• 제목/요약/키워드: Offshore Installation

검색결과 227건 처리시간 0.453초

정수 선형 최적화를 이용한 조선해양 의장품 제작 물량 할당에 관한 연구 (Optimization of Quantity Allocation using Integer Linear Programming in Shipbuilding Industry)

  • 박중구;김민규
    • 대한조선학회논문집
    • /
    • 제57권1호
    • /
    • pp.45-51
    • /
    • 2020
  • In this study, we developed an allocation optimization system for supply chain management in the shipbuilding and offshore construction industry. Supply chain operation is a way of operating manufacturing company responsible for the procurement of outfitting parts. The method about how to allocate the manufacturing volume to each partner company includes important decisions. According to the allocation method, the stability of the material supplied to the final installation process is guaranteed. We improved the allocation method that was previously decided by the person in charge. Based on the optimization engine, a system is developed that can automatically allocate the production volume. For optimization model configuration, factors affecting the volume allocation were analyzed and modeled as constraint factors. A target function is defined to minimize the difference in the load variance of each partner company. In order to use the same type of volume allocation engine for various outfitting products, the amount of work done by the partner company was standardized. We developed an engine that can allocate the same production load of each production partner. Using this engine, the operating system was developed and applied to the actual offshore project. It has been confirmed that the work load variance of suppliers can be maintained uniformly using the optimization engine rather than manual method. By this system, we stabilize the manufacturing process of partner suppliers.

풍력타워용 부스닥트 포설시스템 개발 (On Installation of Bus Trunk System for Wind Tower)

  • 이준근;김봉석;박성희;안형준;이희남
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2012년도 춘계학술대회 논문집
    • /
    • pp.330-335
    • /
    • 2012
  • A Bus Trunk System for Wind Tower is introduced. A marine cable has been widely used in wind tower or other offshore structure. However, as the electric load capacity is getting increased, the large number of cable lines should be used to cover such a huge amount of electric capacities, which makes the installation make quite difficult due to the heavy weight and volume of the present cables. On the other hand, by using a single bus trunk system line, the power capacity amount of 16 number of cable can be delivered with significant compactness. However, unlike flexible cable, the bus trunk is relatively stiff which could arise resonance phenomenon in the operating condition of wind tower, therefore, the vibration characteristics of bus trunk should be investigated and verify its long-term reliability during the life time of the wind tower.

  • PDF

오일-가스 해양플랜트 설계 및 설치를 위한 해양탐사 (Marine Survey for Designing and Installing Offshore Oil-Gas Plant)

  • 김원식;우남섭;박종명;김현도;강동효;박인석;김영준;주용환;이호영
    • 지구물리와물리탐사
    • /
    • 제17권1호
    • /
    • pp.34-44
    • /
    • 2014
  • 해양 오일-가스 개발을 위한 플랜트 산업은 많은 장비들을 설계 및 배치하고 운영해야 하는 산업이며, 최근 동향을 보면 생산설비가 해저면(Subsea)쪽으로 증대되고 있다. 해양이라는 특성상 한번 설치되면 변경하기가 용이하지가 않으므로 기본 설계단계에서부터 적절한 시추정 개수, 위치 및 심도, 생산관 직경, 생산 시 관막힘 또는 손상 등의 생산 및 운영과 직접 관련된 정보뿐 아니라 해저에 설치되는 장비들의 안정성과 효과적인 생산운영을 위한 배치에 대한 고려가 필요하다. 이러한 정보들을 근본적으로 제공하기 위한 기법으로 해양탐사를 본 해설에서 다루고자 한다. 먼저 해양 오일-가스 개발을 위한 플랜트장비들을 요약하고, 오일-가스 해양플랜트 설계 및 설치 단계에서 해양탐사가 담당하는 역할을 요약하였다. 그리고 해외사례를 통하여 독자의 이해도를 높이고자 하였다. 해양 오일-가스 플랜트에 적용될 수 있는 해양탐사기법에 대한 이해와 향후 이 분야에 필요한 국내 해양탐사기술 개발에 도움이 되고자 한다.

Dynamic Analysis of Topside Module in Lifting Installation Phase

  • Lee, Jong-Hyun
    • 한국해양공학회지
    • /
    • 제25권4호
    • /
    • pp.7-11
    • /
    • 2011
  • The installation phase for a topside module suggested can be divided into 9 stages, which include start, pre-lifting, lifting, lifted, rotating, positioning, lowering, mating, and end of installation. The transfer of the topside module from a transport barge to a crane vessel takes place in the first three stages, from start to lifting, while the transfer of the module onto a floating spar hull occurs in the last three stages, from lowering to the end. The coupled multi-body motions are calculated in both calm water and in irregular waves with significant wave height (1.52m), with suggested force equilibrium diagrams. The effects of the hydrodynamic interactions between the crane vessel and barge during the lifting stage have been considered. The internal forces caused by the load transfer and ballasting are derived for the lifting phases. The results of these internal forces for the calm water condition are compared with those in the irregular sea condition. Although the effect of pitch motion on the relative vertical motion between the deck of the floating structure and the topside module is significant in the lifting phases, the internal force induced pitch motion is too small to show its influence. However, the effect of the internal force on the wave-induced heave responses in the lifting phases is noticeable in the irregular sea condition because the transfer mass-induced draught changes in the floating structure are observed to have higher amplitudes than the external force induced responses.

