력과 해상풍력을 복합하여 발전하는 시스템은 경제적으로 많은 이점이 있고 이미 여러 나라에서 파력-해상풍력 복합발전 시스템을 개발하고 있다. 이에 따라 우리나라에서도 10MW급의 파력-해상풍력 복합발전 시스템을 개발하기 위한 연구가 수행되었다. 본 연구에서는 다수 풍력발전기와 파력발전기의 배치를 고려하여 반잠수식 구조물이 설계되었다. 또한 설치해역의 환경을 고려하여 계류시스템과 파워케이블이 설계되었다. 본 논문에서는 이러한 복합발전 플랫폼의 개념설계 결과를 제시하고 다양한 발전시스템의 배치를 고려한 설계상의 어려움을 토의하고 설계 방법을 제시한다.

조선해양플랜트산업의 디지털 전환에 따른 파급효과 분석 (Analysis of the Ripple Effect of Digital Transformation in the Shipbuilding & Offshore Plant Industry)

  • 이영규;이운식;박세훈;옥영석
    • 산업경영시스템학회지
    • /
    • 제46권spc호
    • /
    • pp.9-18
    • /
    • 2023
  • In the global manufacturing industry, digital transformation is emerging as an important issue for companies to improve productivity and strengthen industrial competitiveness. The government and shipbuilding companies drive research and development to attain advanced technologies through digital transformation for shipbuilding & offshore plants, one of Korea's representative manufacturing industries. Therefore, the digital transformation of the shipbuilding & offshore plant industry was defined using an input-output analysis model, and the economic interrelationships of industries linked to the digital transformation of the shipbuilding & offshore plant industry were analyzed. According to the analysis, the shipbuilding & offshore plant industry ranks second among all 34 industries regarding the forward linkage effect. The backward linkage effect was ranked 27th, making it a mid-demand industry with a robust forward linkage effect. In addition, the production-induced effect was 0.455, the value-added-induced effect was 0.174, and the employment-induced effect was 1.779 people per billion won. The contribution of this study is that it will provide the basis for establishing policies necessary to strengthen the competitiveness of the shipbuilding & offshore plant industry. Also, it will help analyze the economic effects of digital transformation in other manufacturing industries.

해양플랜트공사계약상 제조물인도지연에 따른 당사자의 법적 책임에 관한 고찰 (A Study on the Legal Liabilities of Contractor as a Delay in the Product Delivery on the Offshore Plant Construction Contract)

  • 진호현
    • 해사법연구
    • /
    • 제29권2호
    • /
    • pp.115-144
    • /
    • 2017
  • 2007년 미국에서 시작된 글로벌 금융위기의 영향은 국내의 해운 조선 분야에도 크게 영향을 미쳤다. 이와 관련하여 국내 조선소는 해운경기 악화로 인한 상선 수주물량 감소의 대체수단으로 여러 방면에서 수주전략을 수립하였고, 선택한 분야가 해양플랜트였다. 그러나 국내 조선소는 해양플랜트 관련 계약이 갖고 있는 위험성 분석에 대한 대비 없이 단순한 매출액 확대와 일감확보를 위한 무리한 영업 수주전략을 추진하였다. 이러한 결과, 해양플랜트 발주자와 초기에 계약한 금액보다 많은 비용이 투입되거나 제조물 인도지연에 따른 지체상금을 지급해야 하는 법적인 문제로 확대되었다. 주요 법적분쟁의 원인은 해양플랜트공사 시 발생할 수 있는 비선형모델에 의한 위험성 분석, 공정관리의 미숙, 국내 조선소가 "Engineering Procurement Construction 일괄계약"을 사용하는 해양플랜트공사계약의 이해 부족에 기인한다. 특히, 위험성 관리 항목의 한 요소로써 계약상의 독소조항에 대한 충분한 검토가 이루어지지 않은 점에 있다. 이러한 계약서를 검토할 만한 인력도 부재하다. 따라서 이 연구에서는 계약목적물의 인도지연이 발생할 수 있는 구체적 위험성의 존재를 식별하고, 해양플랜트공사계약 상에는 어떠한 불공정조항이 존재하며, 그러한 불공정조항이 실제 양 당사자에게 어떻게 적용되는지를 국내 조선소의 프로젝트 관리자의 인터뷰와 선행연구를 참조하여 구체적 위험요소가 계약상으로 어떻게 함의되는가에 대해서 살펴보았다. 이를 통하여 해양플랜트공사계약상 제조물인도지연에 관한 계약당사자의 법적 책임관계와 국내 조선 해양플랜트 산업발전에 기여할 수 있는 개선방안을 도출하였다.

