Comparative Study of GPS-Integrated Concrete Supply Management using Discrete Event Simulation

  • Zekavat, Payam Rahnamayie;Mortaheb, Mohammad Mehdi;Han, Sangwon;Bernold, Leonhard
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.2
    • /
    • pp.31-40
    • /
    • 2014
  • The management of vehicular supply of "perishable" construction material, such as concrete mixes, faces a series of uncertainties such as weather, daily traffic patterns and accidents. Presented in this paper is a logistics control model for managing a hauling fleet with interrelated processes at both ends and queue capacities. Discrete event simulation is used to model the complex interactions of production units and the randomness of the real world. Two alternative strategies for ready mix concrete delivery, with and without an off-site waiting queue, are studied to compare supply performance. Secondly, the paper discusses the effect of an agent-based GPS tracking system providing real-time travel data that lessens the uncertainty of trucking time. The results show that the combination of GPS information with off-site queuing reduces productivity loss and process wastes of concrete placement as well as the idleness of supply trucks when crew or pump experience an unexpected stoppage.

Research of Joint Details to Reduce Leakage in PC Apartments (PC 아파트 누수 억제를 위한 접합부 상세 분석)

  • Kim, Tae-Ho;Koo, Jeong-Mo;Kim, Yong-Ro
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.131-132
    • /
    • 2020
  • Recently, interest in OSC(Off Site Construction) is increasing due to the trend of a decrease in skilled workers and an increase in labor costs. In this regard, PC(Precast Concrete) is being reviewed for apartments, the most common type of housing in Korea. As the biggest concern for PC apartment houses, civil complaints such as inter-floor noise and leakage were presented. In this study, the details of the joints were reviewed based on the past cases of PC apartments, and the details of the recently constructed or planned PC apartments were investigated. Through this, the leakage path in the past was analyzed through the existing research literature and data, and a discussion was conducted on the direction for a detailed proposal of an improved joint in the future.

  • PDF

OFF-SITE MANUFACTURE OF APARTMENT BUILDINGS

  • Neville Boyd
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.304-310
    • /
    • 2011
  • The populations of major cities in Australia are increasing rapidly and facing an acute housing shortage. Traditional apartment procurement techniques involve lengthy lead-times and factory-based, or offsite manufactured (OSM) multi-storey apartment buildings may offer the opportunity to help fulfill the need by significantly reducing build times. Other advantages of OSM may include superior quality, low weight ratios, economies of scale achieved through repetition of prefabricated units, use on infill sites, sustainable design standards and better occupational health and safety. There are also positive labour and training implications, which may help to alleviate an industry-wide shortage of skills through use of semi-skilled labour. Previous uncertainties about the adoption of offsite due to the high capital costs and perception issues were generally based on pre-cast concrete structures, which are quite a different building type in terms of flexibility, construction, delivery and finishes. Identification of drivers and constraints assists in the determination of current industry status, allows for a benchmark to be established and future opportunities and directions for OSM to be determined.

  • PDF

Preliminary Study on the utilization of BIM in modular building construction (모듈러 건축공사의 BIM 활용성 분석을 위한 기초연구)

  • Lee, Myung-Do;Lee, Chan-Woo;Lim, Hyun-Su;Kim, Tae-Hoon;Lee, Ung-Kyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.236-237
    • /
    • 2019
  • Building Information Modeling (BIM) and modular construction are regarded as important technologies that address several issues faced by the construction industry. However, the application guidelines for BIM in current modular construction projects are insufficient. This paper presents the preliminary work on the analysis of BIM utilization in a modular construction project; a five-point likert scale questionnaire was conducted to assess the necessity of BIM applications by the Necessity Index(NI) of nine categories(U1~U9) across two construction phases (onsite and offsite). The survey results indicate that applications for BIM based quantity takeoff for offsite phase(U4) as well as BIM modeling for module joint details(U8) were deemed to be the most necessary in each phase. The results of this study can be used as detailed guidelines for the integration of BIM in modular construction projects.

  • PDF

Analysis of a Long Volumetric Module Lift Using Single and Multiple Cranes

  • Khodabandelu, Ali;Park, JeeWoong;Choi, Jin Ouk;Sanei, Mahsa
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.563-570
    • /
    • 2022
  • Industrialized and modular construction is a growing construction technique that can transfer a large portion of the construction process to off-site fabrication yards. This method of construction often involves the fabrication, pre-assembly, and transportation of massive and long volumetric modules. The module weight keeps increasing as the modules become more complete (with infill) to minimize the work at the site and, as higher productivity can be achieved at the fabrication shop. Thus, a volumetric module delivery gets more challenging and risky. Despite its importance, past research paid relatively insufficient attention to the problem related to the lifting of heavy modules. This can be a complex and time-consuming problem with multiple lifting for transportation-and-installation operations both in fabrication yard and jobsite, and require complex crane operations (sometimes, more than one crane) due to crane load capacity and load balance/stability. This study investigates this problem by focusing on the structural perspective of lifting such long volumetric modules through simulation studies. Various scenarios of lifting a weighty module from the top using four lifting cables attached to crane hooks (either a single crane or double crane) are simulated in SAP software. The simulations account for various factors pertaining to structural indices, e.g., bending stress and deflection, to identify a proper method of module lifting from a structural point of view. The method can identify differences in structural indices allowing identification of structural efficiency and safety levels during lifting, which further allows the selection of the number of cranes and location of lifting points.

