• Title/Summary/Keyword: Off-shore construction

Search Result 29, Processing Time 0.021 seconds

Cooperative control system of the floating cranes for the dual lifting

  • Nam, Mihee;Kim, Jinbeom;Lee, Jaechang;Kim, Daekyung;Lee, Donghyuk;Lee, Jangmyung
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.10 no.1
    • /
    • pp.95-102
    • /
    • 2018
  • This paper proposes a dual lifting and its cooperative control system with two different kinds of floating cranes. The Mega-erection and Giga-erection in the ship building are used to handle heavier and wider blocks and modules as ships and off-shore platforms are enlarged. However, there is no equipment to handle such Tera-blocks. In order to overcome the limit on performance of existing floating cranes, the dual lifting is proposed in this research. In the dual lifting, two floating cranes are well-coordinated to add up the lift capabilities of both cranes without any loss such that virtually a single crane is lifting, maneuvering and unloading. Two main constraints for the dual lifting are as follows: First, two barges of floating cranes should be constrained as a rigid body not to cause a relative motion between two barges and main hooks of the two cranes should be controlled as main hooks of a single crane. In order words, it is necessary to develop the cooperative control of two floating cranes in order to sustain a center of gravity of the module and minimize the tilting angle during the lifting and unloading by the two floating cranes. Two floating cranes are handled as a master-slave system. The master crane is able to gather information about all working conditions and make a decision to control the individual hook speed, which communicates the slave crane by TCP/IP. The developed control system has been embedded in the real floating crane systems and the dual lifting has been demonstrated five times at SHI shipyard in 2015. The moving angles of the lifting module are analyzed and verified to be suitable for hoisting control. It is verified that the dual lifting can be applied for many heavier and wider blocks and modules to shorten the construction time of ships and off-shore platforms.

The Characteristic of Wind Turbine Industry of the West-South Seashore of Leading Industry Development for Honam Economic Region (호남광역경제권의 서남해안 풍력산업 특성)

  • Cha, In-Su;Kim, Tae-Hyung;Lee, Ki-Bong
    • Proceedings of the KIPE Conference
    • /
    • 2010.07a
    • /
    • pp.101-102
    • /
    • 2010
  • This paper represents about the characteristics of wind turbine industry of the west-south seashore of Leading Industry Development for Honam Economic Region. These projects have 8 R&D and 3 non R&D project. The period of these projects is from October 2009 to April 2012. The R&D projects are composed three bright prospect products (1) the base construction of MW off-shore wind turbine components and system with Outer-rotor type PMSG, (2) the Development of 3MW wind power system with accommodation of the west-south seashore, and (3) the development of hybrid wind turbine system with wind base construction. Also, the non-R&D projects are composed three parts with above three bright prospect products. Above two projects support the companies with characteristic of low speed wind turbine system. Other project supports the companies related to wind turbine with small and medium capacity of form 3 kW to 10kW.

  • PDF

Effects of Sand Supply and Artificial Floods on Periphyton in the Downstream of a Dam (Yangyang Dam, Korea) (모래 공급과 인공 홍수가 양양댐 하류하천의 부착조류에 미치는 영향)

  • Park, Misook;Lee, Jaeyong;Jung, Sungmin;Park, Chang-Keun;Chang, Kun;Kim, Bomchul
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.3
    • /
    • pp.418-425
    • /
    • 2012
  • Dam construction in a river can change its hydrological pattern and trap sediments, which results in ecological changes in the downstream. It is a common phenomenon in the downstream of dams to have decreased sediment flow and increased periphyton. Artificial floods and sediment application are suggested as mitigation practices in order to simulate natural process of flood; transporting sediment and sloughing periphyton off. In this study the effects of artificial floods on periphyton were examined by applying sand artificially and discharging water from a dam (Yangyang Dam, Korea). The study area has been suffering from turbidity problems caused by shore erosion of the dam. The accumulation of inorganic sediments and increase of periphyton on the river bottom are the major factors of habitat deterioration in the downstream reaches. Artificial flood and artificial addition of sand was performed in summer and the effects were measured. Piles of applied sands were washed off easily by discharge and it enhanced the periphyton sloughing effect. The removal efficiency of periphyton was 50 ~ 80% within the 2 km reach from the dam. In conclusion artificial floods and sand application can be a good mitigation measure for the habitat rehabilitation after a dam construction in streams.

