• Title/Summary/Keyword: Off-Site Risk Assessment

Search Result 44, Processing Time 0.03 seconds

Multi-unit Level 2 probabilistic safety assessment: Approaches and their application to a six-unit nuclear power plant site

  • Cho, Jaehyun;Han, Sang Hoon;Kim, Dong-San;Lim, Ho-Gon
    • Nuclear Engineering and Technology
    • /
    • v.50 no.8
    • /
    • pp.1234-1245
    • /
    • 2018
  • The risk of multi-unit nuclear power plants (NPPs) at a site has received considerable critical attention recently. However, current probabilistic safety assessment (PSA) procedures and computer code do not support multi-unit PSA because the traditional PSA structure is mostly used for the quantification of single-unit NPP risk. In this study, the main purpose is to develop a multi-unit Level 2 PSA method and apply it to full-power operating six-unit OPR1000. Multi-unit Level 2 PSA method consists of three steps: (1) development of single-unit Level 2 PSA; (2) extracting the mapping data from plant damage state to source term category; and (3) combining multi-unit Level 1 PSA results and mapping fractions. By applying developed multi-unit Level 2 PSA method into six-unit OPR1000, site containment failure probabilities in case of loss of ultimate heat sink, loss of off-site power, tsunami, and seismic event were quantified.

A STUDY ON METHODOLOGY FOR IDENTIFYING CORRELATIONS BETWEEN LERF AND EARLY FATALITY

  • Kang, Kyungmin;Jae, Moosung;Ahn, Kwang-Il
    • Nuclear Engineering and Technology
    • /
    • v.44 no.7
    • /
    • pp.745-754
    • /
    • 2012
  • The correlations between Large Early Release Frequency (LERF) and Early Fatality need to be investigated for risk-informed application and regulation. In Regulatory Guide (RG) -1.174, while there are decision-making criteria using the measures of Core Damage Frequency (CDF) and LERF, there are no specific criteria on LERF. Since there are both huge uncertainties and large costs needed in off-site consequence calculation, a LERF assessment methodology needs to be developed, and its correlation factor needs to be identified, for risk-informed decision-making. A new method for estimating off-site consequence has been presented and performed for assessing health effects caused by radioisotopes released from severe accidents of nuclear power plants in this study. The MACCS2 code is used for validating the source term quantitatively regarding health effects, depending on the release characteristics of radioisotopes during severe accidents. This study developed a method for identifying correlations between LERF and Early Fatality and validates the results of the model using the MACCS2 code. The results of this study may contribute to defining LERF and finding a measure for risk-informed regulations and risk-informed decision-making.

Validation of the Risk Prediction Tool for Wound Infection in Abdominal Surgery Patients (복부 수술환자의 수술부위 감염 위험 예측 도구의 타당도 검증)

  • Jung, Hyun Kyoung;Lee, Eun Nam
    • Journal of Korean Critical Care Nursing
    • /
    • v.15 no.3
    • /
    • pp.75-87
    • /
    • 2022
  • Purpose : This retrospective investigation study aimed to determine the predictive validity of superficial surgical site infection assessment tools by measuring the risk score at the surgical site. Methods : This study included patients hospitalized to the general surgery department of a Hospital from January 2021 to December 31, 2021. The inclusion criteria were age ≥19 years, general abdominal surgery under general anesthesia, and hospital stay longer than 2 days. Patients who had undergone transplantation were excluded. Results : Tool validity results showed that tools including surgical time and operative procedure were more accurate than previously developed tools, with a sensitivity of 71.1%, specificity of 71.4%, positive prediction of 12.3%, negative prediction of 97.8%, and area under the curve of 0.743 (95% confidence interval, 0.678~0.745). The tool's cut-off score was 15, and the risks of infection was increased by 6.14 times at or above this cut-off point. Preoperative hair removal period, surgical wound classification, surgery time, body temperature on the second day after surgery, drainage tube type, and suture type affected the risk of infection at the surgical site. Conclusion : The incidence of healthcare-associated infections has been declining in the past decade; however, surgical site infections still account for a considerable proportion. Therefore, early identification of high-risk groups for surgical site infection is crucial for reducing the incidence of surgical site infection using appropriate management.