배관설치도 내 생산정보 증강을 위한 겹침 회피 알고리즘의 적용 (An Application of Overlap Avoidance to Augment the Production Data in Pipe Installation Drawings)

  • 황인혁;유원선;박인하;박정서
    • 대한조선학회논문집
    • /
    • 제53권5호
    • /
    • pp.428-434
    • /
    • 2016
  • A lot of drawings for pipe construction and installation are needed to construct plant process system on the offshore plant structures. Depending on their scale or complexity, the required number of drawings related pipes sometimes amounts to several hundreds of thousands. Most major shipyards, therefore, have their own system which can automatically depict pipes’ geometric, manufacturing, and BOM(Bill of Material) information on the drawings. However, as the complexity and absolute quantity in the isometric region on the drawings is increased, the information extraction from the customized DB and positioning at the typical locations does not get to be enough to avoid the overlap between geometric contours, labels, and symbols. For this reason, the novel methods to arrange additional annotations without overlaps are presented in the paper. This approach is expected to increase the readability and legibility of the drawing and prevent the human error, and finally decrease the time-consuming and tedious jobs which are unnecessarily required to designers.

Surrogate Model Based Approximate Optimization of Passive Type Deck Support Frame for Offshore Plant Float-over Installation

  • Lee, Dong Jun;Song, Chang Yong;Lee, Kangsu
    • 한국해양공학회지
    • /
    • 제35권2호
    • /
    • pp.131-140
    • /
    • 2021
  • The paper deals with comparative study of various surrogate models based approximate optimization in the structural design of the passive type deck support frame under design load conditions. The passive type deck support frame was devised to facilitate both transportation and installation of 20,000 ton class topside. Structural analysis was performed using the finite element method to evaluate the strength performance of the passive type deck support frame in its initial design stage. In the structural analysis, the strength performances were evaluated for various design load conditions. The optimum design problem based on surrogate model was formulated such that thickness sizing variables of main structure members were determined by minimizing the weight of the passive type deck support frame subject to the strength performance constraints. The surrogate models used in the approximate optimization were response surface method, Kriging model, and Chebyshev orthogonal polynomials. In the context of numerical performances, the solution results from approximate optimization were compared to actual non-approximate optimization. The response surface method among the surrogate models used in the approximate optimization showed the most appropriate optimum design results for the structure design of the passive type deck support frame.

한국 근해 대형 선망 어선의 횡동요 감쇠 특성 (Roll reduction characteristics of the offshore large purseiner in Korea)

  • 강일권;김형석;조효제;김정창;함상준
    • 수산해양기술연구
    • /
    • 제47권3호
    • /
    • pp.248-256
    • /
    • 2011
  • The inherent efficiency of a ship would be prior to any other quality factors in ship's safety, because lack of it may give rise to a serious sea casuality even if it were a light mistake in operation. And the representative casualty comes from a deficiency of stability and an operating error combined would be capsizing. The Korean offshore large purseiner looks to have a structural weak point with small range of stability in spite of her big initial metacentric height, and have various type of roll reduction devices in order to cover up the defect. The aim of this study is to grasp for the roll reduction characteristics of the purseiner with bilge keel only and a stern keel additionally attached. The results are summarized as follows; The rolling angle of the model ship was increased in accordance with increase of the wave period and height, especially at close to the natural wave period of her, and the trends were more distinguished in the situation of bilge keel only installation than in the stern keel additionally installed. And stern keel has not noticeable effect on the reduction of the roll in the light ship condition, but has a little effect in full load condition.

해상풍력발전기 설치 선박 레그의 해저면 관입 깊이에 따른 고유 진동 모드와 구조 강도 평가 (Evaluation of the Natural Vibration Modes and Structural Strength of WTIV Legs based on Seabed Penetration Depth)