The Revitalization of Deep-sea Fishery Through the Construction of Fish-Pier (원양어업 전용부두 개설 앞두고;-원양업 거듭나기 구상 -)

  • 유충열
    • The Journal of Fisheries Business Administration
    • /
    • v.24 no.2
    • /
    • pp.17-53
    • /
    • 1993
  • Pusan is the largest fishing port in Korea, and deals with more than I million ton of fish catches annually, including catches of coastal and off-shore fisheries as well as those of deep-sea fishery. However, it hen had no fishing port facilities specialized fer deep-sea fishery since it started 30 years ago. Economic and physical losses resulting from this have teen enormous. Although fishing port facilities are a part of infra-structures built by Governments, the construction of them has been delayed due to financial difficulties of Central or local governments. To overcome this harsh situation to which deep-sea fishery cooperations faced, some cooperations have decided to construct fishing port facilities including fish-pier specialized for deep-sea fishery in Gamcheon port. The construction expenses of these facilities were financed by private funds to which they themselves jointly contributed. As a result, a fish-[pier, which has the capacity of serving one fishing vessel of 10, 000 ton or four of 5, 000 ton or four of 1, 000 ton at the same time, will be opened in here by 1994. The paper examines the master plan to revitalize the deep-sea fisheries industry in a deep depression with the opening of these physical facilities. The framwork of the plan is pursued in two different aspects, which are both hardware and software. In a hardware aspect, the plan in to develop Pusan into a city which is suitable for one of the best fishing ports in the world. That is, it is to develop the city into a place famous for sightseeing as well as the distribution and processing of fish-products centering around fish-piers. On the other hand, in a software aspet, it is regarding improvement of the distribution system of fish-products. One way to do that is to make up some deficiencies of the current system of a producers' joint sale. And the other is to establish an exchange of fish-products futures. Through these institutions, we could abrsorb speculative funds, which would otherwise be invested in speculation on fish-products, into productive investment opportunities, We believe that if the plan is realized, the deep-sea fishery in Korea will revive from a long-tasted depression and make progress to become one of the mai industries of Korea.

  • PDF

Analysis of In-Situ Stress Regime from Hydraulic Fracturing Field Measurements in Korea (수압파쇄 현장시험을 통한 국내 지반의 초기응력 분포양상 해석)

  • Choi, Sung-Oong
    • Journal of Industrial Technology
    • /
    • v.28 no.B
    • /
    • pp.111-116
    • /
    • 2008
  • Since the hydraulic fracturing field testing method was introduced first to Korean geotechnical engineers in 1994, there have been lots of progresses in a hardware system as well as an interpretation tool. The hydrofracturing system of first generation was the pipe-line type, and it has been developed to a wire-line system at their second generation. The current up-to-date system is more compact and is able to be operated by all-in-one system. With a progress in a hardware system, the software for analyzing in-situ stress regime has also been progressed. The shut-in pressure, which is the most ambiguous parameter to be obtained from hydrofracturing pressure curves, can now be acquired automatically from the various methods. While the hardware and software for hydrofracturing tests are being developed during the last decade, the author could accumulate the field test results which can cover the almost whole area of South Korea. Currently these field data are used widely in a feasibility study or a preliminary design step for tunnel construction in Korea. Regarding the difficulties in a site selection and a test performance for the in-situ stress measurement at an off-shore area, the in-situ stress regime obtained from the field experiences in the land area can be used indirectly for the design of a sub-sea tunnel. From the hydrofracturing stress measurements, the trend of magnitude and direction of in-situ stress field was shown identically with the geological information in Korea.