A Study on Development of Pre-Hazards Risk Analysis Guide Tool (연구실 위험분석을 위한 사전유해인자 가이드 Tool 개발 연구)

  • Choi, Byeong Kyu;Rhie, Kwang Won
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.4
    • /
    • pp.133-140
    • /
    • 2017
  • The Ministry of Science, ICT and Future Planning made law for Pre-Hazard Risk Analysis in December 31, 2014 to protect researchers from continuing accidents in laboratory. Conducted before an experiment, Pre-Hazard Risk Analysis finds hazards of the experiment and rules to manage the hazards.So the Pre-Hazard Risk Analysis can support laboratory safety system by prevent accidents in laboratory. Pre-Hazards Risk Analysis is newly created system so that executors need Guidelines to perform this analysis properly. This study is to develop guide tool for Pre-Hazard Risk Analysis by analyzing other risk assessment systems; PSM, Off-site Consequence Assessment, laboratory safety system. Also, this study suggested how to establish database for Pre-Hazard Risk Assessment by analyse KRAS.

A Study on the Factors Affecting the Influence Ranges of Ammonia Leakage by Using KORA Program (KORA 프로그램을 활용한 암모니아 누출사고 영향범위 결정 기여요인 연구)

  • Lim, Hyeongjun;Kwak, Sollim;Jung, Jinhee;Ryu, Taekwon;Choi, Woosoo;Lee, Jieun;Lee, Jinseon;Lee, Yeonhee;Kim, Jungkon;Yoon, Junheon;Ryu, Jisung
    • Journal of the Korean Institute of Gas
    • /
    • v.22 no.3
    • /
    • pp.38-44
    • /
    • 2018
  • Ammonia is used primarily as a refrigerant in refrigeration facility and SCR of a plant, and is frequently involved in leakage accidents. This study was conducted by selecting ammonia, a material with a wide influence range when evaluated, as a material with higher vapor pressure and lighter than air. In this study, the influence ranges were computed using KORA(Korea Off-site Risk Assessment supporting tool) with four different environmental factors : ground roughness, sealing, operating temperature, pressure, and leakage hole size. As a result, the difference in the influence range of ground roughness is approximately 4.62 times, while the ammonia storage tank shows a difference in the reduction rate of 0.64 when sealed. The extent of impact increased with increasing leakage depending on storage temperature and pressure, and when storing higher than the saturation vapor pressure, the impact range showed an average growth rate of 3.45 % per 0.1 Mpa($45^{\circ}C$). The influence ranges based on the size of the leakage holes is shown to be proportional to the area of the leakage zone.

Offsite Risk Assessment on Toxic Release (독성물질 저장설비의 사고시 사업장외에 미치는 영향평가)

  • Park, Kyoshik
    • Journal of the Korean Institute of Gas
    • /
    • v.21 no.3
    • /
    • pp.9-16
    • /
    • 2017
  • Toxic release is one of the most interested area in evaluating consequence to the vicinity of industry facilities handling hazardous materials. Chloric acid production facility is selected and toxic release is evaluated to assess the risk impacted to its off-site. Accident scenarios were listed using process safety information. The scenarios having effect to the off-site were selected and assessed further according to guideline provided by Korea government. Worst case and alternative scenarios including other interested scenarios were evaluated using ALOHA. Each evaluated scenario was assessed further considering countermeasures. The results showed that the facility handling chloric acid is safe enough and needed no further protections at the moment.

Offsite Risk Assessment on Chloric Acid Release (염산취급시설의 사고시 사업장외에 미치는 영향평가)

  • Park, Kyoshik
    • Korean Chemical Engineering Research
    • /
    • v.54 no.6
    • /
    • pp.781-785
    • /
    • 2016
  • Chloric acid is a toxic chemical and the risk of facility handling chloric acid was assessed from the list of accident scenario to provide countermeasure to keep the vicinity safe. Accident scenarios were listed by using MSDS and process safety information. The scenarios having effect to the off-site were selected and assessed further according to guideline provided by Korea government. Worst case and alternative scenarios including other interested scenarios were evaluated using ALOHA. Each evaluated scenario was assessed further considering countermeasures. The results showed that the facility handling chloric acid is safe enough and needed no further protections at the moment.

