• 제목/요약/키워드: Office building construction

검색결과 308건 처리시간 0.028초

기존 건축물 에너지 성능 개선 제도의 방향성 제안 (A Direction of Energy Rating System for Existing buildings)

  • 홍심희;이슬기;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.149-150
    • /
    • 2013
  • Energy systems in increasing energy efficiency are actively performed at home and abroad. But Generally systems in the country are limited in a new building or sort of some buildings like a public and office building. So, this research suggest a new direction of energy system for existing buildings. It need to set a new bound for containing the green remodeling. For a direction, we analysis domestic energy system in perform and compared their bounds, standard and methods of energy evaluation. This study is necessary for an additional research for proposing detailed evaluation items and for a feasibility study research. And it contribute to develope internal energy systems and set a new system bound.

  • PDF

Constructability and Economic Evaluation of Continuous Hoop Reinforcement Method

  • Kang, Su-Min;Park, Sung-Woo;Jang, Se-Woong;Jin, Jong-Min;Eom, Tae-Sung;Park, Hong-Gun
    • 한국건축시공학회지
    • /
    • 제13권3호
    • /
    • pp.291-305
    • /
    • 2013
  • This paper presents the continuous hoop reinforcement method as a means to overcome the difficulty of rebar construction due to the seismic detail of lateral reinforcement. Because the continuous hoop has no seismic hook, and there is less interference during the rebar work, rebar quantities and construction time can be reduced. Since the details of column and beam continuous hoops are different from those of conventional lateral reinforcements, the construction method should be developed through mock-up tests. The length of the beam mock-up is 8m and the section size is $500mm{\times}700mm$, the height of the column mock-up is 2.8m and 4m, and the section size is $800{\times}800mm$. The length and the size are determined based on the elements that are generally used in reinforced concrete basement parking lots and office buildings. The results of the mock-up test showed that the quantities of rebar could be reduced by 20% and the time could be reduced by up to 40% compared with conventional lateral reinforcements.

국내 고층 주상복합 건물의 구조적 특성에 관한 조사 연구 (An Investigative Study on the Structural Characteristics of High-Rise Complexes in Korea)

  • 강석원;이성호
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.137-144
    • /
    • 2003
  • Recently, the interest in a complex building increases rapidly in Korea. High-rise complex is not simply the combination of a residential apartment and a business office as previous but a building with the object of the convenience of the residents familiar with city-life style through adapting the high class life style and new residential culture to the business space, and the efficiency in using the limited building site in the town. This study presents an exploratory analysis focusing the structural system with the help of the extensive survey of the construction site in Korea, and aims a guideline for the structural design and construction of high rise complex. Through the survey, change and development in the design and the construction can be seen as the height and size of the complex grow. It is almost indispensable to design a structural system against lateral forces like earthquake or wind, which is usually measured by story drift ratio or story displacement. Improvement of the structural materials and their usages is also included for the efficiency of the structural system. Useful slab-beam system contributing to the decrease of the story height is still a concern.

Adjudication in Australia: A Study of Adjudication Activity in New South Wales for 2013/14

  • Brand, Michael C.;Kim, Jinu
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.396-400
    • /
    • 2015
  • The Building and Construction Industry Security of Payment Act 1999 (NSW) (the NSW Act) is a unique form of statutory regulation for the building and construction industry, which gives virtually all industry participants a statutory right to, and a means of recovering, payments for work done under a construction contract. The research aim is to examine current trends in adjudication applications and determinations under the NSW Act. The data used for this study was the collected by the NSW Office of Finance & Services as part of a regular reporting regime for the period from 1 July 2013 and ending on 30 June 2014. With just over 817 adjudication applications having been made over the 2013/14 period, the data indicates that adjudication is being frequently utilized by stakeholders in the NSW building and construction industry as a means of progress payment recovery. Adjudication is proving to be a popular choice for those making claims of less than AU$250,000. Claimants were awarded about 36% of the total of claimed amounts and claimants are generally successful at adjudication in terms of the proportion of the claimed amounts determined in their favour. This is particularly so in relation to claims of less than $100,000, which represents about 70% of the total applications made over the reporting period. The data indicates that adjudication fees are generally modest enough to conclude that adjudication provides claimants across all claim ranges with a relatively inexpensive means of having disputed progress payments determined by an independent adjudicator.

  • PDF

이미지 기반 건설현장 수치 측정 모델 기초연구 (Preliminary Study for Image-Based Measurement Model in a Construction Site)

  • 윤세빈;강민균;김창원;임현수;유위성;김태훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.287-288
    • /
    • 2023
  • The inspection work at construction sites is one of the important supervisory tasks, which involves verifying that the building is being constructed by the numerical values specified in the design drawings. The conventional measuring method for inspection involves using tools or equipment such as rulers directly by the personnel at the site, and it is usually confirmed by vision. Therefore, this study proposes an model to measure numerical values on images of the construction site. Through the case study to measure the installation interval of jack supports, the proposed algorithm was verified the effiect and validity. The results of this study suggest that it can support inspection work even in the office, which may have been overlooked by on-site inspectors, and contribute to the digitization of inspection work at construction sites.