  • PDF

A study on the Causes Analysis and Preventive Measures by Disaster types in Construction Fields (건설현장에서의 재해유형별 원인 분석 및 예방대책에 관한 연구)

  • Jo, Jae-Hwan
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.1
    • /
    • pp.7-13
    • /
    • 2012
  • Recently, carelessness on safety management in construction sites has caused a sharper upward trend in accidents and disasters, compared to the past. Therefore, this study analyzes the causes of accidents that occurred on construction sites in the year of 2007, and proposes preventive measures. The construction industry had a heavy death rate with 279 out of 418 deaths from falls in all industrial sites, accounting for 66.7%. And the causation analysis found a particularly high incidence of temporary structure-related accidents, with falling off scaffolding as the most common cause of accidents. According to the causation analysis of fall-down accident cases, accidents induced by protrusion on construction sites are a big contributor resulting in the deaths of 312, accounting for 74.8%, which is deemed to be due to site disorderliness. And to remove floor protrusions and to secure workers' traffic line and safety, neat and thorough site arrangement is necessary. Against collision, efforts must be made to prevent equipment-pedestrian crashes on site, which necessarily requires emergency lamps, alarm bells, and safety poles and blocks to be installed, lighting systems to be improved, obstacles to be removed, site supervisors to be assigned to construction equipment works, and workers to be more intensely trained and supervised.

A study on the Causes Analysis and Preventive Measures by Disaster types in Construction Fields (건설현장에서의 사고유형별 원인 분석 및 재해예방대책에 관한 연구)

  • Jo, Jae-Hwan
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2011.11a
    • /
    • pp.23-34
    • /
    • 2011
  • Recently, carelessness on safety management in construction sites has caused a sharper upward trend in accidents and disasters, compared to the past. Therefore, this study analyzes the causes of accidents that occurred on construction sites in the year of 2010, and proposes preventive measures. The construction industry had a heavy death rate with 279 out of 418 deaths from falls in all industrial sites, accounting for 66.7%. And the causation analysis found a particularly high incidence of temporary structure-related accidents, with falling off scaffolding as the most common cause of accidents. According to the causation analysis of fall-down accident cases, accidents induced by protrusion on construction sites are a big contributor resulting in the deaths of 312, accounting for 74.8%, which is deemed to be due to site disorderliness. And to remove floor protrusions and to secure workers' traffic line and safety, neat and thorough site arrangement is necessary. Against collision, efforts must be made to prevent equipment-pedestrian crashes on site, which necessarily requires emergency lamps, alarm bells, and safety poles and blocks to be installed, lighting systems to be improved, obstacles to be removed, site supervisors to be assigned to construction equipment works, and workers to be more intensely trained and supervised.

  • PDF

Experimental Evaluation of the Effect of Steel-Seal and Hydro-Seal in Reinforced Concrete Structures (STEEL-SEAL 및 HYDRO-SEAL의 철근콘크리트 구조무에 미치는 영향에 대한 실험적 연구)

  • 전환석;이강균;배수호;정영수
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.10a
    • /
    • pp.287-292
    • /
    • 1997
  • Recent economic growths have accelerating much construction activities of various infrastructures, such as Express railway, Long-span bridges, Multi-story Buildings and etc. Reinforcement steel corrosion to be inevitably caused under the progress of these construction activities have been on and off serious problems in the site, which could incur another tragedic accident to us suffering from safety-ignorance disease. Thus, it is strongly requested to develop probable innovative products which could remove corrosive materials on rebars and also protect steel corrosion of reinforced concrete structures in the construction site. Hydro-Seal and Steel-Seal could solve these problems currently faced with in the construction site. The objective of this research is to experimentally evaluated the effect of Hydro-Seal and Steel-Seal in reinforced concrete structures, of which usage might affect the bond strength between steel and concrete, long-term compressive strength of concrete, corrosion resistance and etc. Related test results show that appropriate dosage of Hydro-Seal and Steel-Seal in reinforced concrete structures didnot affect physical properties of reinforced concrete structures.

  • PDF

A Study on the Comparison of the Construction Process between the PC Modular Construction Method Using 3D Infill and the Existing Construction Method (3D Infill을 활용한 PC 모듈러공법과 기존공법과의 시공프로세스 비교 연구)

  • Chung, Joon-Soo;Lim, Seok-Ho;Yang, Hyeon-Jeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.87-88
    • /
    • 2023
  • In accordance with changes in the domestic construction environment, interest in off-site construction methods (factory-manufactured construction methods) including modular construction methods is rapidly increasing. Among various off-site (OSC) construction methods, the front runner is the steel-based box-type modular construction method. Compared to the existing wet construction method, the steel modular construction method is increasing in terms of securing economic feasibility by shortening the construction period and increasing the prefabrication rate. However, due to the recent rise in raw materials and a sharp rise in the exchange rate, the economic feasibility of the wet method is deteriorating compared to the wet method. Therefore, a hybrid between 9-Matrix-based OSC construction methods is considered as a solution, away from the steel-box type combination, and a comparative study of the construction process between each construction method is being conducted. It was analyzed that the PC modular construction method shortened the construction period by 9% compared to the existing steel modular construction method. On the other hand, when comparing the construction period of the Gayang-dong demonstration complex calculated assuming that all modules are applied, it is estimated that there will be a 12% reduction in construction period compared to the steel modular method and a whopping 43% compared to the RC method.

  • PDF

A Basic Study on the Improvement of PC Project Management System Process (PC 공사 프로젝트 관리 시스템 프로세스 개선을 위한 기초연구)

  • Kim, Chang-Hun;Ahn, Yong-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.95-96
    • /
    • 2023
  • The purpose of this study is to derive the limitations of the existing management system by analyzing the characteristics of the PC process to improve the PC construction project management system process. To overcome the limitations derived, we present a process of managing integrated information from the design-production-construction stage using QR codes and clouds. This is expected to help develop a PC construction project management system.

  • PDF