  • PDF

The AS4059 Hydraulic System Cleanliness Classification System: Replacement of NAS1638

  • Day, Mik;Hong, Jeong-Hee
    • Journal of Drive and Control
    • /
    • v.9 no.2
    • /
    • pp.39-45
    • /
    • 2012
  • The NAS 1638 cleanliness classification system was originally developed in 1966 by the US Aircraft Industries of America to both simplify reporting of particle count data and to control the introduction of dirt during the assembly of aircraft fluid systems. The numbers of particles at stated sizes are represented by broad bands where the interval was generally a doubling of contamination. A number of systems have been introduced since this to suit differing requirements. NAS 1638 and AS4059 are used in other industrial sectors such as the Off-shore & Sub-Sea and the Primary Metal Industries. The changes to ISO contamination measurement standards controlled by ISO/TC131/SC6 in 1999 meant that a revision of most of these classification systems was necessary. The body responsible for NAS 1638 decided to withdraw it for new installations and replace it with an update of an existing standard, SAE AS 4059. This paper details the philosophy behind the contamination coding systems, the reasons for the changes to the ISO contamination standards and explains the workings of AS 4059, the replacement for NAS 1638. It goes on to detail the latest changes to this standard.

Potential of Helicopter MRO Business (헬기 MRO 비즈니스의 잠재력)

  • Kim, Joune ho;Hwang, Chang jeon
    • Journal of Aerospace System Engineering
    • /
    • v.8 no.3
    • /
    • pp.34-40
    • /
    • 2014
  • Since the global economic crisis in year 2008, the world civil helicopter market has been growing recently. According to the market outlook in the next decade, the demand of civil helicopter will be driven by the demand of Private & Corporate, Oil & Gas, Off-shore and EMS(Emergency Medical Service) usages. On the other side, the demand of military market will be driven by the modification and upgrading for life extension or performance enhancement than the new helicopter development for replacing old models. To summarize these situations, the demand of MRO(Maintenance, Repair & Overhaul) market has also been on the rise because of the demand due to above several usages in civil side and the life-extension in military side. Through the MRO market analysis for characteristics, developmental trends and a supply chain, this paper describes that the potential of MRO business is considerably large as a propulsive power of domestic helicopter industry. And also, it proposes the construction direction of MRO network because the domestic industry must make the developmental awareness and reliability a stepping-stone towards own helicopter.

An Experimental Study on the Prediction of Yield Load Using Ring Analysis Method in Circular Tubular X-Type Cross Sections (링해석법에 의한 X형 강관 격점부의 항복하중 예측에 관한 실험적 연구)

  • Park, Il Min;Na, Seon Hong
    • Journal of Korean Society of Steel Construction
    • /
    • v.11 no.1 s.38
    • /
    • pp.43-54
    • /
    • 1999
  • The divergence connection between steel circular tubes is widely used in such structures as factory facilities, steel circular hollow section truss, and off-shore tower. Steel circular hollow section (SCHS) have close section, and it makes their per-unit production expense higher than open sectioned products like L-shape, H-shape steels, but the sectional resistance of SCHS against vertical compression and torsion is very high. Despite the structural merits of SCHS, however, many engineers dislike to use them in their design because of uncertainty regarding the stress distribution and deformation behavior at their connections. Therefore, this thesis dealt with X-type connections, the most common forms of connection, and studied their load-deformation relationship. It observed how to show the load-deformation relationship at steel circular tube connections according to the diameter-thickness ratio (D/T) of the chord and diameter of branch-diameter of chord ratio (d/D) and suggested prediction yield load using by ring analysis method.