  • PDF

프로그램제어방식을 이용한 건물 전력수요 관리기법 (A Study on the Power Demand using Program Control Method in Office Building)

  • 최도혁;김세동;류승기;송언빈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1994년도 하계학술대회 논문집 A
    • /
    • pp.106-109
    • /
    • 1994
  • The object of this study is to propose the simplified power demand control system which is appliable to existing buildings or new buildings. Through the technical survey and power demand analysis in office buildings, the electric facilities which can be controlled are selected. Power demand control program can be controlled the electric facilities in order, and displayed the facility operation state. The proposed power demand control system is cost-effective and flexibly adoptable in system upgrade or retrofit.

  • PDF

LCCA 및 LCA 분석을 이용한 오피스 빌딩에 지능형 대기전력 제어시스템 도입의 타당성 분석에 관한 연구 (A Study of LCCA and LCA to Evaluate Feasibility for Introducing Smart Quiescent Power Control System into Office Building)

  • 전준용;이석중;최혜미;김경환;김주형
    • 한국건축시공학회지
    • /
    • 제16권2호
    • /
    • pp.141-149
    • /
    • 2016
  • 기존의 대기전력차단시스템의 단점을 극복하고자 최근 지능형 대기전력 제어시스템이 개발되기에 이르렀다. 하지만 기존의 시스템 보다 투자금액이 높은 문제로 도입에 대한 타당성 검토가 필요하다. 이에 본 연구에서는 LCCA 및 LCA를 이용하여 경제적 측면 및 환경적 측면을 종합적으로 분석하여 도입의 타당성을 검토하였다. 또한 결과의 신뢰성을 확보하기 위하여 민감도 분석을 실시하였다.

산업연관분석법을 이용한 학교 건물에서의 환경영향평가 - 경기지역의 초등학교를 대상으로 - (Environmental Impact Assessment at a School Building using Input-output Table - Focused on Elementary School in Gyeonggi-do -)

  • 최두성;전흥찬;조균형
    • KIEAE Journal
    • /
    • 제16권3호
    • /
    • pp.57-62
    • /
    • 2016
  • Purpose: A lot of active researches have addressed the impact of a building on global environment, but most of the researches focus on a residential building and a large office building. Hereupon, this study assessed the impact on environment quantitatively through the analysis of input materials targeting a school building. Method:This study calculated embodied energy of input materials suggested in a construction statement on a school building using the input-output analysis. This study finally carried out environmental impact assessment by applying LCIA DB shown in the preceding researches to the calculated embodied energy. Result: The analysis result revealed that the environmental impact per unit area(/$m^2$) at a school building was $4.11E-02PE{\cdot}yr$, among which Construction was found to be $3.59E-02PE{\cdot}yr$, being analyzed to account for about 87% of the total environmental impact. Also, as a result of detailed environmental impact, the impact on global warming among the total environmental impact was analyzed to be high, accounting for about 76%.

Structural Design and Construction for Tall Damped Building with Irregularly-Shaped Plan and Elevation

  • Yamashita, Yasuhiko;Kushima, Soichiro;Okuno, Yuuichirou;Morishita, Taisei
    • 국제초고층학회논문집
    • /
    • 제7권3호
    • /
    • pp.255-264
    • /
    • 2018
  • This paper introduces three distinctive means for the use of a 189-meter high damped structure ensuring safety against earthquake: 1. Realization of L-shaped elevational structural planning: The bottom and top of the tower have belt trusses and hat trusses respectively to restrain the bending deformation. Furthermore, large-capacity oil dampers (damping force 6,000 kN) are installed in the middle part of the tower to restrain the higher-mode deformation. 2. Realization of L-shaped planar structural planning: We devised a means of matching the centers of gravity and rigidity by adjusting planar rigidity. Moreover, viscous damping devices are located at the edges of the L-shaped plan, where torsional deformation tends to be amplified. We call this the "Damping Tail" system. 3. Composite foundation to equalize deformations under different loading conditions: We studied the vertical and horizontal deformations using sway-rocking and 3D FEM models including the ground, and applied multi-stage diameter-enlarged piles to the tower and a mat foundation to the podium to keep the foundations from torsional deformations and ensure structural safety.

A study on the comparison of a steel building with braced frames and with RC walls

  • Buyuktaskin, Almila H. Arda
    • Earthquakes and Structures
    • /
    • 제12권3호
    • /
    • pp.263-270
    • /
    • 2017
  • In this study, two geometrically identical multi-storey steel buildings with different lateral load resisting systems are structurally analyzed under same earthquake conditions and they are compared with respect to their construction costs of their structural systems. One of the systems is a steel structure with eccentrically steel braced frames. The other one is a RC wall-steel frame system, that is a steel framed structure in combination with a reinforced concrete core and shear walls of minimum thickness that the national code allows. As earthquake resisting systems, steel braced frames and reinforced concrete shear walls, for both cases are located on identical places in either building. Floors of both buildings will be of reinforced concrete slabs of same thickness resting on composite beams. The façades are assumed to be covered identically with light-weight aluminum cladding with insulation. Purpose of use for both buildings is an office building of eight stories. When two systems are structurally analyzed by FEM (finite element method) and dimensionally compared, the dual one comes up with almost 34% less cost of construction with respect to their structural systems. This in turn means that, by using a dual system in earthquake zones such as Turkey, for multi-storey steel buildings with RC floors, more economical solutions can be achieved. In addition, slender steel columns and beams will add to that and consequently more space in rooms is achieved.