  • 이명수;서광철;박주신
    • 해양환경안전학회지
    • /
    • 제30권1호
    • /
    • pp.127-134
    • /
    • 2024
  • 해상풍력발전 시장의 성장과 함께 해상풍력발전기 설치 선 시장에 대한 기대감이 커지고 있다. 해상풍력발전 시장 내 2030년까지 약 100척의 설치 선이 필요할 것으로 전망되고 있다. 척당 가격이 3,000~4,000억 원이라서 일반 운반선보다 고부가가치 시장이다. 특히, 풍력발전기 용량이 11MW 이상의 대형 설치 선의 수요가 커지고 있다. 중국을 중심으로 아시아 해상풍력발전기 시장의 급성장으로 이 지역에서 운용 가능한 설치 선에 대한 발주에 대한 협의가 많다. 아시아권역 대부분의 해저 지질은 지지 반력이 작은 점토층으로 구성되어 있다. 이러한 특성에 의해서 설치 선이 작업을 위해 수면 밖으로 오르고 내림 시 스퍼드캔(Spudcan)과 레그(Leg)의 관입 깊이가 크게 발생한다. 연구에서는 최소 3m에서 최대 21m까지 관입 변수를 이용하여 관입 깊이에 따른 고유 진동 주기, 레그의 구조 안전성 평가 그리고 전복 안전성 지수를 평가하였다. 관입 깊이가 증가하면 고유 진동 주기가 짧아지고, 레그의 모멘트 길이가 짧아져서 구조 강도의 여유 치가 증가한다. 모든 입사각에서 전복 모멘트에 대해 안전하며, 최댓값은 270도에서 발생한다. 본 연구를 통하여 검토된 조건들은 연약 지반에서 설치 선의 운용 절차서를 작성 시 관입 깊이에 따라서 레그를 어떻게 운용해야 하는지 판단할 수 있는 중요한 자료로 활용할 수 있다. 결론적으로 관입 깊이에 따른 레그 구조 안전성을 정확히 파악하는 것은 설치 선의 안전과 직결된 문제이다.

해상태양광 구조물용 부유식 방파제의 파랑저감성능 평가 (Parametric Study on Effect of Floating Breakwater for Offshore Photovoltaic System in Waves)

  • 김현성;김병완;이강수
    • 한국전산구조공학회논문집
    • /
    • 제35권2호
    • /
    • pp.109-117
    • /
    • 2022
  • 기존 화석 연료의 고갈 및 환경오염의 문제와 대용량 발전을 위하여 해양환경 및 자원을 이용한 친환경에너지 발전에 대한 연구 및 개발이 증가하고 있으며, 이 중 높은 발전 효율을 가진 해상태양광 발전에 대한 연구가 크게 증가하고 있다. 환경하중이 비교적 약한 내수조건과 달리, 환경하중이 강한 해양에서의 태양광 발전을 위해서는 더 강한 강성의 구조재를 사용해야 한다. 하지만, 구조재의 생산 가능성, 무게를 포함한 구조물 특성 및 경제적 효율성 등의 제약조건이 발생할 수 있다. 따라서, 본 연구에서는 부유식 방파제를 설치함으로써 태양광구조물에 작용하는 파랑하중을 감소시켜 구조재의 강성 강화를 최소화하고자 하였다. 부유식 방파제의 크기 및 구조물로부터의 거리를 변화하여 이에 따른 파랑하중 및 구조재 응력의 감소 정도를 확인하였다. 다수 부력체의 상호간섭을 고려한 파랑하중의 경우, 고차경계요소법(Higher-Order Boundary Element Emthod)을 이용해 산정하였으며, 구조재에 작용하는 응력은 유한요소법(Finite Element Method)을 통해 평가하였다. 각 조건에서의 최대응력을 분석 및 비교함으로써 해상태양광 발전 시스템에 대한 부유식 방파제의 영향을 확인하였으며, 부유식 방파제의 크기가 파랑하중 및 구조재 응력 감소에 큰 영향을 미침을 확인하였다.

대규모 해상풍력발전단지의 안전관리를 위한 법적 사각지대 분석 및 개선 제안 (Analysis of the Legal Blind Sectors of the Large-Scale Offshore Wind Farms of Korea and Proposal to Improve Safety Management)

  • 김인철;남동
    • 해양환경안전학회지
    • /
    • 제29권2호
    • /
    • pp.127-138
    • /
    • 2023
  • 국제사회는 글로벌 기후위기 극복을 위해 2050년까지 탄소중립(Net Zero)을 목표로 다양한 탈탄소 에너지원 개발을 지속하고 있다. 우리 정부에서도 '재생에너지 3020' 정책을 수립하고 태양광이나 풍력을 이용한 에너지 개발계획을 추진함에 따라 해상 풍력발전단지와 같이 연안해역에서 기존에는 볼 수 없었던 대규모 해양개발사업이 추진되고 있다. 해양시설물은 선박의 입장에서 볼 때는 항행 장애물의 일종이며, 해양시설물 설치에 따라 좁아진 수역에서 선박 간 충돌사고 발생 또는 선박과 해양시설물의 접촉사고 발생시 환경오염 및 인명피해 등의 발생이 우려된다. 이에 국내외의 해상풍력발전단지 개발계획을 살펴보고 풍력단지에서 선박의 안전한 통항을 보장하기 위한 제도적 장치가 완비되어 있는지 분석하였으며, 해외의 입법 사례와 국내 법규를 비교하여 법적 사각지대를 해소하기 위한 새로운 법령안을 제안함으로써 대한민국의 관할해역에서 해양시설물의 안전한 운영과 선박의 안전한 통항을 기대하였다.