  • PDF

A Study of Lamella Tearing being Produced by Corner Joint Welding in Box Column of Ultra Thick Plate (극후판 Box Column의 Corner Joint 용접시 발생하는 Lamella Tearing에 관한 연구)

  • Han-Sur Bang;Seong-Joo Kim;Jong-Myung Kim;Woong-Sung Jang;Young-Seob Kwon
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.36 no.4
    • /
    • pp.95-104
    • /
    • 1999
  • Use of the ultra thick plate is being continuously increased in large off-shore structures, ships, bridges and skyscraper construction, due to increasingly large-sized steel structures and it seems that this trend will be maintained. But, occurrence of the lamella tearing has been reported in ultra thick plate used for construction. It is reportedly caused by impurities such S(sulfur), P(phosphorus) and others accumulated in the ultra thick plate's centerline in the thickness direction with strip shape or by restraint residual stress caused by the welding. In the ultra thick plate made by continuous casting method, occurrence of lamination is difficult to avoid because of the properties of production procedure. Therefore, with a view to reducing the lamella properties, this report tries tearing in the steel structure in the view of welding strength rather than metallic properties, this report tries to seek the optimum groove and welding procedure by using the computer simulation based on FEM(Finite Element Method).

  • PDF

A Study on the Damages of Head Works by the Storm Flood in the Area of Cheong Ju and Boeun -Emphasis onFactors Influenced on the Disasters and their Countermeasures- (淸州 및 報恩地方의 頭首工洪水災害에 關한 調査硏究(II) -災害原因 및 對策方案을 中心으로-)

  • Nam, Seong-Woo;Kim, Choul-Kee
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.24 no.2
    • /
    • pp.49-55
    • /
    • 1982
  • The purpose of this study is to classify the factors influenced on the damages of head works suffered from the storm flood occurred on July 22 1980 in both Musim and Bochong rivers and to find out an integral counter measures against the causes influenced on the disaster of head works in the engineering aspect of planning, design, construction and maintenance. In this survey, number of samples was taken 25 head Works, and the counter measures against the causes of their disasters summarized was as follows, 1. In the aspect of planning a. As the flood water level after the establishment of head works is more increased than the level before setting of head works owing to having more gentle slope of river bed between the head works than nature slope of river bed. Number of head works should be reduced for the appropriate annexation of them b. In the place where head works is established on the curved point of levee, the destruction of levee becomes severe by the strong deflective current. Therefore the setting of head works on the curved point should be kept off as long as possible and in case of unavoidable circumstances the construction method such as reinforced concrete wall or stone wall filed with concrete and anchored bank revetments should be considered. 2. In the aspect of design a. As scoring phenomena at up stream is serious around the weir Where the concentration of strong current is present in such a place, up stream apron having impermeability should be designed to resist and prevent scoring. b. As the length of apron and protected bed is too short to prevent scoring as down stream bed, the design length should be taken somewhat more than the calculated value, but in the case the calculated length becomes too long to be profitable, a device of water cushion should be considered. c. The structure of protected river bed should be improved to make stone mesh bags fixed to apron and to have vinyl mattress laid on river bed together with the improvement for increasing the stability of stone mesh bags and preventing the sucked sand from the river bed. d. As the shortage of cut-off length, especialy in case of the cutoffs conneting both shore sides of river makes the cause of destruction of embankment and weir body, the culculation of cut-off length should be taken enough length based on seepage length. 3. In the aspect of design and constructions a. The overturing destruction of weir by piping action was based on the jet water through cracks at the construction and expansion joints. therefore the expansion joint should be designed and constructed with the insertion of water proof plate and asphalt filling, and the construction joint, with concaved shape structure and steel reinforcement. b. As the wrong design and construction of the weep holes on apron will cause water piping and weir destruction, the design and construction of filter based on the rule of filter should be kept for weep holes. c. The wrong design and construction of bank revetment caused the severe destruction of levee and weir body resulting from scoring and impulse by strong current and formation of water route behind the revetment. Therefore bank revetment should be designod and constructed with stone wall filled with concrete and anchored, or reinforced concrete wall to prevent the formation of water flow route behind the wall and to resist against the scoring and impulse of strong stream. 4. In the aspect of maintenance When the damaged parts occurred at head works the authorities and farmers concerned should find and mend them as soon as possible with mutual cooperation, and on the other hand public citizen should be guided for good use of public property.

  • PDF