Damage Effects Modeling by Chlorine Leaks of Chemical Plants (화학공장의 염소 누출에 의한 피해 영향 모델링)

  • Jeong, Gyeong-Sam;Baik, Eun-Sun
    • Fire Science and Engineering
    • /
    • v.32 no.3
    • /
    • pp.76-87
    • /
    • 2018
  • This study describes the damage effects modeling for a quantitative prediction about the hazardous distances from pressurized chlorine saturated liquid tank, which has two-phase leakage. The heavy gas, chlorine is an accidental substance that is used as a raw material and intermediate in chemical plants. Based on the evaluation method for damage prediction and accident effects assessment models, the operating conditions were set as the standard conditions to reveal the optimal variables on an accident due to the leakage of a liquid chlorine storage vessel. A model of the atmospheric diffusion model, ALOHA (V5.4.4) developed by USEPA and NOAA, which is used for a risk assessment of Off-site Risk Assessment (ORA), was used. The Yeosu National Industrial Complex is designated as a model site, which manufactures and handles large quantities of chemical substances. Weather-related variables and process variables for each scenario need to be modelled to derive the characteristics of leakage accidents. The estimated levels of concern (LOC) were calculated based on the Gaussian diffusion model. As a result of ALOHA modeling, the hazardous distance due to chlorine diffusion increased with increasing air temperature and the wind speed decreased and the atmospheric stability was stabilized.

A Study on Application Method & System Introduction of Laboratory Pre-hazards Risk Analysis (연구실 사전유해인자위험분석 적용방안 및 제도도입 연구)

  • Cho, Nam Joon;Ji, Yong Gu
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.4
    • /
    • pp.126-135
    • /
    • 2016
  • The purpose of this study is to develop risk assessment techniques and institutional analysis of domestic and international, the management techniques that can efficiently manage the harmful factor of the laboratory and to present the institutional measures that can be efficiently implemented. Due to a variety of adverse factors of laboratory, accidents of laboratory of various forms have occurred, but there is no risk assessment system in order to manage this effectively. So, we investigated this domestic existing risk assessment methods and the outside of the risk assessment system, and also analyzed accidents of domestic laboratory that occurred in 2014. In addition, we targeted the 24 laboratories in 21 universities to investigate the management of harmful factors of the laboratory and performed applying test for 12 domestic laboratories. Existing risk evaluation system, such as PMS, SMS, off-site impact assessment, since the industrial site is the subject, is a difficult problem to be directly applied to the laboratory of the research institute. So, we implemented management status and harmful factors survey and classified the research and development activities based on this data. Finally we developed "pre-hazards risk analysis method" to create each of the safety management measures. In addition, research activities personnel conducted voluntarily risk assessment, which is shared by institutions and government. It is presented the institutional system for safety management of laboratory. Its result, pre-hazards risk analysis method and institutionalization scheme will be able to achieve laboratory accident prevention system.

Multi-unit Level 3 probabilistic safety assessment: Approaches and their application to a six-unit nuclear power plant site

  • Kim, Sung-yeop;Jung, Yong Hun;Han, Sang Hoon;Han, Seok-Jung;Lim, Ho-Gon
    • Nuclear Engineering and Technology
    • /
    • v.50 no.8
    • /
    • pp.1246-1254
    • /
    • 2018
  • The importance of performing Level 3 probabilistic safety assessments (PSA) along with a general interest in assessing multi-unit risk has been sharply increasing after the Fukushima Daiichi nuclear power plant (NPP) accident. However, relatively few studies on multi-unit Level 3 PSA have been performed to date, reflecting limited scenarios of multi-unit accidents with higher priority. The major difficulty to carry out a multi-unit Level 3 PSA lies in the exponentially increasing number of multi-unit accident combinations, as different source terms can be released from each NPP unit; indeed, building consequence models for the astronomical number of accident scenarios is simply impractical. In this study, a new approach has been developed that employs the look-up table method to cover every multi-unit accident scenario. Consequence results for each scenario can be found on the table, established with a practical amount of effort, and can be matched to the frequency of the scenario. Preliminary application to a six-unit NPP site was carried out, where it was found that the difference between full-coverage and cut-off cases could be considerably high and therefore influence the total risk. Additional studies should be performed to fine tune the details and overcome the limitations of the approach.