해상풍력발전단지의 전력망과 해상변전소 위치에 대한 최적 설계 (Optimal Design of Power Grid and Location of Offshore Substation for Offshore Wind Power Plant)

  • 문원식;원종남;허재선;조아라;김재철
    • 전기학회논문지
    • /
    • 제64권7호
    • /
    • pp.984-991
    • /
    • 2015
  • This paper presents the methodology for optimal design of power grid for offshore wind power plant (OWPP) and optimum location of offshore substation. The proposed optimization process is based on a genetic algorithm, where the objective cost model is composed of investment, power loss, repair, and reliability cost using the net present value during the whole OWPP life cycle. A probability wind power output is modeled to reflect the characteristics of a wind power plant that produces electricity through wind and to calculate the reliability cost called expected energy not supplied. The main objective is to find the minimum cost for grid connection topology by submarine cables which cannot cross each other. Cable crossing was set as a constraint in the optimization algorithm of grid topology of the wind power plant. On the basis of this method, a case study is conducted to validate the model by simulating a 100-MW OWF.

3D Topology Optimization of Fixed Offshore Structure and Experimental Validation

  • Kim, Hyun-Seok;Kim, Hyun-Sung;Park, Byoungjae;Lee, Kangsu
    • 한국해양공학회지
    • /
    • 제34권4호
    • /
    • pp.263-271
    • /
    • 2020
  • In this study, we performed a three-dimensional (3D) topology optimization of a fixed offshore structure to enhance its structural stiffness. The proposed topology optimization is based on the solid isotropic material with penalization (SIMP) method, where a volume constraint is applied to utilize an equivalent amount of material as that used for the rule-based scantling design. To investigate the effects of the main legs of the fixed offshore structure on its structural stiffness, the leg region is selectively considered in the design domain of the topology optimization problem. The obtained optimal designs and the rule-based scantling design of the structure are manufactured by 3D metal printing technology to experimentally validate the topology optimization. The behaviors under compressive loading of the obtained optimal designs are compared with those of the rule-based scantling design using a universal testing machine (UTM). Based on the structural experiments, we concluded that by employing the topology optimization method, the structural stiffness of the structure was enhanced compared to that of the rule-based scantling design for an equal amount of the fabrication material. Furthermore, by effectively combining the topology optimization and rule-based scantling methods, we succeeded in enhancing the structural stiffness and improving the breaking load of the fixed offshore structure.

FLBT의 적하역 안정성 평가를 위한 실험적 연구 (Experimental Study on Floating LNG Bunkering Terminal for Assessment of Loading and Offloading Performance)

  • 정동우;김윤호;조석규;정동호;성홍근;권순홍
    • 한국해양공학회지
    • /
    • 제32권1호
    • /
    • pp.51-61
    • /
    • 2018
  • In this study, the operability of an FLBT (floating LNG bunkering terminal) was evaluated experimentally. Model tests were conducted in the KRISO (Korea Research Institute of Ships and Ocean Engineering) ocean engineering basin. An FLBT, an LNG carrier, and two LNG bunkering shuttles were moored side by side with mooring ropes and fenders. Two white-noise wave cases, one irregular wave case, and various regular wave cases were generated. The relative local motions between each LNG loading arm and its corresponding manifold in the initial design configuration were calculated from measured 6-DOF motions at the center of gravity of each of the four vessels. Furthermore, the locations of the LNG loading arms and manifolds were varied to minimize the relative local motions.

IT융합 해양플랜트 원격 감시 시스템 설계 (A Design of IT Conversion Remote Monitoring System for Offshore Plant)

  • 황훈규;김헌기;이재웅;김민재;유강주;이성대
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국정보통신학회 2013년도 추계학술대회
    • /
    • pp.847-850
    • /
    • 2013
  • 해양에 설치되는 플랜트는 태풍, 해일 등과 같은 환경적인 요소와 화재나 선박의 충돌 등과 같은 인공적인 요소에 의한 위협에 노출되어 있다. 본 논문에서는 이러한 위협으로부터 해양플랜트를 안전하게 보호하기 위하여 카메라, AtoN AIS를 이용한 IT융합 해양플랜트 원격 감시 시스템 설계에 관한 내용을 다룬다. 해양플랜트의 주변 환경에서 발생할 수 있는 각종 상황들을 영상 및 각종 데이터를 이용하여 원격으로 감시함으로써 보다 신속하게 적절한 대처가 가능해지며 안전한 해양플랜트의 운영에 도움을 준다.

  • PDF

Design of an integrated network management system for telecom subsystem in offshore plants

  • Kang, Nam-seon;Kim, Nam-hun;Lee, Seon-ho;Kim, Young-goon;Yoon, Hyeon-kyu
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제39권8호
    • /
    • pp.863-869
    • /
    • 2015
  • This study analyzed the offshore plant industry and related regulations such as ISO, IEC, and Norsok Standards to develop an integrated network management system (INMS) capable of both on-site and remote management and configuration of IP-based network equipment in offshore plants. The INMS was designed based on actual specifications and POS plans, and a plan of management was verified through an offshore plant engineering company. Various modules such as PAGA interface modules, CCTV, IP-PBX, and HF-radio communication modules were developed for system implementation. Protocol and data design and screen design were followed by framework development and introduction of the automatic satellite communication function.